Skip to content

backlog-burndown: Promotion Boundary step 5 dispatches a worker under the freeze step 6 forbids #1273

Closed

Description

@ptr727

In backlog-burndown "The Promotion Boundary", step 5 ends by dispatching a worker, and step 6 forbids exactly that.

Step 5: "The orchestrator retires that group's worktree ... and then dispatches a fresh worker on that same branch, briefed either to merge develop in to pick the fix up or to narrow the change to drop the file."

Step 6: "Nothing else pushes, and nothing else is dispatched. The promotion fix of step 4 is the one exception to both."

That fresh worker's one procedure is drive-pr, "whose second step pushes and opens a pull request", so it is both a second dispatch and a second pusher under the freeze. Step 5 says the opposite two sentences earlier, "waits untouched until the freeze lifts" and "Reconciling its content is the next round's worker's job", so the dispatch has no stated timing and cannot legally happen where the step puts it.

The fix is presumably to state that the retire happens when the freeze lifts and the dispatch is the next round's, rather than both being step 5's, but the ordering is a design call rather than a wording one.

Raised by a local-strict-review carried-content pass on the pull request that added this skill, and deferred there under that skill's own review-round budget.

Activity

  1. added
    skills
    decision
    on Sep 4, 2026
  2. ptr727 commented on Sep 18, 2026

    @ptr727
    OwnerAuthor

    Queue hygiene (ptr727, 2026-09-17): the decision label comes off, the issue stays open.

    #1323's recorded answer, shrinking backlog-burndown to the round loop, ranking, file claims and the promotion boundary, is what dispositions this defect, inside that one rewrite's body rather than as a change of its own. So no decision is parked here any more. The label is removed so the parked queue's count means what it says, and the issue stays open as a defect that rewrite has to answer for, rather than being closed on the strength of a decision whose text is not written yet.

  3. removed
    decision
    on Sep 18, 2026
  4. ptr727 commented on Oct 23, 2026

    @ptr727
    OwnerAuthor

    Closed under the maintainer's decision (ptr727, 2026-10-23) on #3391: the backlog keeps real bugs with a stated failure, features the maintainer wants, and open decisions. A finding the review loop filed on code or text a change did not touch, a refactor or consolidation chore, a tracker, a wording item, or a guard shape no session has produced is closed rather than worked. Reopen with the input and the wrong result if this issue states one.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    skills

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions