Description
Owner decision 2026-11-21. System testing becomes its own ladder, S0-S4, rated per job / flow and per estate, beside the per-program ladder L0-L5. The factory's priority moves from L5 to S2. The L levels keep their numbers: nothing is renamed.
Why a second ladder, not a rung
Ladder rungs nest: each implies the ones below. System proof does not nest with L0-L5 either way:
- a program can be L4 (every branch outcome taken) inside a job that breaks at a hand-off: a VSAM file carried wrong, a GDG generation off by one, an IDCAMS step not modelled, a COND that skips the wrong step. L5 cannot see any of these: it mutates one port at a time;
- a job's chain can be proven while its steps are at L2: a chain proof does not need each step's branch coverage.
A rung between L4 and L5 would block the wrong things (a chain proof waiting on every step's L4) or grant L5 for a job run once. Renaming would also cost ~220"L0".."L5"literals in code, 133 docs and the ladder ledgers for no gain in meaning.
Why move the priority
- L0-L4 takes about a day per program; L5 has been taking weeks per program.
- The definition of done already promises L3 for online programs and L4 for critical ones, L5 on request (docs/language_status/definition_of_done.md). Weeks of L5 per program are work past the promise.
- What a buyer asks first is whether the batch window and the online flows still produce the same data. That is the S axis, and it is wide open: one chained job case (CardDemo TRANREPT).
The S ladder
| level | meaning (per job or flow; an estate's S level is the share of its jobs / flows at each) |
|---|---|
| S0 inventoried | the job (JCL) or the transaction flow is in the estate's survey |
| S1 wired | the generated Spring Batch job / CICS flow for it leaves no hole: every step maps to a port or a modelled utility, and its step flow (COND / IF, DD binding, GDGs) matches the IBM-manual answers (#8413, #8821) |
| S2 chain proven, hand-wired | its steps run as a chain on both sides, every hand-off carried (sequential, VSAM, GDG), every step's compared outputs and condition codes equal; the wiring is the job case's (tests/equivalence/jobs, #4268) |
| S3 chain proven from the JCL | S2 with the wiring read from the JCL by the generated job, not written in the case |
| S4 cycle proven | an operating cycle of the estate (its nightly batch and the online transactions over the same data) proven as one run |
Same claim boundary as L2+: the oracle is GnuCOBOL plus the stubs and models (IDCAMS, CICS, LE), Db2 for Linux, not z/OS.
Online flows belong on this axis too: a pseudo-conversational sequence across screens, a LINK chain, a transaction writing what a batch job reads.
Changes
- docs/language_status/definition_of_done.md: the S ladder and the promise. Default promise: programs at L3 (online) / L4 (critical) and every batch job in scope at S2. L5 stays on request.
- The progress slide / report (translation proving graph): an S bar under each training estate's L0-L4 / L5 row (the denominator: the estate's jobs; S2 from the proven job cases). Not-yet-measurable levels read "not measured", never 0.
- churn focus: L5 out (L5 speed: cut the per-case fixed cost of det-mutation runs, and close the one-JVM facade gap (Part of #7954) #8599 dropped from the focus), S2 in: CardDemo's nightly (Epic: prove CardDemo's nightly batch end to end (Graveyard Shift) #8878: Job cases carry VSAM datasets between steps: prove CardDemo POSTTRAN -> INTCALC as one chain #8879 now, IDCAMS REPRO / DELETE / DEFINE CLUSTER in a job case: oracle model + Java runtime (CardDemo TRANBKP, COMBTRAN) #8880 and GDG generations (+1) / (0) across a job case's steps and jobs (CardDemo nightly) #8883 in parallel), then CBSA and GenApp's batch jobs.
- L5 continues only for programs a customer marks critical, or as a sampled mutation score per estate (a follow-up to scope).
Siblings: #8878 (CardDemo nightly, Graveyard Shift 1-3), #4268 (job cases), #4890 (utility runtime), #4891 (JCL execution), #8821 (forged jobs vs IBM answers), #7954 / #7955 / #8599 (L5 work, deprioritised).