Context (2026-10-14 CI audit): PR CI is now limited by queueing, not runtime. The account has a pool of about 20 concurrent jobs. On #5115 (a det change), 61 jobs and 266 job-minutes took 61 min to green; det shards ran 3-6 min but waited 20-42 min for a runner, and setup is only about 50 s per job. Every job that leaves the PR path frees a slot for PR work. Already done or rejected: #4518, #4825, #4847, #4935, #4961, #5024, #5104. Line refs are origin/main as of 2026-10-14.

Owner decision needed: merge-main reruns. Since 2026-10-11, 52 of 155 PRs got at least one "Merge branch 'main'" commit (65 in total). Each one restarts the PR's full CI (about 60 jobs on a det PR). Sources:

  • 55 were committed locally by agents: worker guidance in .claude/agents/gitgalaxy-pr-worker.md:69 says "Bringing a branch up to date: git merge origin/main", with no condition on when.
  • 10 went through GitHub's update-branch, of which only 2 carry the shepherd's shepherd-update marker (shepherd_gh.py:210-211: behind + green + labelled -> update-branch).

Merging isn't gated on being current: the ruleset main: required checks (#4825) has strict_required_status_checks_policy: false. Classic protection still has strict: true with no contexts, which makes GitHub report behind and so drives the shepherd's update-branch.

Options:

  • A. Workers merge main only when the PR is CONFLICTING/dirty, a required check fails because of main, or golden masters/generated files must be re-blessed after a sibling merge. Never "just to be current". Drop the shepherd's behind->update-branch, and clear the leftover classic strict: true. Risk: a semantic conflict between two individually green PRs lands on main; Main Watch (ci-red-main) catches it after the fact.
  • B. Keep "test against current main" as a guarantee, but batch it: a merge queue tests several PRs together. That needs the repo in an org; see the runner/plan discussion.
  • C. Status quo.

Acceptance: owner picks A, B or C. For A: update the worker agent doc and the shepherd, plus docs/ci.md, and measure merge-main commits per PR over the following 3 days.

Activity

  1. added
    github-actions
    ci-cd
    on Oct 14, 2026
  2. squid-protocol commented on Oct 14, 2026

    @squid-protocol
    OwnerAuthor

    More data for this decision (39.5 h window, 59 merged PRs): PR runs on superseded SHAs of merged PRs cost 8,187 job-min = 27% of all CI minutes, about 139 slot-min per merged PR. Only 104 of 2,093 such jobs were cancelled, because PR concurrency already cancels in progress; these runs finished before the next push. So every extra push to a ready PR (merge-main or fix round) costs about one full CI run, and option A goes straight at that.

  3. squid-protocol commented on Oct 14, 2026

    @squid-protocol
    OwnerAuthor

    Owner decision (2026-10-14): option A. Workers merge main only when the PR is CONFLICTING/dirty, a required check fails because of main, or golden masters/generated files must be re-blessed after a sibling merge; never just to be current. Drop the shepherd's behind->update-branch (shepherd_gh.py:210-211) and update .claude/agents/gitgalaxy-pr-worker.md:69, docs/ci.md and any skill that says to merge main routinely. Main Watch (ci-red-main) is the backstop. Measure merge-main commits per PR for 3 days after merge. The leftover classic branch-protection strict: true is cleared by the owner by hand.

  4. added 2 commits that reference this issue on Oct 14, 2026
    8b52c81
    285e9d6
  5. added
    scope:infra
    on Oct 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ci-cdgithub-actionsperformancescope:infra

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions