Repository navigation
Description
What
Java: 5 keyword-family cells are below 0.8 (the weaker of recall and precision) on at least 10 oracle functions of the pinned language-crucible, from tests/family_validity_baseline.json on main. Part of the epic #8863 (keyword-family validity).
Red cells
- bitwise_ops: recall 0.00, precision - (0 fire vs 10 the parser sees) -- misses
- regex_execution: recall -, precision 0.00 (1 fire vs 0 the parser sees) -- over-counts
- time_date_logic: recall 0.38, precision 1.00 (6 fire vs 16 the parser sees) -- misses
- closures: recall 1.00, precision 0.63 (46 fire vs 29 the parser sees) -- over-counts
- debug_prints: recall 1.00, precision 0.65 (31 fire vs 20 the parser sees) -- over-counts
How
Follow .claude/skills/family-validity-fix/SKILL.md and docs/agents/family-validity-checklist.md (rulings already made, the cause table, recipes, PR checklist). Per cell: re-measure on current origin/main first (many are already fixed or were the oracle's error), name the cause class, read the contract, trace before editing, make the smallest fix, test both directions, then CPU, keyword-rosetta and a clean-venv golden bless once for the PR. python tests/tools/family_red_cells.py --lang java prints the cells with their contract sentences. One PR for Java only. A contract that is draft or silent is a question to file on #8863, not a reason to stop.
Checklist
- Java keyword families: bring every red cell above to 0.8 or better on the pinned crucible, or file the contract question for it, in one PR (Java keyword families: closures, bitwise, regex, time rules and the print oracle count the named construct (Part of #8863, #9336) #9377)
Done when: every cell is 0.8 or better on the pinned crucible, or has a filed question; the PR carries the family-validity checklist.
Activity
squid-protocol commentedon Nov 26, 2026
Claimed by promoter-bot host
melek, lease renewed 2026-11-26T10:29Z. It lapses after 6 h without a renewal. To take it back, assign someone or remove theclaim:meleklabel.squid-protocol commentedon Nov 26, 2026
Churn run
9336-20261126T0446Z(host melek) ended without a PR. plan-held on overlap with 9334; requeued behind itruff format java.py (Part of #8863, #9336)
Re-bless the scan-output snapshots after merging main (Part of #8863, #…
squid-protocol commentedon Nov 26, 2026
Siblings from PR #9377 (no new issues filed; no burned-estate program shown to need them): same
&/|bitwise gap may exist in Kotlin, Scala, C, Rust; Rust regex_execution moved to the pinned corpus by the baseline sweep;::method references uncounted (contract question). Remaining: keyword-rosetta dry-run for Java.Re-bless the scan-output snapshots after merging main (Part of #8863, #…
Regenerate the family-validity SVGs (Part of #8863, #9336)
Re-bless goldens and regenerate family-validity SVGs after merging ma…
squid-protocol commentedon Nov 26, 2026
Churn run
9336-20261126T1039Z(host melek) ended without a PR. plan-held on shared baseline file; plan approved, sent backJava regex_execution: keep string-literal, chained-line receivers for…
Re-bless goldens and regenerate family-validity SVGs after merging ma…
Java keyword families: closures, bitwise, regex, time rules and the p…
squid-protocol commentedon Nov 26, 2026
PR #9377 brings every Java cell with 10+ oracle functions on the pinned crucible to 0.8+ (closures, bitwise_ops; regex_execution has no instances; time_date_logic and debug_prints are faded and 1.00/1.00). Acceptance met; closing.