Skip to content

design: propose audio, virtual-loopback, and file-watch - #317

Merged
progrium merged 3 commits into
mainfrom
claude/project-thread-1qhto6
Nov 26, 2026
Merged

progrium merged 3 commits into
mainfrom
claude/project-thread-1qhto6

Conversation

@progrium

Copy link
Copy Markdown
Owner

Requested by Jeff · project thread

Moves three drafts to proposed, each with its GitHub issue, as zig build design -- propose <slug> does:

The issues were opened with the tool's title, Proposal label, and body (the Abstract and a link to the doc), and the frontmatter was then set as propose --issue N sets it: issue: N before slug, and status: proposed. One commit per proposal. STATUS.md is left for the workflow on main to regenerate.


Generated by Claude Code

@progrium progrium self-assigned this Nov 26, 2026
@progrium
progrium merged commit f1f4d6e into main Nov 26, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants