Repository navigation
equivalence: a planned SCHD TC leaves the PSB scheduled, so TERM after it is valid (Part of #5233) - #6057
Conversation
…r it is valid (Part of #5233) TC is IBM's "PSB already scheduled". The planned fault was not performed, so COPAUA0C's TERM + re-SCHD path (PSB-SCHEDULED-MORE-THAN-ONCE) refused with "a TERM with no PSB scheduled". Both twins (ggdli.c, DetDli) now schedule the PSB when the planned status is TC and nothing is held; other planned SCHD statuses stay not-performed. Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
No description provided. |
|
PR #6057 @ c4dac52: 3 failed check(s) == ground-truth (failure) -- real == ground-truth part 3/4 (failure) -- real == ground-truth part 4/4 (failure) -- real |
…5233) Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
CI shepherd: the head of this PR (b1d8767) is not the one a maintainer labelled |
|
No description provided. |
|
No description provided. |
1 similar comment
|
No description provided. |
|
PR #6057 @ b1d8767: 1 failed check(s) == det (failure) -- real |
…t of #5233) Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
CI shepherd: the head of this PR (e9c2ff2) is not the one a maintainer labelled |
|
No description provided. |
|
No description provided. |
Part of #5233 (slice 5: TERM after a planned SCHD
TC).Design. A planned SCHD with status
TCis IBM's "PSB already scheduled", so the twins (ggdli.cGGDLISCHD,DetDli.schedule) now schedule the PSB and answerTCwhen nothing is held. Before, the planned fault was "not performed", so COPAUA0C'sPSB-SCHEDULED-MORE-THAN-ONCEpath (TERM, then SCHD again) refused with "a TERM with no PSB scheduled". Other planned SCHD statuses stay not-performed; a genuine TERM with nothing scheduled still refuses by name.Class / siblings. Class: a planned DL/I status must leave the scheduled-PSB state IBM would have. Planned TC when already held: already handled. Other planned SCHD statuses: unchanged. Planned CHKP/GU/GN/GNP/ISRT/REPL/DLET: no schedule-state effect. Gap: a planned TERM fault (no burned program branches on one).
Evidence.
schd-already-held(SCHD nth 1 TC): equal on 10 records; 18/18 runs, 4 fault runs.det_port.py check: 172/177 unchanged; the 5 changed re-proved withdet_port.py run: cbpaup0c, copaua0c, copaus0c, copaus1c, paudbunl all PROVED.test_det_dli.py(TC then TERM and SCHD; AI then TERM refused; planned TC while held). Related DLI tests: 241 passed, 6 skipped.pr_gates --fast: 7/7.pr_gates --ratchets, no golden re-bless (no parsing change).Cross-repo: none.
🤖 Generated with Claude Code