Skip to content

DL/I unit-of-work calls: pin the burned set, XRST/ROLB/SYNC refused (Part of #5233) - #6151

Merged
squid-protocol merged 1 commit into
mainfrom
churn/5233-20261023T0409Z
Oct 23, 2026
Merged

squid-protocol merged 1 commit into
mainfrom
churn/5233-20261023T0409Z

Conversation

@squid-protocol

Copy link
Copy Markdown
Owner

Checklist: done [c:c23645fc]

Part of #5233. The unit-of-work item was already built by earlier slices (#5278 SCHD/TERM, #5857 CHKP ID in a BMP, #6013/#6035/#6057 fault scenarios, #6138); this PR pins and documents it.

Class: DL/I unit-of-work calls (SCHD / TERM / CHKP / XRST / ROLB / SYNC) in the burned IMS programs.

Member Status
EXEC DLI SCHD / TERM (COPAUA0C, COPAUS0C, COPAUS1C) translated, run on both runtimes, SCHD fault scenarios
EXEC DLI CHKP ID (CBPAUP0C) translated, run, CHKP failure scenario
XRST / ROLB / SYNC (and ROLL/ROLS) no burned program issues them; refused by name on both runtimes (mainframe-evidence-policy 2)

Changes

  • tests/cobol_mainframe/test_dli_uow_burned_5233.py: scans the 8 burned DL/I programs; the UOW verbs used are exactly SCHD, TERM, CHKP; runtime rules exist; XRST/ROLB/ROLL/ROLS/SYNC are in the refusal list of both DetDli.java and ggdli.c. Skips if the corpus is absent.
  • docs/language_status/register/I5.md: drops the stale "COPAUS0C and COPAUS1C have no case yet", states the UOW finding.

No engine, translator, case or golden change; no evidence level moved.

Gates: pr_gates --fast 7/7; tree-wide guards 196 passed (with the new test). --ratchets not run (no parsing, port or case input changed).

Sibling gaps: XRST/ROLB/SYNC and CBLTDLI-call CHKP: no burned program, lowest priority. GSAM read PCBs (DBUNLDGS), I/O PCB / MFS (PAUDBLOD), CBLTDLI from CICS: their own boxes.

🤖 Generated with Claude Code

…ROLB/SYNC refused by name (Part of #5233)

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@squid-protocol squid-protocol added the shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md label Oct 23, 2026
@squid-protocol

Copy link
Copy Markdown
Owner Author

No description provided.

1 similar comment
@squid-protocol

Copy link
Copy Markdown
Owner Author

No description provided.

@squid-protocol
squid-protocol marked this pull request as ready for review October 23, 2026 04:14
@squid-protocol
squid-protocol enabled auto-merge (squash) October 23, 2026 04:14
@squid-protocol
squid-protocol merged commit b0170c7 into main Oct 23, 2026
51 checks passed
@squid-protocol
squid-protocol deleted the churn/5233-20261023T0409Z branch October 23, 2026 04:19
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant