You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
backlog-burndown: the round report contract, the round-budget override, and step 8's preparation under the freeze #1277
Three defects in backlog-burndown about what a round does at its boundaries.
The report contract is stated in three sections and the one that owns it omits two of them. "Ending the Run" enumerates the report: "what merged to develop, what the promotion pull request carries, what was newly filed, what is stopped and on which question, and what the next round would pick." "Ranking" separately mandates "Write the ranking, and the reason for the top of it, into the report this skill makes at each round boundary, per 'Ending the Run'", and "Choosing the Worker's Model Tier" mandates "State the chosen tier and its reason in the round's report". An agent following the cross-reference produces a report containing neither.
The round-budget stop is an undeclared override of pr-review-conduct. "The Promotion Boundary" step 2 sets "a review-round budget set before the first one ... so when the budget is reached, stop and put the state to the maintainer rather than continuing", and pr-review-conduct says of exactly that loop: "Never exit the loop early. A round count is not a stopping condition, and neither is patience running out." This skill labels its one drive-pr override explicitly and does not label this one, so it reads as two rules disagreeing with the weaker one here.
"The Round" step 8 prepares under the freeze and duplicates steps 1 to 3. Step 3 requires each group's file set verified "before dispatching anything". Step 8 verifies during the freeze and dispatches after an unbounded maintainer wait, during which step 4 of "The Promotion Boundary" explicitly permits a promotion fix to land on develop. Nothing requires re-verifying at the moment of dispatch, and that staleness is the same reason step 6 gives for not holding a briefed worker across the wait. Step 8's "re-rank from scratch" also duplicates the next round's steps 1 to 3, and the unit never says which of the two the round acts on.
Raised by the local-strict-review carried-content passes on the pull request that added this skill, and deferred there under that skill's own review-round budget.
Closed under the maintainer's decision (ptr727, 2026-10-23) on #3391, item 3: the prose and documentation backlog frozen by #1311 in September is closed rather than worked one issue at a time, keeping open only the issues where a document states something the shipped code or workflow does not do. This issue was read as wording, structure, restatement, or a gap in guidance rather than a falsified claim. Reopen with the sentence and the behavior it misstates if that reading is wrong.
Activity
ptr727 commentedon Oct 23, 2026
Closed under the maintainer's decision (ptr727, 2026-10-23) on #3391, item 3: the prose and documentation backlog frozen by #1311 in September is closed rather than worked one issue at a time, keeping open only the issues where a document states something the shipped code or workflow does not do. This issue was read as wording, structure, restatement, or a gap in guidance rather than a falsified claim. Reopen with the sentence and the behavior it misstates if that reading is wrong.