Skip to content

Blind 1 proof phase: Amendment 3 (owner exception to rule 2) and trial.py start on a frozen system #8119

Closed

Description

@squid-protocol

Part of #8073 / #3803. Owner, 2026-11-08: "get Blind 1 to L2". This is the deferred proof phase of the pre-registration (Amendment 1) on ibm/example-health-apis @ 9cfe321e2028. Its L1 blind result is closed: 0 / 29 at first contact, 25 / 29 whole (#8073).

Order matters: trial.py start refuses a development estate, so the trial must start before the estate is promoted (the follow-up issue).

Work:

🤖 Generated with Claude Code

Activity

  1. added
    priority: high
    scope:core
    on Nov 8, 2026
  2. squid-protocol commented on Nov 8, 2026

    @squid-protocol
    OwnerAuthor

    Owner, 2026-11-08: every program climbs in order, so the stragglers reach L1 first, then everything goes to L2.

    • Run `trial.py start` only after Blind trial #8073: EXEC CICS ASSIGN PRINSYSID and the scrubbed EXEC CICS keys (5 of 58 programs) #8076 merges (the 3 programs whose DTO property is a COMP-1 / COMP-2 floating type). They should enter the proof trial translated whole, not refused.
    • The 2-PR split is right: PR 1 brings the eligibility rules in line with pre-registration section 5, plus Amendment 3; `start` runs from a main commit that has them.
    • Before `start`, re-measure the estate (`cics_census.py survey --blind-root`). The expected L1 is 28 / 29: only the program with the copybook absent from the clone stays out, by the missing-source rule.

    🤖 Posted by Claude Code

  3. squid-protocol commented on Nov 8, 2026

    @squid-protocol
    OwnerAuthor

    Owner ruling, 2026-11-08: leave the program that COPYs LGCMAREA out. The member is absent from the clone at every path. It is GenApp's commarea copybook, but we will not assume another repo's member is the intended one. Declare it out of scope at trial.py start under the missing-source rule (pre-registration section 5), with that reason. The ceiling for this estate is 28 of 29.

    🤖 Posted by Claude Code

  4. squid-protocol commented on Nov 8, 2026

    @squid-protocol
    OwnerAuthor

    Churn run 8119-20261108T1846Z (host melek) ended without a PR. Blocked: trial start waits on #8076 (owner gate); no PR. #8076 queued, plan-overlap held.

  5. squid-protocol commented on Nov 8, 2026

    @squid-protocol
    OwnerAuthor

    #8130 merged: a partial slice of [c:77c30e8e] "docs/language_status/estate4_preregistration.md Amendment 3: the owner's exception to rule 2 (cases, and reading the code) for this one repository, from this date. State that the L1 result was c"; left: trial.py preview/start, ledger + trial page, post on #8073 left: blocked on #8076 (owner gate, start is irreversible) (promoter-bot)

  6. squid-protocol commented on Nov 8, 2026

    @squid-protocol
    OwnerAuthor

    Churn run 8119-20261108T1902Z (host melek) ended without a PR. no PR: amendment 3 already on main (#8130); [c:77c30e8e] done; trial start blocked on #8076

  7. squid-protocol commented on Nov 8, 2026

    @squid-protocol
    OwnerAuthor

    Churn run 8119-20261108T2055Z (host melek) ended without a PR. No PR: trial start correctly not run; gate = #8076 float DTO slice (25/29 -> 28/29). Next: survey --blind-root, then start from main with #8124+#8130.

  8. squid-protocol commented on Nov 9, 2026

    @squid-protocol
    OwnerAuthor

    Churn run 8119-20261108T2355Z (host melek) ended without a PR. Trial start gated: #8076 open, survey 25/29 whole; start waits on 28/29 (owner gate). No PR.

  9. squid-protocol commented on Nov 9, 2026

    @squid-protocol
    OwnerAuthor

    Claimed by promoter-bot host melek, lease renewed 2026-11-09T01:26Z. It lapses after 6 h without a renewal. To take it back, assign someone or remove the claim:melek label.

  10. squid-protocol commented on Nov 9, 2026

    @squid-protocol
    OwnerAuthor

    #8154 merged: a partial slice of [c:74936160] "Post the frozen-system line and the eligible list on #8073."; left: the frozen-system line and eligible list are below; posting them on #8073 is left to the orchestrator (promoter-bot)

  11. added a commit that references this issue on Nov 9, 2026
  12. squid-protocol commented on Nov 9, 2026

    @squid-protocol
    OwnerAuthor

    All four checklist items are merged (#8141, #8154, #8156): Amendment 3, trial start on the frozen system, ledger and page committed, and the frozen-system line and eligible list posted on #8073. The next step is promotion and the burn (#8120).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    claim:melekpriority: highscope:core

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions