Skip to content

Conversation

@benmccann
Copy link
Contributor

Rollup Plugin Name: N/A

This PR contains:

  • bugfix
  • feature
  • refactor
  • documentation
  • other

Are tests included?

  • yes (bugfixes and features will not be merged without tests)
  • no

Breaking Changes?

  • yes (breaking changes will not be merged unless absolutely necessary)
  • no

If yes, then include "BREAKING CHANGES:" in the first commit message body, followed by a description of what is breaking.

List any relevant issue numbers:

Description

Upgrade from pnpm 8 to pnpm 9

@shellscape
Copy link
Collaborator

I'm good with this, thanks for opening it. There are a host of PRs that I'd like to try and get merged this week, since I finally have the time. Once those are in we'll push this through.

@shellscape shellscape changed the title chore: upgrade to pnpm 9 chore(repo): upgrade to pnpm 9 Sep 23, 2024
@shellscape
Copy link
Collaborator

@benmccann thanks for pushing this, it def got lost in time.

@shellscape shellscape merged commit 05af988 into rollup:master Sep 23, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants