Skip to content

CI: duplicate test runs on main and nightly (Smoke vs Ground Truth vs Full Suite Gate) #5953

Closed

Description

@squid-protocol

Part of #5882 (CI speed). Found by a CI test-duplication audit, 2026-10-22. Which jobs run where is the CI job-rework owner's area: this records the measurement, the decision is theirs / the owner's.

Duplicate runs on main and nightly (seconds from .test_durations, Linux):

  1. Main push: Smoke re-runs tests/cobol_mainframe (no PYTEST_ADDOPTS=--ignore off PRs) while Mainframe Ground Truth runs the same directory with the corpora. When tested-tree does not skip, ~2,033-2,497 test-s are run twice. Ground truth's run is the superset: corpus-backed tests plus test_evidence_components.
  2. Nightly: Smoke (04:23) ~= Full Suite Gate's ubuntu/3.12 leg (04:43), ~4,000 test-s. Same OS, Python and tests/. The gate leg adds test_evidence_components (212 s) and EVIDENCE_REPORT_ADVISORY=1. Smoke's unique nightly role is bookkeeping: --store-durations for pytest-split and the suite time budget.
  3. tests/cobol_mainframe runs ~8 times a night: smoke, ground-truth, and 6 Full Suite Gate combos. 3 of those are Linux/3.12.
  4. post-merge.yml dispatches cics-crucible and full-suite-gate on main (each at most every 3 h), which repeats item 3 and the tests/cics_crucible overlap.

Options:

  • (1) Smoke ignores tests/cobol_mainframe on main pushes too, when ground truth runs on the same commit.
  • (2) The nightly Smoke keeps only the durations/budget role (e.g. the gate's ubuntu-3.12 leg stores the durations), or the gate drops that leg.

Expected: (1) up to ~0.7 runner-h per non-skipped main push; (2) ~1.1 runner-h/night.

Activity

  1. added
    ci-cd
    priority: low
    scope:infra
    on Oct 22, 2026
  2. squid-protocol commented on Oct 24, 2026

    @squid-protocol
    OwnerAuthor

    Claimed by promoter-bot host melek, lease renewed 2026-10-25T00:11Z. It lapses after 6 h without a renewal. To take it back, assign someone or remove the claim:melek label.

  3. squid-protocol commented on Oct 25, 2026

    @squid-protocol
    OwnerAuthor

    Items 1, 2 (#6495) and 4 (#6568) are done. Item 3 (non-Linux/3.12 gate legs run cobol_mainframe, unique coverage) and the cics-crucible post-merge overlap are owner calls on CI cost vs coverage, not slices; reopen if the owner wants them cut.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ci-cdclaim:melekperformancepriority: lowscope:infra

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions