OpenMar 26, 2026
Due by May 20, 2026
•Last updated Core priorities identified by the TSC for the Spack 1.2.0 release. This is not an exhaustive list of work intended to be completed for the 1.2.0 release, but is intended to represent our highest commitments for that release.
Other goals for the same release can be found in https://github.com/spack/spack/milestone/22.
20% complete
List view
0 issues of 12 selected
- Status: Open.#48624 In spack/spack;
- Status: Open (in progress).spack/spacknumber 47615#47615 In spack/spack;
- Status: Open.#49939 In spack/spack;
- Status: Open.#1385 In spack/spack;
- Status: Open.#51515 In spack/spack;
- Status: Open.#51843 In spack/spack;
- Status: Draft (not ready).spack/spacknumber 47755#47755 In spack/spack;
- Status: Open (in progress).spack/spacknumber 50207#50207 In spack/spack;
- Status: Open (in progress).spack/spacknumber 51596#51596 In spack/spack;
- Status: Open.#47063 In spack/spack;
- Status: Open.#51741 In spack/spack;
- Status: Open.#51880 In spack/spack;