Skip to content

CI coverage gap: EQUIVALENCE_E2E / CICS_CRUCIBLE_PATH-gated tests never run in any workflow #5954

Closed

Description

@squid-protocol

Found by a CI test-duplication audit, 2026-10-22 (while working on #5882). Coverage gap, not speed.

Problem: some end-to-end tests never run in any CI workflow, because no workflow sets the variable they need:

  • EQUIVALENCE_E2E is never set for tests/cobol_mainframe. E2E-gated tests there (e.g. test_rounding, test_td_queue_e2e_*, the E2E parts of test_equivalence_cics) are skipped in Smoke, Mainframe Ground Truth and Full Suite Gate alike. Only cics-crucible's runner-tests sets it, and that job runs tests/cics_crucible only.
  • CICS_CRUCIBLE_PATH is never set, so tests/cics_crucible/test_det_port_bytes_4965.py is skipped everywhere, including runner-tests, which does have EQUIVALENCE_E2E=1 and a cics-crucible checkout.

Suggested fix:

  1. List every test gated on EQUIVALENCE_E2E / CICS_CRUCIBLE_PATH and what it needs (Docker GnuCOBOL, JDK + Maven, Db2, the crucible checkout).
  2. Run each in the one workflow that already provides that environment. For example, cics-crucible runner-tests could set CICS_CRUCIBLE_PATH to its checkout.
  3. Retire any that can no longer run.

Then add a guard test that fails if an env-gated test is set up by no workflow, as #5498's matrix test does for shards.

Why it matters: these tests count toward the suite but prove nothing in CI; a regression they cover would land green.

Activity

  1. added
    bug
    testing
    priority: high
    scope:infra
    on Oct 22, 2026
  2. squid-protocol commented on Oct 23, 2026

    @squid-protocol
    OwnerAuthor

    Waiting on an owner decision (asked privately, 2026-10-23). Nothing is needed from contributors; work resumes once it is answered.

  3. squid-protocol commented on Oct 23, 2026

    @squid-protocol
    OwnerAuthor

    The owner decided (2026-10-23); the bot applies it on its next tick.

  4. squid-protocol commented on Oct 24, 2026

    @squid-protocol
    OwnerAuthor

    Churn run 5954-20261024T0247Z (host melek) ended without a PR. Slice 2b already on main via #6238, no PR. Slice 3a (Docker+JDK+Maven EQUIVALENCE_E2E job) is CI-cost decision; not queued

  5. 24 remaining items

  6. squid-protocol commented on Oct 30, 2026

    @squid-protocol
    OwnerAuthor

    Churn run 5954-20261030T1309Z (host nyx) ended without a PR. Workflow slice already on main (equivalence-e2e.yml, cics-crucible runner-tests, #6661/#6669/#7079, deselects removed). #5954 stays open for step 3 (retiring tests that can no longer run); earlier 'owner CI-cost decision' comments are stale.

  7. squid-protocol commented on Oct 31, 2026

    @squid-protocol
    OwnerAuthor

    Claimed by promoter-bot host nyx, lease renewed 2026-10-31T13:24Z. It lapses after 6 h without a renewal. To take it back, assign someone or remove the claim:nyx label.

  8. squid-protocol commented on Oct 31, 2026

    @squid-protocol
    OwnerAuthor

    Acceptance met: equivalence-e2e.yml runs the tests/cobol_mainframe EQUIVALENCE_E2E tests, cics-crucible runner-tests sets both variables for test_det_port_bytes_4965, and #7298 pins both jointly in the guard test (fails if an env-gated test runs in no workflow). No gated test is left that cannot run, so nothing to retire. Closing.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    bugci-cdclaim:nyxgithub-actionslegacy-modernizationpriority: highscope:infratesting

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions