The UI tests on Travis are taking around 40 minutes nowadays. Travis kills jobs after 50 minutes. Sometimes if there are longer delays between SauceLabs and Travis the tests overrun the time limit and get killed by Travis.
Design an infrastructure for putting sub-sections of UI tests into logical suites.
Sort out Travis to run the suites as separate (shorter) jobs.
Document how to run a single suite or all suites on a development system
Yes, that is definitely an option. Then we can split into whatever jobs (by browser type like now and logical grouping of tests into suites...) that suit a balance of:
timely elapsed-time completion of CI for feedback to real people (i.e. do as much in parallel as "possible")
capacity of the underlying hardware (i.e. there will be some limit of parallel things that kills the hardware/memory/OS and some softer limit of parallel things where there is no effective elapsed-time gains because raw IO limits or... are reached)
and jobs are not going to get killed if they do take a bit longer than usual elapsed time.
@DeepDiver1975@PVince81 please have a look at PR #28528 - that splits into 2 suites and gets the "infrastructure" in place (actually there was not much needed - it was reasonably easy)
Any future move of these CI jobs to Drone or... will benefit from having the choice of doing multiple parts in parallel. And for now, this prevents the job running for 50 minutes and getting killed.
Activity
DeepDiver1975 commentedon Jul 27, 2017
@tboerger move to drone? Once we are done with the rest.
phil-davis commentedon Jul 27, 2017
Yes, that is definitely an option. Then we can split into whatever jobs (by browser type like now and logical grouping of tests into suites...) that suit a balance of:
and jobs are not going to get killed if they do take a bit longer than usual elapsed time.
phil-davis commentedon Jul 28, 2017
@DeepDiver1975 @PVince81 please have a look at PR #28528 - that splits into 2 suites and gets the "infrastructure" in place (actually there was not much needed - it was reasonably easy)
Any future move of these CI jobs to Drone or... will benefit from having the choice of doing multiple parts in parallel. And for now, this prevents the job running for 50 minutes and getting killed.
phil-davis commentedon Jul 29, 2017
Code merged to master in #28528
Backported to stable10 in #28531
individual-it commentedon Jul 31, 2017
code was merged to master and stable10. closing?
phil-davis commentedon Jul 31, 2017
Documented in owncloud-archive/documentation#3250
phil-davis commentedon Jul 31, 2017
Drone move is another future issue. Closing here.