fix(router): dev PPR capture backoff cap + cloudflare-basic ppr warmup (#652 item 3) - #659

Merged
ivogt merged 1 commit into
mainfrom
fix/ppr-capture-backoff-dev
Jul 4, 2026
Merged

ivogt merged 1 commit into
mainfrom
fix/ppr-capture-backoff-dev

Conversation

@ivogt

@ivogt ivogt commented Jul 4, 2026 •

Copy link
Copy Markdown
Collaborator

Problem

On a cold CI runner the [dev] ppr-shell.test.ts suite hard-fails: warmToHit polls x-rango-shell for 20s and never sees HIT, on the test attempt AND both Playwright retries (the backoff state lives in the dev-server process and persists across retries). Four independent CI occurrences: the main run for SHA 2586ea9c (job cloudflare-basic-e2e), the PR #657 runs, and — after the first iteration of this PR — #659's own first CI run (physics hole failed 3x at ~20s each).

Three compounding causes, fixed together here, plus an unrelated CI-blocking unit flake:

(a) Backoff arithmetic. The refused-capture backoff window is exponential in the consecutive-failure count — min(BASE * 2^(failures-1), ceiling) — and the ceiling was a flat 60s in every mode. On a cold runner each cold re-probe climbs the count (1s → 2s → 4s → 8s → 16s → …); once the window exceeds ~16s it outlasts the 20s poll — every request inside it hits isCaptureBackedOff and is skipped → eternal MISS, even though the modules are warm by then.

(b) Cold module graph outruns the capture budget. #659's first CI run proved the dev cap alone is necessary but not sufficient: one probe cycle ≈ 5s attempt (SHELL_CAPTURE_MAX_WAIT_MS) + 5s in-place retry + 2s capped backoff ≈ 12s, so the 20s window fits only ~2 cycles — and today's cold runners need more, because the dev module graph is compiled on demand during the capture render, repeatedly blowing the 5s budget.

(c) CI budget — the 600s owner. tests/cloudflare-basic/playwright.config.ts set globalTimeout: 10 * 60 * 1000 on CI. The merged PPR shell stack grew the sequential dev → production → hmr playwright run past 10 minutes, so healthy runs brushed the cap and any flake retry tipped it over — Playwright then killed the run mid-flight with its own "Timed out waiting 600s for the test suite to run", failing whichever test happened to be executing. This mechanism explains the remaining CI deaths that were NOT eternal-MISS shaped: the 0ms hmr-warmup "failure" skip-cascade, the mid-hmr kill at 10:31:06 while hmr tests were passing, and contributed to the main 2586ea9c run (where the warmToHit retries' wall time cascaded into the cap).

(d) shell-snapshot.test.ts 1ms flake. The same #659 run also failed SeededShellStore > serves snapshot values AS FRESH — expiresAt ...881 vs ...880. The test builds the seeded store and the expected value from two separate snapshotOf() calls, and segData embeds Date.now() + 60_000; a millisecond tick between the calls fails the deep-equal.

This is item 3 of #652. Items 1–2 (barrier narrowing, drain unification) remain open — #652 must stay open after this PR merges (referenced here without closing keywords, deliberately).

Fix (four coordinated changes)

1. Dev backoff cap (runtime safety net)

The backoff ceiling is now mode-dependent: 60s in production (a genuinely ineligible route — no loading(), a cookie-reading handler — should be re-probed rarely), ~2s in dev, where the dominant no-shell cause is a cold graph that warms on the very attempt that failed.

// markCaptureBackoff — before: flat 60s ceiling in every mode
const window = Math.min(REFUSED_CAPTURE_BASE_MS * 2 ** (failures - 1), REFUSED_CAPTURE_MAX_MS);

// after: ceiling depends on mode
const window = Math.min(REFUSED_CAPTURE_BASE_MS * 2 ** (failures - 1), refusedCaptureCeilingMs());

function refusedCaptureCeilingMs(): number {
  return isDevMode() ? REFUSED_CAPTURE_DEV_MAX_MS /* 2_000 */ : REFUSED_CAPTURE_MAX_MS /* 60_000 */;
}
function isDevMode(): boolean {
  return process.env.NODE_ENV !== "production"; // build-folded to a literal; no runtime probe
}

The dev signal matches the rest of the RSC runtime (handler.ts, server-action.ts, progressive-enhancement.ts) — no new env probe.

2. cloudflare-basic PPR dev warmup (the sufficient fix, test-side)

Warm the module graph BEFORE the ppr suite runs, so the first real capture attempt runs against a hot graph and completes inside its 5s budget on attempt 1. Mechanism: extend the suite's existing dev-warmup setup project (tests/cloudflare-basic/e2e/dev-warmup.setup.ts), which the dev project already depends on — the same pattern packages/rangojs-router/playwright.config.ts uses. No config change needed; the new setup test is picked up by the project's testMatch.

The warmup:

  • GETs every ppr fixture route from src/urls.tsx (/ppr-shell, /ppr-shell/stream, /ppr-shell/no-hole, /ppr-drift, /ppr-blog, /ppr-blog/getting-started-with-rsc) with Accept: text/html, compiling each route's page/loader modules AND the capture-only path (loader mask, captureShellHTML, fizz prerender) via the background capture each GET schedules;
  • uses an isolated ?probe=warmup query on every GET — the shell key includes the query, so no test-visible shell entry is ever pre-stored and every test's own MISS→HIT sequence is untouched;
  • then polls each capturable fixture (/ppr-shell, /ppr-shell/stream, /ppr-drift, /ppr-blog) to x-rango-shell: HIT, proving the full capture pipeline is hot — not merely requested. /ppr-shell/no-hole is excluded (it can never HIT; the suite pins that negative);
  • is serialized after the base dep-optimizer warmup (setup.describe.configure({ mode: "serial" })) so local 2-worker runs cannot race the optimizer churn.

Cap + warmup together: the warmup makes first attempts succeed; the cap remains the safety net for anything cold the warmup missed. warmToHit windows and all other runtime constants are untouched. The production project needs nothing — build output is always warm (CI consistently passes prod).

(No nonce ppr fixture exists in cloudflare-basic's urls.tsx; the route list above is the complete ppr-declared set.)

3. CI budget: 14m playwright globalTimeout, 20m job cap

  • tests/cloudflare-basic/playwright.config.ts — globalTimeout raised from 10m to 14m on CI, with a sizing comment: the PPR stack grew the suite past the old 10m (and the ppr warmup adds dev-time work); 14m playwright budget + ~3-4m of job setup (install, router build, browser deps) fits the workflow job cap.
  • .github/workflows/e2e.yml cloudflare-basic-e2e — timeout-minutes raised from 15 to 20 ("20 (was 15): ..." comment mirroring the rangojs-router job's "30 (was 20)" style), so the workflow cap comfortably contains setup + the new playwright budget.

The other two configs with the same 600000 pattern were checked against recent CI runs and deliberately left unchanged — their jobs shard/split, so no single playwright run is near the cap:

Suite Structure Recent CI job time (incl. ~2-3m setup) Near 600s?
vite-rsc-demo (playwright.config.ts:14) dev sharded 2x + production max 5m39s no
rangojs-router (playwright.config.ts:41) dev sharded 5x, production 2x, hmr/host split max 6m52s no
cloudflare-basic ONE sequential dev → production → hmr run brushing/exceeding 10m was the owner

(Measured on the main 2586ea9c run 28694625718 and this PR's run 28703125311.)

4. Deterministic shell-snapshot.test.ts

Pin the clock with vi.useFakeTimers() + setSystemTime (the src/cache/__tests__/shell-cache.test.ts pattern) in the racy test, so both snapshotOf() calls see the same Date.now(). The whole file was audited for siblings: no other assertion deep-equals values derived from two Date.now() instants (the other snapshotOf/segData uses assert partial fields or compare a single instance; settleWrites is bounded intentionally uses real timers with a generous bound).

Consumer-observable end-to-end

A consumer declaring PPR on an eligible route:

// route: /ppr-shell — a layout shell + a route-level loading() boundary (the hole)
export const ppr = { key: (url) => `${url.host}${url.pathname}:shell`, ttl: 300 };

On a cold dev worker the first document GET is x-rango-shell: MISS and schedules a background capture. Before this change, on a slow machine the exponential backoff could freeze the route on MISS for up to 60s. After, a cold-but-eligible route re-probes every ~2s in dev and flips to HIT as soon as the modules warm. No API change; only the dev-mode recovery cadence changes. The warmup is internal to this repo's e2e suite.

Semantics

Case Before After Changed?
Dev, failure #1 1s window 1s window no
Dev, failure #2 2s window 2s window no
Dev, failure #3 4s window 2s window (capped) yes
Dev, failure #6+ up to 60s window 2s window (capped) yes
Prod, failure #N min(1000·2^(N-1), 60000) min(1000·2^(N-1), 60000) no
Stored capture clears backoff (count resets) clears backoff (count resets) no
Redirect outcome backoff untouched backoff untouched no
CI: cloudflare-basic dev ppr tests first capture attempts run against a cold module graph dev-warmup pre-compiles the graph and drives each capturable fixture to HIT before the suite yes (test infra)
Retry-in-place / in-flight guard / warm-window lengths — unchanged no

Code change

  • packages/rangojs-router/src/rsc/shell-capture.ts — add REFUSED_CAPTURE_DEV_MAX_MS (2s), isDevMode(), refusedCaptureCeilingMs(); markCaptureBackoff clamps to the mode ceiling. Backoff internals exported for unit tests (same convention as the existing runShellCapture test export). This is the single layer owning the backoff lifecycle, so the cap lives here.
  • tests/cloudflare-basic/e2e/dev-warmup.setup.ts — the ppr warmup setup test (see above). Chosen over a new Playwright project or global-setup because the dev-warmup project → dev dependency already exists and its testMatch picks the file up with zero config churn.
  • packages/rangojs-router/src/cache/__tests__/shell-snapshot.test.ts — fake timers in the racy test.
  • packages/rangojs-router/src/rsc/__tests__/shell-capture.test.ts — new refused-capture backoff policy describe (see test plan).
  • packages/rangojs-router/docs/design/ppr-shell-resume.md — "Refused-capture backoff" section documents the mode-dependent ceiling and the cold-CI failure.

Test plan

  • Unit — shell-capture.test.ts (34 tests). New pins:
    • dev cap honored: the dev window never exceeds REFUSED_CAPTURE_DEV_MAX_MS however high the failure count climbs.
    • prod growth intact: window exceeds the dev cap, climbs to and clamps at 60s.
    • stored clears backoff: a stored capture resets the failure count.
    • simulated cold start (regression pin): walks the exact warmToHit cadence — capture fails at t0, one request per second for 20s, every probe also cold and re-marking. Dev cap: ≥8 probes total, ≥1 in the last 4s. The sibling prod-mode test asserts the same sequence freezes the tail to zero probes — the eternal MISS being fixed — making the dev pin non-vacuous.
  • Unit — shell-snapshot.test.ts (14 tests): the previously-flaky deep-equal now runs under a pinned clock; contract unchanged (seeded values served AS FRESH, shouldRevalidate: false, real store untouched).
  • E2e (dev + production):
    • cloudflare-basic: --project=dev with the warmup dependency enforced (dev-warmup → dev): 16 passed, twice consecutively; --project=production --no-deps: 14 passed. (An intermediate local repro that ran warmup CONCURRENTLY with the dev tests via --no-deps flaked ppr-blog — an artifact of stripping the project dependency, impossible on CI where dev-warmup always completes first.)
    • test-app shell-cache + shell-cache-action + shell-secure — 42 passed (dev+prod).
    • mini shell suites — green via test:unit:all.
  • pnpm run typecheck
  • pnpm run test:unit:all (297 router unit files + all consumer app suites + RSC suites)
  • pnpm run lint
  • pnpm run format
  • pnpm check:e2e-bucketing
  • Config sanity after the CI-budget change: playwright test --list --project=production loads the cloudflare-basic config and resolves the full project/dependency chain.

Notes

@pkg-pr-new

pkg-pr-new Bot commented Jul 4, 2026 •

Copy link
Copy Markdown

Open in StackBlitz

npm i https://pkg.pr.new/@rangojs/router@659

commit: 8647800

@ivogt
ivogt force-pushed the fix/ppr-capture-backoff-dev branch from be08e6f to ecb613e Compare July 4, 2026 10:19
ivogt added a commit that referenced this pull request Jul 4, 2026
…p, fix snapshot-test flake (#652 item 3)

Three coordinated changes unblocking cloudflare-basic-e2e on cold CI runners
(failures on the main run for 2586ea9, the PR #657 runs, and PR #659's own
first CI run):

1. Dev backoff cap (runtime). The refused-capture backoff window is exponential
per consecutive failure, `min(BASE * 2^(failures-1), ceiling)`; the ceiling was a
flat 60s in every mode. On a cold runner each cold re-probe climbs the count, and
once the window exceeds ~16s it outlasts warmToHit's 20s poll: every request is
skipped as backed-off, an eternal MISS. The ceiling is now mode-dependent: 60s in
production (a genuinely ineligible route should be re-probed rarely), ~2s in dev,
where the dominant no-shell cause is a cold module graph that warms on the very
attempt that failed. Dev signal is `process.env.NODE_ENV !== "production"`,
matching handler.ts / server-action.ts / progressive-enhancement.ts.

2. PPR dev warmup (test-side, the sufficient fix). PR #659's first CI run showed
the cap alone is not sufficient: one probe cycle is ~12s (5s attempt + 5s in-place
retry + 2s capped backoff), so the 20s window fits ~2 cycles and today's cold
runners need more because the dev module graph is compiled ON DEMAND during the
capture render, repeatedly blowing the 5s budget (physics hole failed 3x at ~20s).
Extend tests/cloudflare-basic's existing dev-warmup setup project (which the dev
project already depends on) with a ppr warmup: GET every ppr fixture route under
an isolated `?probe=warmup` shell key (module-graph warm only, no test-visible
entry pre-stored), then poll each capturable fixture to x-rango-shell HIT, proving
the full capture pipeline (Flight render, fizz prerender+abort, putShell) is hot
before any real test's warm window starts. Cap + warmup together: the warmup makes
first attempts succeed; the cap remains the safety net for anything cold the
warmup missed. warmToHit windows and runtime constants are otherwise untouched.

3. shell-snapshot.test.ts 1ms flake (also blocking CI). "serves snapshot values
AS FRESH" builds the seeded store and the expected value from two separate
snapshotOf() calls, and segData embeds `Date.now() + 60_000` as expiresAt — a
millisecond tick between the calls fails the deep-equal (seen on the #659 run).
Pin the clock with fake timers (the shell-cache.test.ts pattern). The rest of the
file was audited: no other assertion deep-equals across two Date.now() instants.

Production backoff ceiling/growth, retry-in-place, the in-flight set, and the e2e
warm-window lengths are unchanged. #652 items 1-2 (barrier narrowing, drain
unification) remain open.
@ivogt ivogt changed the title fix(router): cap PPR capture backoff at ~2s in dev so cold CI recovers (#652 item 3) fix(router): dev PPR capture backoff cap + cloudflare-basic ppr warmup (#652 item 3) Jul 4, 2026
…dget, snapshot-test flake (#652 item 3)

Four coordinated changes unblocking cloudflare-basic-e2e on cold CI runners
(failures on the main run for 2586ea9, the PR #657 runs, and PR #659's own
first CI run):

1. Dev backoff cap (runtime). The refused-capture backoff window is exponential
per consecutive failure, `min(BASE * 2^(failures-1), ceiling)`; the ceiling was a
flat 60s in every mode. On a cold runner each cold re-probe climbs the count, and
once the window exceeds ~16s it outlasts warmToHit's 20s poll: every request is
skipped as backed-off, an eternal MISS. The ceiling is now mode-dependent: 60s in
production (a genuinely ineligible route should be re-probed rarely), ~2s in dev,
where the dominant no-shell cause is a cold module graph that warms on the very
attempt that failed. Dev signal is `process.env.NODE_ENV !== "production"`,
matching handler.ts / server-action.ts / progressive-enhancement.ts.

2. PPR dev warmup (test-side, the sufficient fix). PR #659's first CI run showed
the cap alone is not sufficient: one probe cycle is ~12s (5s attempt + 5s in-place
retry + 2s capped backoff), so the 20s window fits ~2 cycles and today's cold
runners need more because the dev module graph is compiled ON DEMAND during the
capture render, repeatedly blowing the 5s budget (physics hole failed 3x at ~20s).
Extend tests/cloudflare-basic's existing dev-warmup setup project (which the dev
project already depends on) with a ppr warmup: GET every ppr fixture route under
an isolated `?probe=warmup` shell key (module-graph warm only, no test-visible
entry pre-stored), then poll each capturable fixture to x-rango-shell HIT, proving
the full capture pipeline (Flight render, fizz prerender+abort, putShell) is hot
before any real test's warm window starts. Cap + warmup together: the warmup makes
first attempts succeed; the cap remains the safety net for anything cold the
warmup missed. warmToHit windows and runtime constants are otherwise untouched.

3. CI budget (the 600s owner). cloudflare-basic's playwright globalTimeout was
`10 * 60 * 1000` on CI; the merged PPR stack grew the sequential dev ->
production -> hmr run past 10m, so healthy runs brushed the cap and any flake
retry tipped it over — Playwright killed the run mid-flight ("Timed out waiting
600s for the test suite to run"), failing whichever test was executing (the 0ms
hmr-warmup skip-cascade, the mid-hmr kill at 10:31:06 while hmr tests were
passing). Raised to 14m, and the cloudflare-basic-e2e job's timeout-minutes from
15 to 20 so the workflow cap contains ~3-4m setup + the 14m playwright budget.
vite-rsc-demo and rangojs-router keep their 600s globalTimeout: their jobs
shard/split, and recent CI runs show per-job playwright time of ~3-5m — nowhere
near the cap.

4. shell-snapshot.test.ts 1ms flake (also blocking CI). "serves snapshot values
AS FRESH" builds the seeded store and the expected value from two separate
snapshotOf() calls, and segData embeds `Date.now() + 60_000` as expiresAt — a
millisecond tick between the calls fails the deep-equal (seen on the #659 run).
Pin the clock with fake timers (the shell-cache.test.ts pattern). The rest of the
file was audited: no other assertion deep-equals across two Date.now() instants.

Production backoff ceiling/growth, retry-in-place, the in-flight set, and the e2e
warm-window lengths are unchanged. #652 items 1-2 (barrier narrowing, drain
unification) remain open.
@ivogt
ivogt force-pushed the fix/ppr-capture-backoff-dev branch from ecb613e to 8647800 Compare July 4, 2026 10:37
@ivogt
ivogt merged commit 26b6194 into main Jul 4, 2026
30 checks passed
@ivogt
ivogt deleted the fix/ppr-capture-backoff-dev branch July 4, 2026 10:50
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant