You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
CI minutes: Main Watch starts a run on every green completion on main (workflow_run can't filter on conclusion) #4959
Main Watch success events with no ci-red-main issue open
open (this issue)
other 14 Main Watch entries (push-time watches)
all run on main and are acted on; dropping any loses post-merge-red signal (owner call)
Measured: Main Watch ran 239 times on 2026-10-11 (338 of 402 runs since 10-10 succeeded; most were successes with no red issue to close). workflow_run cannot filter on conclusion, so every green completion on main starts a run (~0.3 min each).
Options: (a) keep as is (~70 runner-min/day, immediate open+close); (b) trigger Main Watch only via a failure step inside the watched workflows, with the hourly reconcile closing issues on recovery (slower close, edits ~9 workflows); (c) move all detection into the hourly reconcile (slowest signal).
Needs an owner decision: whether faster red-issue closing is worth ~70 runner-min/day.
Owner decision (2026-10-13): option (a), keep Main Watch as is. The repo is public, so the ~70 runner-min/day are free, and churn and the shepherd act on ci-red-main issues, so fast open/close is worth more than the trim. Revisit only if PR jobs start queuing behind Main Watch runs (20 concurrent-job limit).
Activity
squid-protocol commentedon Oct 13, 2026
Owner decision (2026-10-13): option (a), keep Main Watch as is. The repo is public, so the ~70 runner-min/day are free, and churn and the shepherd act on
ci-red-mainissues, so fast open/close is worth more than the trim. Revisit only if PR jobs start queuing behind Main Watch runs (20 concurrent-job limit).🤖 Generated with Claude Code