Skip to content

GenApp L4 lift: lgipdb01 20-row cap reached; lgacdb01/lgucdb01 EIBCALEN<91 recorded infeasible (Part of #5864) - #6076

Merged
squid-protocol merged 2 commits into
mainfrom
churn/5864-20261022T2201Z
Oct 22, 2026
Merged

squid-protocol merged 2 commits into
mainfrom
churn/5864-20261022T2201Z

Conversation

@squid-protocol

Copy link
Copy Markdown
Owner

Part of #5864

What

GenApp slice of the L4 lift (lgacdb01 13/14, lgipdb01 73/74, lgucdb01 9/10).

Program Missing net branch Resolution
lgipdb01 IF ICOM-Record-Count > 20 true (line 907) New scenario customer-cursor-21-rows plus seed rows (customer 11, 21 commercial policies 201-221). 73/74 -> 74/74, 56 scenarios.
lgacdb01 IF EIBCALEN < 91 true (line 314, WRITE-ERROR-MESSAGE) Reviewed infeasible outcome, family G
lgucdb01 IF EIBCALEN < 91 true (line 208, WRITE-ERROR-MESSAGE) Reviewed infeasible outcome, family G

Why infeasible: the arm needs a failing INSERT/UPDATE with a 1-90 byte COMMAREA, but the host variables lie past byte 90 of LGCMAREA, so the reference is refused on both sides (X23). The only callers (LGACUS01, LGUCUS01) LINK with LENGTH(32500).

Class

Error-message length guards unreachable because the guarded statement needs a longer COMMAREA than the guard admits. Members: lgacdb01:314, lgucdb01:208.
Sibling gaps: the genapp-*-generated twin cases are not covered by the new entries; the "OPEN failing ('89')" note in the lgipdb01 case notes may be stale (the sweep showed only 907:true uncovered). Neither changes this slice's numbers.

Cross-repo

None. Overlap: PR #5958 also edits infeasible_outcomes.json (CBSA keys). Entries here sit before genapp-lgacvs01/genapp-lgucvs01 to keep a merge trivial; origin/main merged before push.

Facts checked: sweep uncovered set was exactly 314:true, 907:true, 208:true; after the change infeasible_outcomes.py check on the sweep says ok; pr_gates.py --fast 7/7, --ratchets 9/9; targeted tests (infeasible_outcomes, proof_blockers, evidence, det_coverage_ledger, source_reads) 113 passed. No evidence record exists for these three cases, so nothing to re-prove. Only the lgipdb01 coverage ledger was updated; lgacdb01/lgucdb01 ledger moves were harness/oracle-only and left out.

Checklist: done [c:8e5b3f5d]

🤖 Generated with Claude Code

squid-protocol and others added 2 commits October 22, 2026 18:09
…BCALEN < 91 arms recorded infeasible (Part of #5864)

lgipdb01: a customer holding 21 commercial policies makes the 21st Cust_Cursor
FETCH take IF ICOM-Record-Count > 20 true (73/74 -> 74/74).
lgacdb01 line 314 and lgucdb01 line 208: IF EIBCALEN < 91 true needs a 1-90 byte
COMMAREA whose host variables lie past byte 90 (X23), and the only callers LINK
with LENGTH(32500); recorded in infeasible_outcomes.json with the reason.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@squid-protocol squid-protocol added the shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md label Oct 22, 2026
@squid-protocol

Copy link
Copy Markdown
Owner Author

No description provided.

@squid-protocol
squid-protocol marked this pull request as ready for review October 22, 2026 22:15
@squid-protocol

Copy link
Copy Markdown
Owner Author

No description provided.

@squid-protocol
squid-protocol enabled auto-merge (squash) October 22, 2026 22:15
@squid-protocol
squid-protocol merged commit 4eb8668 into main Oct 22, 2026
51 checks passed
@squid-protocol
squid-protocol deleted the churn/5864-20261022T2201Z branch October 22, 2026 22:23
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

shepherd:merge Maintainer: merge when green (auto-merge, squash). Guide: docs/ci.md

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant