Skip to content

Graph Accuracy Audit: rebalance the four lanes on measured gate times (Part of #5501) - #6588

Merged
squid-shepherd[bot] merged 1 commit into
mainfrom
churn/5501-20261025T0438Z
Oct 25, 2026
Merged

squid-shepherd[bot] merged 1 commit into
mainfrom
churn/5501-20261025T0438Z

Conversation

@squid-protocol

@squid-protocol squid-protocol commented Oct 25, 2026 •

Copy link
Copy Markdown
Owner

Part of #5501. Checklist: partial [c:5b57f5a0] -- the 5 min target is unmet on one runner; only a second runner (2-job split) can reach it.

Measurement: first non-draft run after #6581 (merged 03:44Z)

Run 40160191245 (PR "cpp call graph: choose overloads by argument count", head 23b74e0), 2026-10-25.

Item Value
plan job 14 s (queued 2.3 min)
gate job queue wait 8.5 min (outside the workflow)
gate job exec 10.8 min (setup 77 s, gate step 559 s = 9.3 min)
runner-minutes ~11 (about 12 billed)
PR wall time ~19 min with queue, ~11 min without

Gate times (s): cpp 315, import-graph-1 295, span-shard-1 253, import-graph-2 216, java 192, span-shard-0 160, import-graph-3 147, python 96, rust 41, c 31, go 23, typescript 17, javascript 14 (sum 1800).
Lanes before: 349 / 487 / 417 / 547 (step = max lane + merge). The gate step is over 5 min, so the brief's rule applies.

Change

Rebalanced the four lanes (longest first): A cpp+python+c = 442, B import-graph-1+3+js = 456, C span-shard-1+java+ts = 462, D import-graph-2+span-shard-0+rust+go = 440 (from the contended times above). Expected gate step ~460 s from 547 s (~1.5 min per run), same runner count, same --samples, baselines and --ci per gate. cpp and import-graph-1 (CPU-heavy) stay on separate lanes. call-java was not split: at 192 s it is not the long pole. New test pins each of the 13 gates (and both span shards) to exactly one lane slot.

Reach

No plan change: same PRs trigger it (4-5/day), same gates per PR. Runner-minutes per run drop by about the saved 1.5 min.

Remaining slices

Facts checked: ruff/mypy/dead-key/format via audit_check, pr_gates.py --fast 7/7, pytest tests/tools/test_graph_accuracy_plan.py 72 passed; workflow YAML parses. Engine untouched, no golden bless.

Lessons for agents

None new.

🤖 Generated with Claude Code

Class / Sibling gaps

Copied from the worker's report by promoter-bot's precheck.

Sibling gaps. None found. No burned-estate program is involved.

…ate times (Part of #5501)

Max lane was 547 s (cpp + import-graph-3 + four small gates); the sum is 1800 s, so ~450 s is the floor on 4 cores.
Longest-first assignment: A cpp/python/c, B import-graph-1/-3/js, C span-shard-1/java/ts, D import-graph-2/span-shard-0/rust/go.
A test pins every gate to exactly one lane slot.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@squid-protocol squid-protocol added the shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md label Oct 25, 2026
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

@squid-shepherd
squid-shepherd Bot marked this pull request as ready for review October 25, 2026 04:45
@github-actions

Copy link
Copy Markdown
Contributor

🐦‍⬛ Muninn Security Scan

✅ No security issues found.

🐦‍⬛ Powered by Muninn · Skald Lab

@squid-shepherd
squid-shepherd Bot enabled auto-merge (squash) October 25, 2026 04:50
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

@squid-shepherd
squid-shepherd Bot merged commit 0cb15ec into main Oct 25, 2026
68 checks passed
@squid-shepherd
squid-shepherd Bot deleted the churn/5501-20261025T0438Z branch October 25, 2026 05:28
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant