Split from #3758 by the backlog-burndown away run (2026-11-02, round 3). The maintainer's answers recorded on #3758 settle what the end state is. They do not settle how the change is triggered or scheduled, so that part is asked here.
Already settled on #3758, not asked again:
- Copilot's account-level automatic review stays on for now, because agents on the current workflow depend on it.
- One scheduled, coordinated cutover turns off automatic review for Copilot, CodeRabbit and Qodo together. Consistency across the three is required, and cost is not a reason to treat them differently.
- After the cutover, explicit bot-review requests are the required behaviour, gated the same way across the fleet and across running agents.
Question
What triggers the cutover and sets its schedule? And what in-repo switch and gate make explicit requests the required behaviour from that moment, while agents still on the current workflow keep working until then?
Options, recommended first
- (Recommended) Prepare behind one hub-hosted switch, release the preparation, then flip everything in one maintainer-chosen window.
- Preparation, behaviour-neutral.
scripts/pr_review.pygains an explicit request for CodeRabbit and Qodo beside Copilot's existing--request. One switch the hub hosts says whether automatic review is still on, for example a field inscripts/reviewers/*.jsonorspec/. It defaults to today's behaviour, so nothing changes for an agent until it flips. Thedrive-prandpr-review-conducttext then names both states, keyed on the switch. Themergegate refuses a head with no explicit request for each configured reviewer only while the switch says automatic review is off. - Cutover. The maintainer names a window in which no session is mid-drive on the old workflow. In that window one hub pull request flips the switch and releases. The maintainer turns off Copilot's account-level automatic review, and each repository carrying a
.coderabbit.yamlsetsreviews.auto_review.enabled: false. Qodo's automatic review is turned off in the same window. - Why recommended. Agents run
scripts/pr_review.pyfrom a hub checkout fetched before use rather than from a pinned copy, so the switch reaches every agent at its next fetch. That is the consistency the maintainer asked for. The preparation can land now without breaking any agent, and the irreversible settings changes stay the maintainer's and happen together. - Effect on the parked work. Stop pr_review.py Requesting Copilot on Feature Pull Requests into Develop #3758 stays held. The preparation can be dispatched as its own group once this is answered. The settings changes and the switch flip stay with the maintainer.
- Preparation, behaviour-neutral.
- Fix a calendar date now and flip everything on it, with no switch. The preparation lands already gated on the date, and the settings change that day. This is simpler, since nothing is flipped by hand in the repository. But any session mid-drive on that date breaks exactly as the maintainer described for turning Copilot off now. A slipped date also leaves the code and the settings out of step.
- Cut each repository over at its next resync. No fleet-wide window is needed. But repositories would run the two workflows side by side for weeks, against the stated requirement that the behaviour is consistent across the fleet. So this is listed only to record why it is not recommended.
Evidence
- Stop pr_review.py Requesting Copilot on Feature Pull Requests into Develop #3758, the comments recorded 2026-11-02 at 18:10 and 18:12: the maintainer's answers quoted there.
scripts/pr_review.pyrequest_copilot_review: the only explicit reviewer request the script sends today. CodeRabbit and Qodo have reader configuration underscripts/reviewers/and no request path..coderabbit.yamlreviews.auto_review.enabled: true, withbase_branches: ["^develop$"]. The file is not inspec/files.json, so each repository holds its own.- The
mainruleset carries acopilot_code_reviewrule, and thedevelopruleset does not, per Stop pr_review.py Requesting Copilot on Feature Pull Requests into Develop #3758.
Blocks
#3758, and any preparation group dispatched for it.
Metadata
Metadata
Assignees
Labels
No labels
Activity
Fix Adjacent Docs and Review Tails in the Open Pull Request Instead o…
ptr727 commentedon Nov 3, 2026
Answered, with the answer recorded on #3758, which holds the work.