Repository navigation
DELAY faults in the equivalence harness: EXPIRED and INVREQ planned per scenario; CRDTAGY1-5 reach the failure branch (Part of #6271) - #6318
Conversation
…er scenario, CRDTAGY1-5 reach the failure branch (Part of #6271) (X72) A scenario can plan a failed DELAY (EXPIRED; INVREQ RESP2 4/5/6/22) on the stub and the det port alike. CBSA CRDTAGY1-5 gain a delay-invreq-seconds-out-of-range scenario, so the A010 DELAY-failure arm (stated infeasible before) is now reached and its infeasible entries are removed. Register X72 states IBM's conditions and refuses NORMAL RESP2 23. Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
No description provided. |
|
No description provided. |
|
PR #6318 @ 886bdbf: 1 failed check(s) == ground-truth part 1/2 (failure) -- real |
…ned fault, not stated infeasible (Part of #6271) The PR removed the DELAY-failure entry from infeasible_outcomes/cbsa-crdtagy1-5.json; the #6123 pin still expected two entries. It now expects the one PUT CONTAINER entry and a DELAY fault in the case. Co-Authored-By: Claude Opus 5.5 <[email protected]>
|
No description provided. |
|
No description provided. |
Part of #6271 (slice 3 of 5: the DELAY fault). Slices 1 (#6286) and 2 (#6292) merged.
Checklist: done [c:14e85615]
What changed
DELAY:{"cmd": "DELAY", "resp": "EXPIRED|INVREQ", "resp2": n}(INVREQ RESP2 4/5/6/22; EXPIRED names none). The C stub (GGCDLAY) and the det port (CicsTaskControl.delayviaCicsTask.planned) both honour it: the delay is not performed, RESP/RESP2/EIBRESP carry the plan, HANDLE CONDITION fires when no RESP is coded.delay-invreq-seconds-out-of-range(plus the ABNDPROC program and ABNDFILE dataset the failure arm LINKs to, mirroring cbsa-bnkmenu).Evidence (CBSA CRDTAGY1-5, det port vs GnuCOBOL + stub)
All five: translated 57/57, proved on every scenario. The one uncovered branch outcome in each is the PUT CONTAINER failure (a stated-infeasible entry, CHANNELERR 3, unchanged). The oracle is GnuCOBOL plus our stub, not z/OS.
Plan was partly wrong: the DELAY-failure outcome was stated infeasible in
infeasible_outcomes/cbsa-crdtagy1-5.json(true for the natural 1-2 second interval); a planned fault reaches it, so the sweep failed until those five entries were removed. RESP2 22 was added to the plan's 4/5/6 after reading IBM.Re-prove after the DELAY lowering changed
det_port.py checklisted 41 ports whose generated Java changed (DELAY now readstask.plannedfirst). All 41 were re-proved withdet_port.py run: 39 PROVED, 2 DIFFER:cbsa-crecust(#4952) andcbsa-bnk1ccs-create(#5089). Both are already intests/equivalence/det_sweep_baseline.json(the CEEDAYS 10-byte-picture issue), so they are not caused by this PR. The 39 include CRDTAGY1-5, the-generatedvariants, the asynccc cases, carddemo and zecs-zecs000.Class / Sibling gaps
Class: commands whose failure arm the harness cannot reach because no fault can be planned on them (slice 1 file commands, slice 2 terminal/unit-of-work commands, this slice DELAY). Siblings, each with the burned program that needs it:
RETURN TRANSIDwith RESPRemaining slices: CEEDAYS model, X6 WRITEQ, paragraph-level infeasible outcomes.
Hand-written files
equivalence_cics.py(4 lines + message register id; overlaps #5898/#5900, merged origin/main),ggcics_taskcontrol.c,det/cics_taskcontrol.py,X72.md,test_equivalence_cics_fault_resp.pyare the five. Two more tests had to follow the changed DELAY lowering and the new fault command:test_det_translate.py,test_strengthen_loop.py(over the limit of five, to fix this PR's own failures);test_cbsa_slice2_6072.py(the #6123 pin of the two CRDTAGY infeasible entries) now expects the one PUT CONTAINER entry plus a planned DELAY fault (Opus rescue).Lessons for agents
infeasible_outcomesentry: greptests/for tests pinning that case's entry count (test_cbsa_slice2_6072.pypinned CRDTAGY's).infeasible_outcomes/<case>.jsonin the same PR._FAULT_RESP/_NAMELESSintest_strengthen_loop.pyand any test pinning the command's first lowered line (test_det_translate.py).Cross-repo
None: no companion PR in another repo.
🤖 Generated with Claude Code