Skip to content

Graph Accuracy Audit: import-graph as three subsets, lanes rebalanced (Part of #5501) - #6581

Merged
squid-shepherd[bot] merged 1 commit into
mainfrom
churn/5501-20261025T0204Z
Oct 25, 2026
Merged

squid-shepherd[bot] merged 1 commit into
mainfrom
churn/5501-20261025T0204Z

Conversation

@squid-protocol

Copy link
Copy Markdown
Owner

Part of #5501.

Checklist: done [c:5b57f5a0]

What

The one-job, four-lane layout (#5562 / #6100 / #6355 / #6371 / #6503) already splits the gates with their own baselines and summaries. The lanes were unbalanced: the 444 s import-graph gate and the 539 s java/python/cpp/rust/go chain set the 551 s critical path while the span lanes idled for ~4 min. This PR:

  • runs import-graph as three language subsets (import-graph-1..3, --jobs 2), each its own --ci baseline gate over its subset; the subsets cover LANGS exactly once (new test);
  • rebalances the four lanes (longest-first from the measured times, ~410 s each by sum);
  • appends a per-gate time table to the step summary.
    Check name, baselines, --samples and the plan job are unchanged (import-graph-N maps to the planned import-graph gate).

Measured (before)

Run 40142804644 gate step 551 s (lanes ~522 / ~539 / 224 / 311 s); sum of gate times ~1596 s. Expected after: gate step ~410-430 s (-120 s); runner-minutes about unchanged (same work, one job). Queue wait (5-18 min) is outside the workflow, so the 5 min wall target stays unmet; the real after-number comes from this PR's first non-draft run (the new summary table prints it).

Sibling gaps

call-java (227 s) is now the longest indivisible gate; call-graph-accuracy-audit.yml lanes untouched. No burned-estate program needs either.

Tests

test_graph_accuracy_plan.py (101 pass incl. subset-coverage), test_ci_retry.py, audit_check.py all clear. Lane script bash -n ok.

Lessons for agents

Per-language import-graph cost (s, local, serial): tcl 54, python 38, objective-c 29, csharp 24, c 21, others 7-19.

🤖 Generated with Claude Code

@squid-protocol squid-protocol added shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md and removed shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md labels Oct 25, 2026
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

@squid-shepherd
squid-shepherd Bot marked this pull request as ready for review October 25, 2026 02:43
@github-actions

Copy link
Copy Markdown
Contributor

🐦‍⬛ Muninn Security Scan

✅ No security issues found.

🐦‍⬛ Powered by Muninn · Skald Lab

@squid-shepherd
squid-shepherd Bot enabled auto-merge (squash) October 25, 2026 02:57
@squid-shepherd
squid-shepherd Bot merged commit 4ade187 into main Oct 25, 2026
70 checks passed
@squid-shepherd
squid-shepherd Bot deleted the churn/5501-20261025T0204Z branch October 25, 2026 03:44
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

1 similar comment
@squid-shepherd

Copy link
Copy Markdown
Contributor

No description provided.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant