Skip to content

OpenSpec: add-project-overview-remote-merge-status (opt-in exact-head GitHub pull-request evidence in project overview --remote) - #29

Draft
brettheap wants to merge 86 commits into
mainfrom
change/add-project-overview-remote-merge-status
Draft

brettheap wants to merge 86 commits into
mainfrom
change/add-project-overview-remote-merge-status

Conversation

@brettheap

@brettheap brettheap commented Oct 11, 2026 •

Copy link
Copy Markdown
Contributor

Lane: openRepoProject-5

DRAFT for Brett Heap's word. Refs #25 (governing issue, claimed by lane openRepoProject-5) and #6 (the maintenance design packet record).

Status at the final head, 5ba7984 (2026-10-23)

This change adds an opt-in project overview --remote. For a worktree whose branch local ancestry does not prove merged, such as one squash-merged on GitHub, it asks GitHub through gh, inside fixed bounds, whether a pull request with that exact head is merged or open, and prints the answer as evidence. The answer changes no classification, completeness, exit status or cleanup decision, and without --remote nothing changes. This is a draft for Brett Heap's word: nothing is ratified or merged.

Since this description was written (2026-10-11):

  • Wider reach. The change now also modifies "Overview bounds its work and reports what it omitted" and "Overview prints a versioned JSON envelope" in project-overview, and change 1's evidence model (how Git children are run, timed and stopped) in project-command, on PR OpenSpec: amend add-project-clean-all-safe so the push child reaches its remote #19's text. The first description said project-command was untouched. The two Git reads that find the remote are counted in the envelope's probes, not in a count of their own (C-9, C-11, C-12).
  • No closed state. GitHub's commit lookup never returns a pull request closed without merging, as checked live on one of this repository's, so such a head reads not-found (C-16).
  • Wording kept true. The merged line names the exact head and says uncommitted and ignored files are not part of it. The "may already be stale" sentence is true even when no request was sent (C-17, C-18, C-20).
  • A credential-bearing remote URL is inspected only in memory, to find owner/repository and to see that it holds a credential. No part of the credential is kept, printed, logged or sent, and Git's standard error for that read is discarded unread (C-30, C-31). From Git 2.37.0, under transfer.credentialsInUrl=die, Git refuses both reads of a merge-target remote whose URL holds a password, so its rows read remote-target-unread, and nothing leaks; at the 2.36 floor the setting is unknown and the rows read credential-bearing-remote (C-47, C-49).
  • Which URLs are GitHub's. The host is read as written, after the scheme and any user part, and is compared without folding case. So GitHub.com is not-github, and HTTPS://github.com/... and git://github.com/... are malformed-remote. A URL with no :// and no : before its first /, such as github.com/acme/widget, is a local path to Git. It is not-github, and no request is ever sent about it. The README's steps for not-github and malformed-remote now say which URL to write (C-47). An ssh URL's port is read as Git reads it, so ssh://[email protected]:acme/widget.git has the host github.com:acme and is not-github, never sent (C-49). An explicit port refuses at its own step, before the repository name is read, so ...:22/widget is never read as 22/widget (C-50). A repository name that begins with ., such as .github, gives no identity either, so it is refused as malformed-remote, and the README's step says so (C-75).
  • The remote phase's own limits (C-48, committed on lane openRepoProject-4's YES). A deadline that expires during the remote phase records no deadline-exceeded scan error; its effects show only in the remote fields and the probe counts. A remote whose fetch refspecs do not map the merge ref is no-remote-target, with no request, as Git names no upstream for it. A repository whose second remote-target read never started is cancelled. remote.limits.concurrency is left out of the concurrency-1 comparison, as change 2 leaves out budget.probe_concurrency. A --remote run and the same run without it need not agree when a signal ends the run or a write to standard output fails.
  • A residual: the caller's GIT_TRACE* variables reach the gh children unread. gh 2.96.0, run offline, started no git child and wrote no trace file on the failed-connection path; the success path is not verified (D5).
  • Which gh runs. gh is looked up once, in absolute PATH directories only, so a gh planted in the working directory never gets the caller's token (C-22). A directory error other than "gh is absent there" fails the lookup as gh-unavailable (C-35, C-36, C-38). gh starts in /, so a relative configuration path would resolve there, where a planted configuration could capture the caller's token. So a GH_CONFIG_DIR, XDG_CONFIG_HOME or HOME set to a non-empty value that does not begin with / makes the lookup fail: the rows are gh-unavailable, no gh child starts, and the README says to make the path absolute (C-41, C-44). When the deadline passes during the remote-target reads and one of those three values is relative, D5 now says that the test of the values is still made first, so the rows are gh-unavailable, which the spec ranks above cancelled (C-81).
  • Parsing. A response body that cannot be parsed, for any cause, is api-error and never an exit 2. Integer literals of more than 10 digits are rejected at parse time on every supported Python. Python's integer-string limit is absent from 3.10.0 to 3.10.6: its documentation says the limit came in 3.11, for CVE-2020-10735, and was backported to 3.10.7 (C-22, C-37, C-38).
  • Strict JSON. The parse decodes the body as strict UTF-8 itself. json.loads is never handed bytes, because then it accepts UTF-16, UTF-32 and encoded surrogates. A parse_constant hook rejects NaN, Infinity and -Infinity, which Python accepts by default. Each such body is api-error (C-39, C-40). number is checked by type, so true, 1.0 and 1e999 are api-error. A check on the answer that raises is api-error too, never an exit 2. The two Git reads that find the remote decode their output as strict UTF-8 as well (C-42, C-43).
  • Outcome order and exact sizes. No gh, or a gh that needs a login, outranks the 64-request cap. A key past the 64th stays request-cap at expiry. One extra byte is read to tell a body of exactly 1 MiB from a longer one (C-25 to C-29).

Review: the alignment review, council C and rounds C2 to C12 are applied, and proposal.md records their findings and rulings. Lane openRepoProject-3's reads were applied in rounds C4 to C12. Its last, a confirm read of rounds C10 and C11, found no HIGH or MEDIUM and six LOWs, all of which round C12 applied (C-45). Its read of round C12 found nothing (0 HIGH, 0 MEDIUM, 0 LOW). Lane openRepoProject-4 agreed the overview spec as committed in 233df0b (sha256 prefix 2ecd3d72), and C11's sentence on 2026-10-21, and lane openRepoProject-2 agreed the project-command block. Codex's review of 05a424a gave one finding, which round C9 applied (C-39), with the lead's C-40 found in applying it. Its review of f34dfe2 gave one, a relative GH_CONFIG_DIR. Checking it found a way to capture the token, which round C11 closes with a spec sentence (C-41, C-44). The overview spec was then sha256 prefix ce57ed5e; it was 8ef40dca from round C14 to round C17, and round C18's edit made it dee66d4f, round C20's made it 6fda0ae8, and round C21's makes it d42139fb. Its review of 21846c3 found no major issues (2026-10-21). Round C12, after that review, changed only design wording, one test description and the governance record. Reader RC, a read-only adversarial reader of this lane, read e11d755 and found no HIGH, five MEDIUM and six LOW. Round C13 applies M4, M5, L6 and L2 to L5 in design.md and Impact (C-46, C-47): D11's test seams, how D3 reads a URL's host, what D2 gives under transfer.credentialsInUrl=die, D10's count of the reads in probes, and Open Question 1's follow-on. The rest changed spec text: C-48 held them for lane openRepoProject-4, which agreed the held file, adding one clause of its own for a failed write to standard output. Round C14 commits it byte for byte (sha256 prefix 8ef40dca), with lane openRepoProject-3's compare of the held file finding nothing. Codex's review of 11a0ba2 raised four P2s, each one of C-48's items, which round C14 answers. Lane openRepoProject-3's confirm read of round C13 found 8 LOW, all applied in round C14 (C-49). Codex's review of 3965dfb found no major issues. Lane openRepoProject-3's confirm read of round C14 found 1 MEDIUM and 3 LOW, all applied in round C15 (C-50). The MEDIUM was the explicit-port order above, which the spec already required. This lane's final composition read of the three drafts added a second re-base check, from the change's own committed text, which returns any change to its ratified words to Brett Heap (C-51). Its edits of tasks 2.3 and 2.4 are committed on lane openRepoProject-4's YES. Codex's review of 2eeaec4 (15:55:35Z) found no major issues. Lane openRepoProject-3's confirm read of round C15 found 0 HIGH, 0 MEDIUM and 2 LOW, both wording, applied in round C16 (C-52). Task 1.3 and the C15 record now say that the edits of tasks 2.3 and 2.4 are made, and D3 step 3's first sentence no longer lists an explicit port among the cases with no identity. Codex's review of 6b5bf8f (16:40:00Z) found no major issues. Round C17 (2ab3743) applied that read's two wording LOWs (C-53). It also brought every place that states main's current head from e9d6711 to 15504f1, after checking that the cited paths are unchanged, and left the history as it was (C-54). The spec is unchanged. Codex's review of 2ab3743 (12:48:43Z) found no major issues. Round C18 (e1a9f84) applied the lane's reader findings of 2026-10-22. Change 1's evidence model, under PR #19's LQ-15 rule, and change 2's exit rule, under amendment A1, both refuse a run with a relative HOME or XDG_CONFIG_HOME before any child starts, so this change now states its gh-unavailable rule for those two only where neither refuses first, which holds on any base (C-58, preferred by lane openRepoProject-4). It also noted that feature 004 does not yet build gh's environment (C-57), made task 1.3 record each round (C-56), and corrected two counts (C-61). Codex's review of e1a9f84 (13:19:21Z) found no major issues. Round C19 (9a3f684) committed task 2.4's wording, on lane openRepoProject-4's agreement (C-62), and made the departures cite the packet lines they change (C-63). Codex's review of 9a3f684 (14:17:24Z) found no major issues. Round C20 (a6080a7) applied lane openRepoProject-3's confirm read of C18, which found four LOWs. Each requirement now has its own verb: change 1's evidence model bars every Git child, and change 2's exit rule refuses the run. Design D11's XDG_CONFIG_HOME and HOME cases carry C18's condition (C-65, C-66). The spec's sha256 was then 6fda0ae8. Codex did not review round C20: the request drew its usage-limit reply. Lane openRepoProject-3's confirm read of rounds C19 and C20 found no HIGH or MEDIUM and four LOWs. Round C21 (8276945) applied two of them, on lane openRepoProject-4's agreement: one spec word, so that the scenario on a missing or unauthenticated gh says neither requirement "stops" the run, and four stale spec-line cites in the design (C-67). The spec's sha256 is now d42139fb. Codex did not review round C21 either: its request drew the usage-limit reply. Round C22 (a529310) applied the other two LOWs, a design sentence that did not parse and a missing record row. It also checked the change against PR #19's round (h) at b3228bb, and no text here carries or restates what (h) changed (C-68). Lane openRepoProject-3's confirm read of rounds C21 and C22 found nothing (0 HIGH, 0 MEDIUM, 0 LOW). Round C23 (5ba7984, four commits: the design 7e58f4f, the proposal and tasks a449c4b, and two corrections to its own record, cd57924 and 5ba7984) applied lane openRepoProject-3's currency read (W118 and W124) and composition note (W117), the lane's review wave of 2026-10-23 (readers RC and RC2) and feature 004's CI finding (RE-8), as rulings C-75 to C-83. It scoped D11's hold control per argument vector and repository (RC's L1); took RC2-1 and RC2-2, the last sentences of the two bullets above; recorded in task 3.3, design Risks and the Migration Plan's step 3 that feature 004's git-floor job selects none of the overview tests (RE-8); and took W118's LOW-2, in the shorter words "the same four variables" so that D7 does not move, its LOW-1 Scope clause and lane openRepoProject-3's note on #37 at L-17. It deferred MEDIUM-1 (its facts are stated in the round's own section; see Order), MEDIUM-2 with task 2.3's re-base, W117's LOW-1 in tasks 2.3 and 2.4, and the #37 note's second site, because that text lies in ranges that lane openRepoProject-4 pins until PR #34 merges (C-79). Every pinned range keeps its bytes at its own lines, proved by cmp, and the line map records one shift, proposal a529310 :661-712, one line down, where no pin falls (C-81). Lane openRepoProject-4 confirmed independently that every pin holds, and spec 005 re-pins its #29 cites to 5ba7984. Brett Heap's O16 (a) for spec 005, that a bare repository's main row has branch, head and merged_into_target null, agrees with all nine merged_into_target sites here, and none was edited (C-80). Codex is at its usage limit, so round C23 requests no review. Lane openRepoProject-3's read of round C23 is queued.

Checks at 5ba7984: counted by #### Scenario headings, project-overview has 36 scenarios (2 in "Overview is local and read-only", 14 in "Overview bounds its work and reports what it omitted", 7 in "Overview prints a versioned JSON envelope", 13 in the added requirement, where the first description said 11) and project-command has 10, so 46 in all. /usr/bin/openspec validate add-project-overview-remote-merge-status --strict reports the change valid, and validate --all --strict passes 8 of 8. The change's validation prints two INFO lines, that archive needs change 2's project-overview spec and change 1's evidence model in project-command, as expected while those changes are unarchived. Round C23 touches no spec file, so both counts and the overview spec's sha256 prefix, d42139fb, stand, and the 351 lines it adds carry no non-ASCII, bidi or host-path text. CI and SonarCloud pass at 5ba7984: all six test jobs and SonarCloud Code Analysis, read once at 15:41:01Z.

Open questions for Brett Heap:

  • Client and limit (proposal.md, Open Questions, item 2; C-4). gh api or direct HTTPS? Recommendation: gh, so project never handles a token. The 5 s per-request limit then stands as the gh child's own, stated here and carried into change 1's evidence model, and change 1's 15 s stays for every other non-Git child. Direct HTTPS would replace the client and part of the response rules, so it is settled before the Speckit handoff.
  • Enum closure (proposal.md, Open Questions, item 1). Change 1 says enums are closed within a schema version, and change 2 says adding a field or an enum value is additive. This change adds no value to an existing enum, only a sub-record and an envelope object in --remote runs. Recommendation: keep schema_version: 1, and settle the disagreement where it bites. The first change it reaches is this change's own closed follow-on, which would add a value to remote.state (C-47).
  • Closed pull requests (proposal.md, Out of Scope; C-16). Recommendation: no closed state now. If Brett Heap wants one, a head-branch lookup matched by exact headRefOid is its own follow-on change, after these cases are checked live: a fork's pull request whose head branch name collides, a reused branch name, a rebase merge, a pull request of more than one commit whose head moved after it closed, and a name with more than one page of pull requests.
  • Squash-merged branches (proposal.md, Rules This Change Keeps; C-21). Whether a local patch-equivalence proof may join local ancestry is change 1's open question, and this change neither decides nor forecloses it. Here remote evidence only explains a kept row and is never a removal proof, and a ruling that admitted it would need its own verification. Change 1 recommends the local proof as a follow-on change.

The first description's question 3, for lane openRepoProject-4, is answered: feature 005 reserves no flag, field or hook for --remote (C-23).

Order: this change archives after change 2 (add-project-overview, issue #10), which itself follows change 1 and feature 005's merge, and after PR #19's amendment of change 1's evidence model lands or, if PR #19 closes, after this change's block of it is re-based on change 1's text. PR #19 is now at 4512441, its round (r), which lane openRepoProject-2 accepted (R-396); round C23's record names its head as 818311a, round (q) (R-389), which changes project-command. This change's project-command block stays at c462d87 until archive (C-82). If add-project-clean-branch-retirement (issue #23) archives first, this block is re-based on its archived block. Lane openRepoProject-4's amendment A1 (PR #34, ratified and not yet merged) amends change 2. Whichever of #34 and this change lands second re-aligns to the other, from the map in the lane's attachments (held-C48-11a0ba2/A1-review-d46681e.md). D7's spawning sentence and task 2.3 change then, for A1's Q16 B. Q16 is answered B (Brett Heap's "yes, recommended for Q1-Q17" of 2026-10-21, spec 005's C-70, carried by A1's D1), so the proposal's "feature 005's pending Q16" and D7's "blocked, as a Git child does" are out of date. Both lie in lane openRepoProject-4's pinned ranges and wait for #34 to merge (C-79). The Speckit handoff waits for ratification, those steps and one live contract check by hand (task 2.5). Nothing here changes feature 004's or 005's order.

The sections below are this description as first written on 2026-10-11, kept as history; where they differ from the change's proposal.md at 5ba7984, the proposal governs.

What this proposes

A new OpenSpec change, add-project-overview-remote-merge-status: an opt-in project overview --remote that reports exact-head pull-request evidence per worktree row under the packet's remote boundary (project-maintenance-project-discovery.md:1036-1060 at da33d92): identity from the merge target's branch configuration through a validated canonical GitHub remote, credential-bearing, malformed or non-github.com remotes giving unavailable with no request; queries deduplicated by host, repository and exact feature-head SHA; at most 64 requests, 4 concurrent, 5 s each, a 30 s remote budget inside the 60 s deadline; one page of at most 100 items and 1 MiB per body; rate limit, 401, 403, timeout, truncation or a further page as explicit unknown; expiry cancels queued and aborts in-flight requests. Evidence is reported as remote row fields and an envelope object present only in --remote runs (absent, not null, otherwise), with a staleness sentence, never a finding code, never an eligibility, plan-digest or revalidation input, and probes stays the exact Git-child count change 2 defines. The gh client is the GitHub client, each child under the bounds with update notices, prompts, telemetry and colour off. clean, status and doctor stay local-only. Harvest source 09af8c8 is reference only; none of its clean or doctor behaviour returns.

Capabilities

project-overview only (change 2's capability, unarchived): MODIFIED "Overview is local and read-only" (change 2's text carried whole, additions only, one scenario added); ADDED "Overview reports remote merge evidence on request" (11 scenarios). No change to project-clean, project-clean-review-safety, project-command or the packet. Both blocks were agreed with lane openRepoProject-4, the owner of change 2 and feature 005, before they were committed.

Dependencies and sequencing

Archives only after add-project-overview (#10) archives; its Speckit handoff waits for that archive and for feature 005, which is specified from change 2 as ratified, local-only, and reserves nothing for --remote. Independent of #23 and #24; it alters nothing in feature 004's or 005's order.

Open questions before Brett Heap (each with a recommendation in proposal.md)

  1. Enum closure: schema_version stays 1; the additions are a sub-record and an envelope object present only in --remote runs.
  2. Client: gh api (recommended, so project never handles a token) or direct HTTPS; the 5 s per-request bound is this child kind's own limit within the overview.
  3. For lane 4 to confirm: the two Git reads that find the merge target's remote are counted in the remote object's own probes, keeping the envelope's probes unchanged in every run.

Checks

/usr/bin/openspec validate add-project-overview-remote-merge-status --strict and validate --all --strict pass (8 items); status --change shows every artifact done. The INFO line that archive needs a project-overview spec is the expected state while change 2 is unarchived. Alignment review and council follow on this PR; their results are recorded in proposal.md and here.

🤖 Generated with Claude Code

Summary by Sourcery

Specify an opt-in remote merge-evidence extension for project overview that reports bounded exact-head GitHub pull-request status without affecting local results or cleanup eligibility.

New Features:

  • Define an opt-in project overview --remote capability for reporting exact-head GitHub pull-request evidence on applicable worktree rows.
  • Specify bounded, deduplicated GitHub queries with explicit unavailable and unknown outcomes, JSON fields, human-readable output, and strict isolation from local cleanup decisions.

Enhancements:

  • Extend the overview specifications to account for remote-target Git probes while preserving existing local classifications, completeness, and exit behavior.
  • Document the design, governance dependencies, sequencing, cancellation, credential handling, and offline test seams for the proposed capability.

Tests:

  • Add comprehensive scenario coverage requirements for remote evidence, request bounds, failures, cancellation, signals, and read-only behavior.

Chores:

  • Add the OpenSpec change artifacts, including proposal, design, specification deltas, and handoff tasks, pending ratification and later implementation.

brettheap and others added 9 commits October 11, 2026 17:46
Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…ent decision

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… handoff

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…ee edits

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@brettheap

Copy link
Copy Markdown
Contributor Author

@codex review

@sourcery-ai

sourcery-ai Bot commented Oct 11, 2026

Copy link
Copy Markdown

Reviewer's Guide

This draft OpenSpec change proposes an opt-in, read-only project overview --remote that obtains exact-head GitHub pull-request evidence through bounded, deduplicated gh api queries, exposes remote-only row and envelope data without affecting local results, and documents the governance and sequencing required before implementation.

Sequence diagram for bounded remote merge evidence collection

sequenceDiagram
    participant User
    participant Overview
    participant Git
    participant gh
    participant GitHub

    User->>Overview: project overview --remote
    Overview->>Git: for-each-ref
    Git-->>Overview: merge target remote configuration
    Overview->>Git: remote get-url
    Git-->>Overview: canonical remote URL
    Overview->>Overview: Validate github.com identity and deduplicate exact heads
    loop Up to 4 concurrent requests, maximum 64
        Overview->>gh: api --hostname github.com --include graphql
        gh->>GitHub: GraphQL exact-head query
        GitHub-->>gh: One page of pull-request evidence
        gh-->>Overview: Bounded response
    end
    Overview-->>User: Local overview plus remote evidence and freshness summary
    Note over Overview,GitHub: Remote evidence never changes findings, completeness, or cleanup eligibility
Loading

Flow diagram for remote evidence outcomes and isolation

flowchart TD
    A[project overview --remote] --> B[Collect and classify local worktree rows]
    B --> C[Read merge target remote configuration]
    C --> D{Canonical github.com remote?}
    D -- No --> E[unavailable: no request]
    D -- Yes --> F[Select rows with known exact heads]
    F --> G[Deduplicate by repository and exact head SHA]
    G --> H{Within request, concurrency, and time bounds?}
    H -- No --> I[unknown: cancelled or aborted]
    H -- Yes --> J[Query GitHub through gh api]
    J --> K{Valid bounded response?}
    K -- No --> L[unknown: timeout, auth, rate limit, truncation, or API error]
    K -- Yes --> M[Match head, base branch, and repository]
    M --> N[merged, open, closed, or not-found]
    E --> O[Attach remote-only row and envelope fields]
    I --> O
    L --> O
    N --> O
    O --> P[Render remote evidence]
    O -.-> Q[Local findings, completeness, and cleanup eligibility unchanged]
Loading

File-Level Changes

Change Details Files
Adds a draft OpenSpec contract for opt-in remote pull-request evidence in project overview.
  • Defines the modified local/read-only requirement and the new remote-evidence requirement with 13 scenarios.
  • Specifies row and envelope output fields, human-readable rendering, freshness messaging, and strict isolation from local classifications, cleanup eligibility, and exit behavior.
  • Records sequencing, ratification, archival, and Speckit handoff prerequisites rather than implementation tasks.
openspec/changes/add-project-overview-remote-merge-status/specs/project-overview/spec.md
openspec/changes/add-project-overview-remote-merge-status/proposal.md
openspec/changes/add-project-overview-remote-merge-status/tasks.md
Documents the proposed remote discovery, GitHub identity validation, bounded querying, response interpretation, and cancellation design.
  • Reads the merge target's configured remote through bounded Git probes and rejects missing, credential-bearing, non-GitHub, or malformed remotes without requests.
  • Uses deduplicated exact-head GraphQL queries through gh, capped at 64 requests, four concurrent children, 5-second request limits, a 30-second remote budget, one page, and 1 MiB bodies.
  • Defines explicit merged/open/closed/not-found/unavailable/unknown outcomes, response validation, deterministic matching, process isolation, signal handling, and expiry behavior.
  • Describes offline fake-gh seams and scenario coverage for bounds, failures, credentials, deduplication, isolation, and cancellation.
openspec/changes/add-project-overview-remote-merge-status/design.md
Adds the OpenSpec change metadata and validation-oriented governance record.
  • Declares the spec-driven change and creation date.
  • Tracks completed proposal/spec/design/validation artifacts and gates implementation on alignment review, council review, ratification, prerequisite feature landing, and archival.
openspec/changes/add-project-overview-remote-merge-status/.openspec.yaml
openspec/changes/add-project-overview-remote-merge-status/tasks.md

Possibly linked issues


Tips and commands

Interacting with Sourcery

  • Trigger a new review: Comment @sourcery-ai review on the pull request.
  • Continue discussions: Reply directly to Sourcery's review comments.
  • Generate a GitHub issue from a review comment: Ask Sourcery to create an
    issue from a review comment by replying to it. You can also reply to a
    review comment with @sourcery-ai issue to create an issue from it.
  • Generate a pull request title: Write @sourcery-ai anywhere in the pull
    request title to generate a title at any time. You can also comment
    @sourcery-ai title on the pull request to (re-)generate the title at any time.
  • Generate a pull request summary: Write @sourcery-ai summary anywhere in
    the pull request body to generate a PR summary at any time exactly where you
    want it. You can also comment @sourcery-ai summary on the pull request to
    (re-)generate the summary at any time.
  • Generate reviewer's guide: Comment @sourcery-ai guide on the pull
    request to (re-)generate the reviewer's guide at any time.
  • Resolve all Sourcery comments: Comment @sourcery-ai resolve on the
    pull request to resolve all Sourcery comments. Useful if you've already
    addressed all the comments and don't want to see them anymore.
  • Dismiss all Sourcery reviews: Comment @sourcery-ai dismiss on the pull
    request to dismiss all existing Sourcery reviews. Especially useful if you
    want to start fresh with a new review - don't forget to comment
    @sourcery-ai review to trigger a new review!

Customizing Your Experience

Access your dashboard to:

  • Enable or disable review features such as the Sourcery-generated pull request
    summary, the reviewer's guide, and others.
  • Change the review language.
  • Add, remove or edit custom review instructions.
  • Adjust other review settings.

Getting Help

@chatgpt-codex-connector

Copy link
Copy Markdown

You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard.
To continue using code reviews, you can upgrade your account or add credits to your account and enable them for code reviews in your settings.

Brett Heap and others added 5 commits October 18, 2026 21:00
…, C-10)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…isposal change's overview block (L-15, B-14)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…remote rows in the proposal, design and tasks (C-9, L-10)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…enRepoProject-4's fixes

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…d isolation wording

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 19, 2026
Follow-up 7 applies the packet-side items of three fidelity reviews,
of draft PRs #26 (874d1ad), #27 (3c08613 to 9ebe9f0) and #29
(c8a9f30), and section D of verification 9, to packet revision 1 at
382b3b9. It records what the ratified changes and the drafts say and
redesigns nothing.

- The packet overview's extension points now name paired branch
  retirement, which change 1's OQ-27 makes a change of its own.
- The deferred remote boundary records that change 1, ratified since,
  keeps 15 s for children other than Git, so its 5 s per request is
  open; draft PR #29 puts that to Brett Heap as its second open
  question.
- The cache and paired-retirement deferrals in Batch cleanup, the
  remote boundary in Overview and attention, and the handoff's
  paired-retirement and remote process text now name drafts PR #27,
  PR #26 and PR #29, each pending.
- The six present-tense baseline sentences ("is now 7a9134b", "has
  since") are dated as past ("became", "had since"), as section D of
  verification 9 asked, since main has moved on to e9d6711.

The other review items are declined: each is design for the drafts'
author, or the packet already matches the ratified text, the PR #2
decision record or revision 1's own record. Design record only; the
packet validator passes, the JSON fixtures and plan digests are
unchanged, and the D-A and D-B text stays verbatim.

Lane: openRepoProject-3
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Brett Heap and others added 5 commits October 19, 2026 23:37
…JSON envelope in the proposal, design and tasks (C-11, C-12; SA-2, SA-13, SA-14)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…nd exit sentences in the proposal and design (SA-1, SA-5, SA-6, SA-11, QA-1; C-13, C-14)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…tra unavailable reasons, and fix the cited ranges (SA-7 to SA-10, SA-12, SA-16, QA-11)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…he wrapper's failure control in the design (QA-9, QA-12, QA-13, QA-27 to QA-29; G4)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… alignment review of 563d19d (L-14)

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@brettheap

Copy link
Copy Markdown
Contributor Author

Lane: openRepoProject-5

Alignment review resolved (draft at 1229e79)

C's first alignment review read this draft at 563d19d in two passes: stack-architect and qa-lead. It found 45 rows: 18 MISMATCH, 10 DRIFT and 17 GAP. It took two inputs: lane openRepoProject-3's packet-fidelity reads (review-29 at c8a9f30, review-29-spec at 563d19d) and lane openRepoProject-4's check of the held spec.

Round C3 then applied it: 35 rows as written, 8 with a stated change, 2 overtaken by ruling C-11, and none declined. Every row is in proposal.md's "Questions Resolved by the Alignment Review" table.

This is still a draft for Brett Heap's word only. The council comes next, and nothing merges without his word.

What the review settled

Held, not yet committed

Lane 1229e79 commits the proposal, design and tasks. Both spec files are held:

Until both land, the committed spec is 563d19d's, with 28 scenarios. The committed proposal describes the held text: 46 scenarios in all, and tasks 1.4 and 1.5 are unticked for it.

Checks

@brettheap

Copy link
Copy Markdown
Contributor Author

@codex review

@chatgpt-codex-connector

chatgpt-codex-connector Bot commented Oct 19, 2026 •

Copy link
Copy Markdown

Codex Review Summary

This comment shows the latest Codex review activity on this pull request.

Review Status Commit Review trigger
📝 Code Review ⚠️ Failed 2026-10-22T15:36:27.532844Z
We couldn’t complete this review. Comment @codex review to try again.
8276945 Manual request
ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review" or "@codex security review".

Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings.

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>

@chatgpt-codex-connector chatgpt-codex-connector Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

💡 Codex Review

Here are some automated review suggestions for this pull request.

Reviewed commit: 1229e7976c

ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review".

If Codex has suggestions, it will comment; otherwise it will react with 👍.

Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".

Comment on lines +282 to +286
of the key, a response SHALL give `merged`, `open` or `closed` from the
returned pull requests whose head object id equals the row's `head` exactly,
whose base branch is the merge ref's branch and whose base repository is the
identity, a merged one before an open one before a closed one and the highest
number within a state; and `not-found` when none matches or GitHub holds no

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

P1 Badge Use a query that can return closed pull requests

When the exact-head pull request was closed without merging, this result mapping cannot produce the specified closed state: GitHub documents Commit.associatedPullRequests as returning the merged PR that introduced the commit and, when the commit is outside the default branch, associated open PRs—not closed-unmerged PRs (GitHub GraphQL Commit reference). The fixed D5 query will therefore return no match and report not-found, falsely claiming that no PR matched; the query strategy or the advertised states must change.

Useful? React with 👍 / 👎.

Comment on lines +297 to +299
on its own, a failure never stopping another key's request. No part of a
response body, of a `gh` child's standard error or of its environment SHALL
appear in either output. In a `--remote` run in which no child reaches its

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

P1 Badge Permit selected fields from the response body

For every successful merged, open, or closed result, the required number and url are taken directly from the response body and emitted in remote, so the unconditional rule that no part of a response body may appear in either output makes every such result violate the specification. Narrow this prohibition to raw bodies and unselected fields while explicitly allowing the validated fields the result contract requires.

Useful? React with 👍 / 👎.

Comment on lines +311 to +314
The envelope SHALL carry `remote`: `host` (`github.com`); `observed_at` (when
the first request started, null when none started); `freshness` (the sentence
"Remote evidence was queried live from github.com and may already be stale; it
never authorizes cleanup."); `limits` (`requests` 64, `concurrency` 4,

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

P2 Badge Avoid claiming a live query when none ran

When gh is unavailable, authentication is missing, every remote target is unusable, or the deadline expires before the first request, observed_at is correctly null and requests.performed is zero, yet the mandatory freshness text still says the evidence “was queried live.” Because that same sentence is printed in the human summary, these common failure paths produce a false user-facing assertion; define alternate wording for zero-request runs.

Useful? React with 👍 / 👎.

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Brett Heap and others added 2 commits October 22, 2026 14:25
…, lane openRepoProject-4's YES to the spec wording): D5's statement of C-44's rule at the 'first byte is not /' sentence gains '(C-44; XDG_CONFIG_HOME and HOME as the "Two texts" paragraph says, C-58)'; D5's C-58 paragraph says that the two texts stop a run under a relative HOME or XDG_CONFIG_HOME, pairs each verb with its own requirement (change 1's evidence model bars every Git child and inspects no repository, whether the subcommand then refuses or reports being its own requirement's rule; change 2's exit rule refuses the overview), says 'stops' for 'refuses' where the spec's condition is stated, drops D11 and Risks from the places that state the rule without the condition, and cites PR19/cmd at f0bf538, :116-129 (the paragraph runs to :129; the key defines PR19/cmd at c462d87); D11's test of C-44's rule splits its Refused list, the GH_CONFIG_DIR cases kept as they were, and gives the XDG_CONFIG_HOME and HOME cases C-58's condition (both rows gh-unavailable where neither requirement stops the run first; where either does, no gh child starts and the run ends as that requirement says, status 2 under amendment A1); Risks' bracket for the relative-path entry gains 'for XDG_CONFIG_HOME and HOME, where C-58's condition holds'; design.md 1548 to 1560 lines, all of it after D7 but 1 to 602 and 671 to 1180 equal to 9a3f684's, D5's residual :574-601 and D7 :954-989 cmp-identical; no spec edit in this commit

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…s W61 on round C18, 0 HIGH, 0 MEDIUM, 4 LOW, nothing departs: the Decisions bullet 'Run-wide unavailability' reads '(C-44; C-58 for the last two)' within its 11 lines, and the cite of PR19/cmd is written 'at f0bf538, :116-129' in the round C18 and C19 sections, with the design's D11, D5 and Risks edits in 6527f73) and C-66 (the spec edit in lane openRepoProject-4's form, e053ad6: each verb paired with its own requirement, sha256 6fda0ae8 replacing dee66d4f, 36 and 10 scenarios, the AND on 'No gh, or a gh without authentication' not edited and reported to the lead); the round C20 section with its eleven rows, Status and the citation key to C-66 within their line counts, tasks 1.1, 1.3 (this round records itself, C-56), 1.4 (one clause for C-66's committed spec edit, beyond the brief's list as C18's was) and 1.5 in place; lane openRepoProject-4's pinned ranges cmp-identical to 9a3f684 (proposal 334-345, 367-370, 430-438 and 1252-1417, tasks 20-23, design D5's residual 574-601 and D7 954-989, 'Dependencies and Sequencing' and 'Open Questions' equal by sha256), and every proposal paragraph before the round C6 section keeps its line count

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@brettheap

Copy link
Copy Markdown
Contributor Author

Round C20 (lane openRepoProject-5): 9a3f684..a6080a7, in three commits: the spec (e053ad6), the design (6527f73), then the proposal and tasks (a6080a7).

  • The scenario counts stay 36 and 10.

It applies lane openRepoProject-3's confirm read of round C18, which found no HIGH or MEDIUM and four LOWs (rulings C-65 and C-66).

  • Each requirement now has its own verb. Change 1's evidence model bars every Git child and inspects no repository, while change 2's exit rule refuses the run. The rule for a relative XDG_CONFIG_HOME or HOME holds only in a run that neither stops first.
    • Before this round, the spec said that both "refuse".
    • Lane openRepoProject-4, which cites this change's text, agreed this spec wording before the commit.
  • Design D11's test cases are split.
    • The relative GH_CONFIG_DIR cases hold on every base.
    • The XDG_CONFIG_HOME and HOME cases carry round C18's condition. Where either requirement stops the run, they assert only that no gh child starts and that the run ends as that requirement says.
    • Before this round, those cases expected gh-unavailable rows on every base, which would be wrong once amendment A1 lands.
  • D5, the Risks entry and a Decisions bullet now carry the same condition.
  • One cite now names f0bf538, the text it quotes.

Codex's review of 9a3f684 found no major issues.

Checks:

  • openspec validate --strict reports the change valid, and --all --strict passes 8 of 8.
  • Every MODIFIED block carries its source scenarios.
  • Every part of this change that lane openRepoProject-4 pins or cites is byte-identical.

This stays a draft for Brett Heap's word. Nothing here ratifies or merges it.

@brettheap

Copy link
Copy Markdown
Contributor Author

@codex review

@chatgpt-codex-connector

Copy link
Copy Markdown

You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard.
To continue using code reviews, you can upgrade your account or add credits to your account and enable them for code reviews in your settings.

…roject-4's YES, received 14:34:27Z on 2026-10-22): the last AND of the scenario 'No gh, or a gh without authentication' says 'stops' for 'refuses', as the requirement text says 'stops it before any child starts'; the one word, no other change, no scenario added or removed (36 and 10); lines 1 to 419 byte for byte as at a6080a7, project-command spec unchanged; sha256 d42139fb replacing 6fda0ae8

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 22, 2026
…C20; lane 3's W58 L1 and L2

By the lead's commit 3w decisions.
- #19's round (g2) at 3dcd2d8 edits no spec and shortens F-7's clause
  to " (--force if it holds a submodule)" at #19's six sites (design
  :1193, :1195, :1757, :1762; proposal :86, :91-92). FR-035 now gives
  those strings as #19's text at 3dcd2d8 (design :1192-1195); their
  re-alignment stays held for Brett Heap with #19's ratification, and
  the spec's remedy texts still follow A1.
- #19's round (g3) at 6bf9f77 adds one AND to each of two scenarios:
  project-clean "Only tracked-file deletions" (:211-212) and
  project-command "A linked worktree whose work tree is redirected"
  (:314). Every spec 005 cite of both specs was re-checked by script
  against 4f1c0e0: each keeps its text; project-command lines before
  :314 keep their numbers (:8-17, :116-129, :124-125, :131-157,
  :158-165, :204-214, :211-213, :221-227, :232-240, :311) and five
  scenarios after it move down 1; project-clean lines up to :210 keep
  theirs (:11-24, :15-16, :112, :170-174) and the rest move down 2
  (gate block :673-757, scenarios :855, :878, :893, caps :997-1000,
  re-run :1017-1027). Design edits G-4 (:1183-1190), G-5 (:1206-1215,
  Risk :1628-1636), G-1 (:257-261, :1236-1239) and the F-5 departure
  G-2 (proposal :1113-1127) are recorded; none reaches the overview
  through [E] or [G], and FR-007's LQ-11 reading holds.
- #25 stays pinned at 05a424a. C19 (d38b282, 9a3f684) edits no spec and
  commits task 2.4 on lane 4's YES (C-62): tasks :23 changes, :20-23
  now sha256 2e177de7..., equal to lane 5's file. C20 (e053ad6,
  6527f73, a6080a7) applies C-66 (W61) to the ADDED requirement,
  pairing each verb with its text (:420-426, :490; sha256 6fda0ae8...,
  36/10); lines after :425 move down 1, the scenario "Expiry cancels
  queued and in-flight requests" to :645-651. Every other cited range
  is byte-identical by cmp (proposal :334-345, :367-370, :430-438,
  :423-424, :1252-1417; spec :1-419; D5 residual :574-601; D7
  :954-989; D&S and OQ by sha256). The header, the #25 bullet, EC-022,
  security.md CHK003 and the LQ-15 item record it; LQ-15 cites C-44 in
  its C20 form (:417-426, :489-495, :624), no longer pending.
- W58 L1: the A1 bullet names both passes of the re-read, bbf1f7c and
  49d66a8 (N1). W58 L2: the header's #25 clause names the ranges at new
  lines and task 2.4.

Checklists: integration and suggestions-gates Evaluation lines and
suggestions-gates CHK010 (rounds (g2) and (g3)), security CHK003
(a6080a7), and a twenty-fifth-pass note in requirements.md. Totals are
unchanged: 414 items, 372 pass, 26 fixed, 0 open, 16 plan notes, 0 new
questions. Traceability is checked against amendment A1's ratified
deltas at e4a30fc: 13/13 and 64/64.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Brett Heap and others added 2 commits October 22, 2026 15:27
…c's ADDED requirement read the lines they name at 1cd73fb: D6's and D11's 'a positive integer number' at spec.md:479 becomes :483 (two places), D11's 'A 200 body SHALL be UTF-8 JSON' at :474-475 becomes :478-479, and its 'that cannot be decoded or parsed for any cause' at :466-467 becomes :470-471; each cite keeps its width, so design.md stays 1560 lines with every line wrapped as before, D5's residual :574-601 and D7 :954-989 cmp-identical to a6080a7; the cites at :219 (sha-qualified, at 2ab3743), :350, :429 and :1246 hold and stay; no spec edit in this commit

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…e round C20 writer's notes (a) and (b) and lane openRepoProject-4's YES, received at 14:34:27Z on 2026-10-22: 'refuses' becomes 'stops' in the last AND of the scenario 'No gh, or a gh without authentication', one word, spec sha256 d42139fb replacing 6fda0ae8, 36 and 10 scenarios, in 1cd73fb; the design's four stale cites of the spec's 'number' line (:479 to :483), its UTF-8 sentence (:474-475 to :478-479) and its decode-or-parse words (:466-467 to :470-471), in 266a30f, every other cite of a spec line checked and left as qualified or as history) and the note (c) on the commit messages of a6080a7 and 6527f73, which stand as history; #29's late read at a6080a7 (CI, all six test jobs and SonarCloud pass; Codex's usage-limit reply at 14:34:11Z, so Codex did not review round C20); the round C21 section with its seven rows, Status and the citation key to C-67 within their line counts, tasks 1.1, 1.3 (this round records itself, C-56), 1.4 (one clause for the committed spec edit, beyond the brief's list as C18's and C20's were) and 1.5 in place; lane openRepoProject-4's pinned ranges cmp-identical to a6080a7 (proposal 334-345, 367-370, 430-438 and 1252-1417, tasks 20-23, design D5's residual 574-601 and D7 954-989, 'Dependencies and Sequencing' and 'Open Questions' equal by sha256, spec 1-419), and every proposal paragraph before the round C6 section keeps its line count

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@brettheap

Copy link
Copy Markdown
Contributor Author

Round C21 (lane openRepoProject-5): a6080a7..8276945, in three commits: the spec (1cd73fb), the design (266a30f), then the proposal and tasks (8276945).

  • The scenario counts stay 36 and 10.

It applies ruling C-67, on the round C20 writer's notes.

  • One spec word. In the scenario "No gh, or a gh without authentication", the last AND now says that neither requirement "stops" the run before any child starts, where it said "refuses". That matches the requirement text as round C20 left it, where each requirement has its own verb. Lane openRepoProject-4, which cites this change's text, agreed this word before the commit. The spec's sha256 is now d42139fb.
  • Four design cites of the spec now read the lines that hold their text: :479 becomes :483 twice, :474-475 becomes :478-479, and :466-467 becomes :470-471. Every other spec-line cite was checked: each holds, or records an earlier head by name.

Codex did not review round C20: that request drew Codex's usage-limit reply. Lane openRepoProject-3's confirm read of rounds C19 and C20 found no HIGH or MEDIUM and four LOWs. This round applies two of them, and the other two come next.

Checks:

  • openspec validate --strict reports the change valid, and --all --strict passes 8 of 8.
  • The spec diff is that one word, and project-command is unchanged.
  • Every part of this change that lane openRepoProject-4 pins or cites is byte-identical.

This stays a draft for Brett Heap's word. Nothing here ratifies or merges it.

@brettheap

Copy link
Copy Markdown
Contributor Author

@codex review

@chatgpt-codex-connector

Copy link
Copy Markdown

You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard.
To continue using code reviews, you can upgrade your account or add credits to your account and enable them for code reviews in your settings.

Brett Heap and others added 2 commits October 22, 2026 15:44
…the sentence at :653-655, on change 1's evidence model, 'where one is relative bars every Git child and inspects no repository (relative-config-path), whether the subcommand then refuses or reports being its own requirement's rule', did not parse; the clause now ends at the code and goes on '; whether the subcommand then refuses or reports is left to its own requirement's rule', the sense of PR19/cmd at f0bf538 :128-129; the paragraph keeps its 25 lines (:646-670) by re-wrapping from :653 (three lines change), so that design.md stays 1560 lines and D5's residual :574-601 and D7 :954-989 are cmp-identical to 8276945; no spec edit in this commit

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
…s W66 on rounds C19 and C20, 0 HIGH, 0 MEDIUM, 4 LOW, nothing departs: C20-3 applied to design.md D5 in bbe8d53, C20-4 recorded as a row for Codex's review of 9a3f684 (no major issue), C20-1 and C20-2 recorded as applied in round C21), PR #19's currency read at b3228bb (round (h) accepted; project-command spec 361 lines, the block of [E] at :108-361, 254 lines, the cite 'PR19/cmd at f0bf538, :116-129' holding; no live place states the head, none edited) and the report on round (h)'s ceiling, gate 7 and F-2 texts (none carried or restated, none edited); the round C22 section with its eight rows (the lead's late read of 15:52:41Z: Codex's usage-limit reply, CI and SonarCloud passing at bbe8d53), Status and the citation key to C-68 within their line counts, tasks 1.1, 1.3 (this round records itself, C-56) and 1.5 in place; no spec edit (sha256 d42139fb and 208c06c3, 36 and 10), lane openRepoProject-4's pinned ranges cmp-identical to 8276945 (proposal 334-345, 367-370, 430-438 and 1252-1417, tasks 20-23, design D5's residual 574-601 and D7 954-989, 'Dependencies and Sequencing' and 'Open Questions' equal by sha256, spec 1-419), and every proposal paragraph before the round C6 section keeps its line count

Lane: openRepoProject-5

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
@brettheap

Copy link
Copy Markdown
Contributor Author

Round C22 (lane openRepoProject-5): 8276945..a529310, in two commits: the design (bbe8d53), then the proposal and tasks (a529310).

  • The spec is unchanged, and the scenario counts stay 36 and 10.

It applies ruling C-68, on lane openRepoProject-3's confirm read of rounds C19 and C20. That read found no HIGH or MEDIUM and four LOWs, with nothing departing, and round C21 had applied two of the LOWs.

  • One design sentence now parses. For a relative configuration path, change 1's evidence model bars every Git child, and whether the subcommand then refuses or reports is left to its own requirement's rule. The paragraph keeps its line count, so no cited line moves.
  • Codex's review of 9a3f684, which found no major issues, is now recorded in the round table.
  • PR OpenSpec: amend add-project-clean-all-safe so the push child reaches its remote #19's round (h) (b3228bb, carrying Brett Heap's rulings F-1, F-2 and O-1) touches nothing this change carries or restates. The cite of change 1's configuration-path paragraph (PR19/cmd at f0bf538, :116-129) holds at b3228bb.

Codex did not review round C21: that request drew Codex's usage-limit reply, so this round requests no review. CI and SonarCloud pass at bbe8d53.

Checks:

  • openspec validate --strict reports the change valid, and --all --strict passes 8 of 8.
  • Both spec files are byte-identical to round C21's.
  • Every part of this change that lane openRepoProject-4 pins or cites is byte-identical.

This stays a draft for Brett Heap's word. Nothing here ratifies or merges it.

brettheap pushed a commit that referenced this pull request Oct 22, 2026
…at #29's C21 and C22; lane 3's W68

By the lead's commit 3x decisions.
- #19's round (h) at b3228bb (e322f52, 324192f, fc95766, b3228bb)
  carries Brett Heap's 15:24Z ruling, "F-2: yes; F-1: prune-then-delete;
  O-1: deadline-exceeded" (R-263). F-1 at project-clean :327-331,
  :500-504 and :1159-1164; O-1, gate 7's deadline-cut read ending
  deadline-exceeded, at :713-718; RI-3 at :1050-1056 and review-safety
  :77-85; R-258's variant inspection-incomplete remedy (design
  :1311-1331), pinned by project-command :314, with a new AND at :317.
  Every cite of the three specs (154 rows: 43 pcm, 83 pcl, 28 rs) was
  located by line alignment and re-checked against 6bf9f77: round (h)
  changes the gate block's gate-7 sentence, review-safety's bound and
  the :314 AND; every other cite keeps its text, at its lines or new
  ones (pcm after :316 +1; pcl after :326 +4 to +23, gate block
  :682-769; rs after :85 +2); EC-022's Risk at design :1739-1744.
  The records of F-2 and F-1 now say that he ruled.
- Held, not changed: the overview's gate-7 outcome follows A1
  (inspection-incomplete); A1's re-alignment of its seven O-1 sites is
  held for Brett Heap's ruling for change 2 (FR-034, with C-22 and
  EC-020). The line-feed estimated count follows A1; its re-alignment
  is held with #19's ratification (FR-020, EC-032).
- #25 stays pinned at 05a424a. C21 (1cd73fb, 266a30f, 8276945) changes
  only "refuses" to "stops" at spec :624 (sha256 d42139fb..., 36/10,
  661 lines); C22 (bbe8d53, a529310) edits no spec, design :653-655
  only. Every pinned and cited span is byte-identical by cmp from
  a6080a7 (proposal :334-345, :367-370, :430-438, :423-424,
  :1252-1417; tasks :20-24; D5 :574-601; D7 :954-989; spec :1-623 and
  :625-661; D&S and OQ by sha256). Header, #25 bullet, EC-022 and
  security CHK003 record it; LQ-15 says C20 and C21 pair the verbs
  (W68 L4).
- W68: M1 (only the LQ-15 item cites C18's edited lines; "every other
  line"), L5 (neither ... nor), L2 (project-command last changed at
  93f3194), L3 (F-3 at :792-794 and :794-796); L1 recorded (48 cites,
  not 49); the twenty-fifth pass corrected for M1 and L2.

Checklists: suggestions-gates CHK023 and observability CHK003 note the
held conditions; integration, suggestions-gates and observability
Evaluation lines; security CHK003 (a529310); a twenty-sixth-pass note in
requirements.md. Totals are unchanged: 414 items, 372 pass, 26 fixed, 0
open, 16 plan notes, 0 new questions. Traceability is checked against
amendment A1's ratified deltas at e4a30fc: 13/13 and 64/64.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 23, 2026
…O16 open; triage spec fixes

By the lead's commit 3ak decisions, from 39f4ab6 (plan revision 7).
Spec.md and requirements.md only; the plan files and
clarify-questions.md are untouched.
- Brett Heap's word of 2026-10-23T12:19:11Z, "yes, recommended for O3,
  O5, O8-O11 and D5 clause 2" (RULED at 12:21:32Z), is recorded in
  C-72, each option in R20's words at 39f4ab6: every item from O1 to
  O11, and D5's clause 2, is chosen. C-72's heading names both dates.
- The held notes state the chosen behaviour, which lands with A1's
  re-alignment (O9 (A) and O10 (A) keep A1's text): FR-006 (clause 2
  by name), FR-007 (O5; O11), FR-008 (O11's two parts, part 2's
  remedy row), FR-020 and EC-032 (O3), FR-026 (O9), FR-028 (O8),
  FR-035 (clause 2), FR-043 (O10), EC-012 and US8 s1 (O11), the A1
  bullet (O9, O11), the records of rounds (h), (i), (j) and (m), and
  the LQ-15 bullets (O10).
- O12 to O16 are recorded in C-72 as open, with their options, the
  lane's recommendation and the reading built until he rules, and held
  at FR-026 and the parity record (O12), FR-006, FR-009 and US8 (O13),
  US8 and EC-012 (O14), FR-035 (O15), and C-40, C-68 and FR-008 (O16).
- The triage's FIX-SPEC items: TA R2-1 (b), the gitfile exception
  (FR-006, FR-009); TA S5-16, DI:535 cited for the third exception
  (FR-007, FR-008, the Dependencies' two collector-table sites); TB
  R3-9 (SC-005); TB R1-8 (the parity record: 004's fix landed as
  91552e3, project:3511-3514 at d6bac50, the case held as O12); TB
  LANE2-PINS (FR-016, the LQ-10 bullet); TC R7-8's rider (FR-038);
  TC W119 (Out of Scope names #36 and #37). No FIX-PLAN item.
- W111 LOW-1: the pointer reads "(R1 and its "Revision" sections)" at
  its four sites. W111 LOW-2: the thirty-eighth pass says that three
  of them keep the plan at a80f10b.
- Feature 004's d8724e2 (R-365) is recorded in the round (n) record
  as a later head; git diff d6bac50 d8724e2 -- project adds one TEXT
  row and changes partial_removal_text, print_result and repo_state
  only, none of which the spec names. #19 88d0d36, #27 288fc34 and
  #29 a529310 unchanged.
- Checklists: the thirty-ninth pass and the totals line in
  requirements.md. Totals 414/372/26/0/16/0.
- Checks: trace 13/13 and 64/64, FAILURES 0; check_spec 13 of 13 and
  64 of 64, possible implementation names []; openspec validate --all
  --strict 7 passed; diff --check clean; 421 added lines ASCII, at most
  79 columns, no host paths, no "tip" or "current head"; pins 05a424a
  4, fe5b245 7, e4a30fc 51, 961c405 6, 2250830 6 (unchanged);
  clarify-questions.md unchanged.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 23, 2026
#27 at d95eea2

By the lead's commit 3al decisions, from 1d46b0b (3ak).
Spec.md and four checklists only; the plan files, clarify-questions.md
and openspec/ are untouched.
- Brett Heap's word typed in lane openRepoProject-3's pane at
  2026-10-23T13:30:30Z, "yes, recommended for O12-O16" (RULED there at
  13:32:29Z, to #10; NOTED by lane 4 at 13:35:04Z), is recorded in
  C-72: O12 (A), O13 (A), O14 (A), O15 (A) and O16 (a) are chosen, so
  every held item of feature 005, O1 to O16 and D5's clause 2, is
  chosen. C-72 says that O13 (A), a rewording of A1's design D3 case 3,
  reaches A1 in the re-alignment commit, as O3 and O5 do, and that O12
  (A) and O14 (A) keep A1's behaviour as ratified; its "Where applied"
  adds SC-003 and the Key Entities.
- The held notes state the chosen behaviour: FR-026 and the
  Dependencies' parity record (O12, a lasting difference that the parity
  tests name; W127 LOW-3), FR-006, FR-009 and User Story 8 (O13, landing
  with A1's re-alignment), User Story 8, FR-006 and EC-012 (O14, a known
  limit), FR-035 (O15), and C-40, C-68 and FR-008 (O16, FR-008 now
  recording the departure from C-40).
- W127 LOW-1: the round (n) record says "the functions of project that
  the overview reuses"; d8724e2 changes TEXT (one row added, no row
  changed), partial_removal_text, print_result and repo_state, none of
  which the overview reuses, and the record names the TEXT rows that the
  spec cites: 004's row-error texts, its command-neutral git-too-old and
  git-unavailable texts, clean's two target-not-repository-root messages
  and its locked stale text, all unchanged.
- W127 LOW-2, the clause: the LQ-11 bullet's collector-table site gains
  the A1 bullet's clause on the third exception (the core.worktree read's
  unset exit 1, from DI:535), so the thirty-ninth pass's two sites both
  state it. Every S5-16 site names DI:535 (FR-007, FR-008, both
  Dependencies sites).
- Owed gaps: SC-003 names O9's and O12's lasting differences; Key
  Entities' null-root list gains the redirected main worktree (O4 (a))
  and the failed core.worktree read (O11 part 2 (A)); observability.md
  CHK003 (O3), discovery-identity.md CHK016 (O5) and integration.md
  CHK004 (O9, O12; 91552e3) state the chosen items, each Evaluation
  recording the re-read, categories unchanged.
- #24 re-checked at #27's d95eea2 (round B24; bab9e24, 309113b,
  d95eea2): the eight ranges byte-identical to 288fc34's by cmp at
  proposal :803-806, :834-837, :937-949, :967-968, design :1199-1202,
  :1278-1281, :1938-1944 and tasks :198-213; project-overview blob
  a40458c; header list and Dependencies record. Pin fe5b245 kept.
- #19's round (p) at e0b1671 is not recorded: the cite map was not
  complete when this commit reached it (no MAP.md at 13:56:09Z). #19
  stays at 2250830, #29 at a529310, feature 004 at d8724e2.
- Checklists: the fortieth pass and the totals line in requirements.md.
  Totals 414/372/26/0/16/0.
- Checks: trace 13/13 and 64/64, FAILURES 0; check_spec 64 of 64,
  possible implementation names [], undefined FR-062 and FR-067 only;
  openspec validate --all --strict 7 passed; diff --check clean; 183
  added lines ASCII, at most 79 columns, no host paths, no "tip" or
  "current head"; recount 414/372/26/16; pins 05a424a 4, fe5b245 7,
  e4a30fc 51, 961c405 6, 2250830 6, a529310 6, 88d0d36 2, d8724e2 1
  (unchanged); d95eea2 0 to 3, 288fc34 3 to 5, a40458c 7 to 8.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Brett Heap and others added 4 commits October 23, 2026 14:38
…pository name that begins with a dot, such as .github, among the names the shared identity rule refuses though GitHub allows them (RC2-2); D5's paragraph on the two texts says that amendment A1 refuses the overview for the same four variables (W118's LOW-2, applied with change in that form, C-81); D5's lookup-failure paragraph says that the test of the three configuration variables is made first even when the lookup falls due past the deadline (RC2-1, C-81); D11's counting git wrapper scopes each control, change 2's hold among them, to a chosen argv in a chosen repository, the -C directory it records (RC's L1); Risks' Git 2.36 floor entry names feature 004's git-floor job and its -k list (RE-8's last sentence); Migration Plan step 3 names every job the tests workflow then runs, git-floor at PR #33's d8724e2 included (RE-8). The three edits before D7 keep their paragraphs' line counts (10, 25 and 16), so D5's residual 574-601 and D7 954-989 are cmp-identical to a529310; design.md 1560 to 1575 lines, all added after D7; no spec edit in this commit

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
…penRepoProject-3's W118 and W124 on a529310, 0 HIGH, 2 MEDIUM, 2 LOW, nothing departs; its W117 compose LOW-1; its W119 note on #37; reader RC's L1 and RC2's three LOWs; reader RE's RE-8; the O16 check of C-80)

Impact's README bullet says that a repository name that begins with a dot, such as .github, is refused too (RC2-2), the tests bullet re-wrapping word for word to give the line back; L-17's entry in the Decisions says that lane openRepoProject-1's #37 takes the re-base rule over by analogy for overview blocks it shares (W119, C-81), the C-7 bullet re-wrapping word for word, so that a529310's lines 679-722 sit one line lower and lines 724 on keep their numbers; the Scope, C-1 bullet's packet cites read since ratified, DI:1806-1808 and OV:514 at 15504f1 (W118's LOW-1); Status and the citation key reach C-82 within their line counts; tasks 1.1, 1.3 (the round C23 clause: PR #19 at e0b1671 and now 818311a, round (q), which changes project-command, the block of [E] staying on c462d87 for task 2.4), 1.5 and 3.3 (every job of the tests workflow, git-floor included, RE-8) in place, 45 lines still; the round C23 section with MEDIUM-1's facts in lane openRepoProject-4's words, C-69 to C-72's record lines, the O16 check (all nine merged_into_target sites agree, none edited) and a table of 17 rows. Deferred by C-79 to the round after #34 merges: MEDIUM-1's live sentences (proposal 559-570, design 978-981), MEDIUM-2, W117's sentence for tasks 2.3 and 2.4, and naming #37 at proposal 578-579. No spec edit (sha256 d42139fb and 208c06c3, 36 and 10 scenarios); lane openRepoProject-4's pin set as C-81 confirms it is cmp-identical to a529310 at its own lines

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… shift is a529310's lines 661 to 712 (the rest of L-17's paragraph, then from 679 the span C-81 accepted), not 679 to 722, the C-7 bullet ending at 723 as before; and in design.md every line before D11's bullet keeps its number, not lines 1 to 1236 (1229-1236 are D11's edited lines)

Found by the writer's own difflib line map of a529310 against a449c4b. Three sentences of the section change, in its paragraphs on design.md and on this file and in the W119 row; no other line of the change moves, and lines 1 to 2584 are byte for byte as at a449c4b

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
… proposal is edited in the commits after 7e58f4f, not in one last commit, cites the citation key at 44-45, names the Decisions paragraph by its first addendum (2026-10-18) and says that the section and task 1.3's clause also name merged_into_target, records only; task 1.3's clause says that Risks names the git-floor job and its -k list and the Migration Plan's step 3 every job of the tests workflow

A proofreading pass by the writer before its report. No line before the round C23 section moves (proposal lines 1-2584 byte for byte as at cd57924), tasks.md stays 45 lines with lines 20-24 as at a529310, and no spec is edited

Lane: openRepoProject-5

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@sonarqubecloud

Copy link
Copy Markdown

@brettheap

Copy link
Copy Markdown
Contributor Author

Round C23 (lane openRepoProject-5): a529310..5ba7984, in four commits:

  • the design (7e58f4f);
  • the proposal and tasks (a449c4b);
  • then two corrections to the round's own record (cd57924, 5ba7984).

No spec file changes, and the scenario counts stay 36 and 10.

The round applies:

  • lane openRepoProject-3's currency read of this change (W118 and W124) and its composition note (W117);
  • the lane's review wave of 2026-10-23 (RC and RC2);
  • feature 004's CI finding (RE-8).

These are rulings C-75 to C-83.

Codex is at its usage limit, so this round requests no review. CI and SonarCloud at 5ba7984 are read once, later.

Checks:

  • openspec validate --strict reports the change valid, and --all --strict passes 8 of 8.
  • The spec files are unchanged: project-overview (36 scenarios) and project-command (10).
  • The 351 added lines carry no non-ASCII, bidi or host-path text.

This stays a draft for Brett Heap's word. Nothing here ratifies or merges it.

brettheap pushed a commit that referenced this pull request Oct 23, 2026
…Ws; FR-008 wrap; #29 at 5ba7984

By the lead's commit 3am decisions, from e342275 (plan revision 9, on 3al).
Spec.md and three checklists only; the plan files, clarify-questions.md,
tasks.md and openspec/ are untouched. Part 1 takes the decisions'
sections 1, 2, 3, 5 and 6; part 2 takes section 4, #19's rounds.
- Section 1, no word yet: O17 to O20, which #19's round (q) at 818311a
  raised from Brett Heap's "yes, recommended for Q1-Q9" (R-380), are
  held open in C-72 in 3ak's form for O12 to O16, each with its options
  and "(A)" recommended, this spec building A1 as ratified, and the four
  status pins as FR-016 states them, until he rules: O17, Q5's next
  steps (248 and 243 characters) past D5's 200; O18, Q3 (b)'s warning on
  the stale recommendation (305 and 318); O19, the wider
  registration-mismatch; O20, the fifth status pin. C-72's question
  names O17 to O20.
- W130 MEDIUM-1: C-72's rule sentence names what reaches A1 in the
  re-alignment commit (O13 (A); A1's records for O12 (A), O14 (A) and
  O15 (A), with O14's Risks entry and O15's D5 sentence; an entry for
  O16 (a)'s null branch, head and merged_into_target, since A1 adopts
  the packet's JSON types, the lead's choice) and what this spec builds
  now (O12 (A) and O14 (A) as A1 is ratified; O15 (A) and O16 (a) ahead
  of A1's text, declared at FR-035, C-40, C-68 and FR-008).
- FR-035's "built now" clause for O15 (A): D5's two rules cannot both
  hold there; D5's sentence reaches A1 as the re-alignment's item 15, as
  the A1 draft numbers it (a1-realign-draft.md, "Item 15"; W130 said
  item 8).
- W130 LOW-1: C-68's "needs no amendment" excepts the null branch, head
  and merged_into_target below. LOW-2: the records of rounds (g), (h)
  and (i) name the chosen option, "the choice, made by O1 (A)", "as O2
  (A) chose", "chosen as O4 (a)". OBS-4: C-72's sha-pinned history kept.
- Section 3: FR-008's 42-character line is re-wrapped with the lines
  after it to the paragraph's end, no word changed (checked by script).
- Section 5: #29 at 5ba7984 (round C23, a529310..5ba7984: 7e58f4f,
  a449c4b, cd57924, 5ba7984; no spec file touched): every pinned and
  cited range byte-identical at its lines by script (proposal :334-345,
  :367-370, :430-438, :423-424, :417-597, :1065-1103; tasks :20-24;
  design :574-601, :954-989; overview spec whole), as lane 5's line map
  (sha256 800bf1e6ab683c2b...) gives it; recorded at the header,
  EC-022, the #25 bullet (a new re-check sentence) and the LQ-15 bullet.
  Pin 05a424a kept.
- Section 6: security.md CHK002 and CHK019, idempotency.md CHK008 and
  requirements.md's eighth pass (:499; its :482 states no pin count)
  name the fifth pin, O20, open, categories unchanged, each Evaluation
  recording the re-read; requirements.md gains the forty-first pass and
  the totals line. Totals 414/372/26/0/16/0.
- Feature 004 stays at d8724e2 (origin's 004 branch, as last fetched;
  lane 2's impl/004-q-build at 703b58c is not merged there). #19 stays
  at 2250830 in this part.
- Checks: trace 13/13 and 64/64, FAILURES 0; check_spec 64 of 64,
  possible implementation names [], undefined FR-062 and FR-067 only;
  openspec validate --all --strict 7 passed; diff --check clean; 219
  added lines ASCII, at most 79 columns, no host paths, no "tip" or
  "current head"; recount 414/372/26/16; pins 05a424a 4, fe5b245 7,
  e4a30fc 51, 961c405 6, 2250830 6, 88d0d36 2, d8724e2 1, d95eea2 3
  (unchanged); a529310 6 to 7, 5ba7984 0 to 6, 818311a 0 to 2, 3dcd2d8
  4 to 5.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 23, 2026
… re-pins; O17-O20 held at their sites

By the lead's commit 3am decisions, from e342275 (plan revision 9, on 3al).
Part 2 takes the decisions' section 4, on part 1 (25c1219), by the round
(q) map alone: the round (r) map (pin19-4512441/MAP.md) read "STATUS: IN
PROGRESS" when this part reached section 4 (18:08:12Z), so round (r) at
4512441 is not taken. Spec.md and requirements.md only; the plan files,
clarify-questions.md, tasks.md and openspec/ are untouched.
- The record (row 13): the round (n) record names #19's round (p) at
  e0b1671 (R-365, Brett Heap's answers of 11:49:16Z, with R-377) and
  round (q) at 818311a (his "yes, recommended for Q1-Q9" of 13:30:27Z,
  R-380; T9 in project-command, R-378; W126, R-382) as later heads, in
  3ak's form for d8724e2, and says that this spec keeps its reading of
  #19 at 2250830. requirements.md's thirty-sixth (:1187-1189) and
  fortieth (:1302-1304) passes point to it.
- Re-pins (Tier A SAME and MOVED): the live cites are cited at 818311a
  beside their 2250830 lines (FR-028: pcl:166, the same line; the labels
  at proposal :2833-2838; the A1 bullet: row 4b at design :539-543), and
  the record gives the round (n) and (o) records' cites at 818311a (pcl
  :166, the third text :362-366 and :1230-1235, the ceiling's AND
  :549-554; design :539-543 and :73), those records' own text kept at
  the commits they name. The e0b1671 plan cites are untouched.
- CHANGED cites: FR-028's T6 cite (S-02) depends on the changed plain
  form, so FR-028 states round (q)'s Q3 (b) forms (design :1469-1478),
  T6's unread form standing at :1454-1468; the record's other CHANGED
  cites (S-05 to S-07, S-09, S-10, S-12, S-13, S-15) are history of
  2250830, and the record names what changed at 818311a (S-05's words
  re-wrapped at proposal :2863-2874; S-12 and S-13's third text moved
  inside a changed hunk).
- Stale statements: FR-028 and FR-026 (rows 14-15, O18); the TEXT rows
  (row 16, O18, in the record); FR-016 and the LQ-10 bullet (rows
  17-19, O20: Q1's fifth pin at pcm:158-168, the bullet's trigger now
  past, its parity sentence holding once the fifth pin is taken);
  EC-033 (row 20: #19's pcm:265-271 and design D1 :171-180 for the
  same rule, feature 004's status_warned at project:3012 of d6bac50,
  checked there; "not yet named" and "pending" dropped); FR-032 and
  SC-004 (row 21, O19; prs:12-16; Q2's nested .git check is
  contains-submodule's, pcl:771-777, batch-only); FR-035 and C-72's O1
  clause (row 22, O17; design :1376-1382); the record (row 23: Q3 (a)
  and Q4; row 25: #27 kept at d95eea2 until lane 5's B25 line map
  arrives, #29's block of [E] on c462d87 until archive, by its task 2.4
  and its round C23 record, cited so since check_spec reads "C-82" as
  this spec's; row 26: this spec's T9 is R-365's). C-72's "Where
  applied" adds FR-016, FR-032 and SC-004.
- requirements.md's forty-first pass takes section 4; totals unchanged,
  414/372/26/0/16/0.
- Checks: trace 13/13 and 64/64, FAILURES 0; check_spec 64 of 64,
  possible implementation names [], undefined FR-062 and FR-067 only;
  openspec validate --all --strict 7 passed; diff --check clean; 203
  added lines ASCII, at most 79 columns, no host paths, no "tip" or
  "current head"; recount 414/372/26/16; pins 05a424a 4, fe5b245 7,
  e4a30fc 51, 961c405 6, 2250830 6, a529310 7, 88d0d36 2, d8724e2 1,
  5ba7984 6 (unchanged); 818311a 2 to 15, e0b1671 0 to 1, d6bac50 6 to
  7, d95eea2 3 to 4.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 23, 2026
By the lead's word to the 3am writer, from 34845b7 (3am).

#19's round (r), 4512441, is taken by lane openRepoProject-4's map of this
spec's cites at that head (pin19-4512441, COMPLETE). 2250830 stays the
pinned reading. O17 to O20 stay open.

- The round (n) record (spec.md:5207-5251) records round (r) beside (p) and
  (q), on the lead's R-391 (W133's MEDIUM-2, MEDIUM-4 and LOW-1, W131's
  LOW-3), with no new word of Brett Heap's. It names:
  - [L]'s four stale forms, pcl:188-213, copied by script from feature
    004's TEXT at 703b58c (impl/004-q-build), which this spec does not pin;
  - Q8's qualifier, pcm:268-271;
  - revalidation's .git lstat and contains-submodule, prs:111-116 and
    :131-133, a check the overview does not run (FR-007);
  - LOW-1's reworded AND tail, pcl:585-586;
  - M1 and M3, texts the overview never shows (C-59);
  - O17 to O20's texts, unchanged.
  Its list of the round (n) and (o) records' cites moves to 4512441:
  pcl:166, :400-404, :1268-1273 and :587-592, design :550-554 and :73, and
  proposal :2897-2908. It also says that round (r)'s edits reach #27's
  classification, retire and revalidation blocks and #29's block of [E].
- The cites set at 818311a move to 4512441, sha and lines both. Each cited
  range was compared by cmp: byte-identical except EC-033's, which round (r)
  edits.
  - FR-016 (2735-2749): pcm:158-168.
  - FR-028 (2966, 2973, 2987-2994): pcl:166, proposal :2867-2872, design
    :1491-1500 and :1476-1490.
  - FR-032 (3063-3074): prs:12-16, pcl:809-815.
  - FR-035 (3154-3158): design :1397-1403.
  - The A1 bullet (4405): design :550-554.
  - The LQ-10 bullet (5287-5295): pcm:158-168, pcl:809-815.
  - EC-033 (2228-2231): pcm:265-271, design D1 :174-191.
  - The record: "citing beside it at 4512441".
- EC-033 (2233-2235): the refs/heads/HEAD consequence holds "under Git's
  default core.warnAmbiguousRefs" (pcm:268-271 at 4512441; W131 LOW-3). A
  new sentence (2243-2247) gives #19's record of the setting false (design
  :184-191).
- FR-028 (2994-2999): cites [L]'s statement of the four stale forms,
  pcl:188-213 at 4512441, beside the design cites. O18 stays open.
- security.md CHK003 (41-47) and its Evaluation (168-169) add #29's
  5ba7984; its D5 residual is byte-identical to a529310's by cmp.
- requirements.md: the forty-second pass (1370-1402); the thirty-sixth and
  forty-first passes point to it (1188-1190, 1363-1364); the totals line
  reads "thirty-fifth to forty-second" (1527).
- C-72 is unchanged: spec.md:956-1097, sha256 95a516fa...

Checks: trace_check 13/13, 64/64, FAILURES 0; check_spec 64 of 64,
implementation names [], undefined FR-062 and FR-067 only; openspec
validate --all --strict 7 passed; git diff --check clean; 169 added lines,
ASCII, max 79 columns, no host paths, no "tip" or "current head"; recount
414 items, 372 pass, 26 fixed, 16 plan notes.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap pushed a commit that referenced this pull request Oct 24, 2026
…23 open; #27 at 7f3453c

From 220ad83 (3at), by the lead's 3at decisions, section 2, items 5
and 6. Only spec.md and checklists/requirements.md are edited.

Hunks (new lines):
- spec.md:79-84: the header names 904aefc (project as at d640539)
  among feature 004's cited heads.
- spec.md:149-151: #27's re-checks list 37c0c23 and 7f3453c (B25, B26).
- spec.md:1097-1098: C-72's O21 (A) carries both halves of his (A),
  the lasting difference beside O12's (W151 OBS (1)).
- spec.md:1104-1129: C-72 states O19's outcome at 904aefc (lane 2's
  R-416, R-424): clean gives an enclosing, common-directory or
  symbolic-link linked row inspection-error, unprobed, dirty null, at
  registration-mismatch, the main row at a shared path main-worktree;
  the overview's class follows (FR-026), FR-034 withholds --all-safe.
  O21's rows at 904aefc: branch rows inspection-error
  (project:3717-3724, :3760-3761), a detached row its ladder class, a
  missing row stale-worktree (:2488-2489), each null in A1.
- spec.md:1149-1174: C-72 records O23 open, (A) recommended: whether
  the overview status-probes such a row and which finding it shows
  (FR-007 does not name it; a shared realpath it does, EC-031); FR-007
  as ratified built until he rules. Where applied re-wrapped.
- spec.md:2548-2554: FR-007 holds those rows to O23.
- spec.md:3037-3044: FR-026 names O21's case a lasting difference and
  its rows at 904aefc.
- spec.md:3191-3205: FR-032 states O19's outcome and holds O23.
- spec.md:3770-3776: SC-003 counts three lasting differences, O21's
  with its condition (W151 OBS (2)).
- spec.md:3883-3888: the Assumptions name 904aefc.
- spec.md:4057-4065: the Dependencies parity record at 904aefc.
- spec.md:4273-4290: the #24 bullet re-checks #27 at 7f3453c, B25 at
  37c0c23 on the way, eight ranges cmp-equal to d95eea2's; the
  project-overview blob a40458c unchanged.
- spec.md:5375 and :5386-5396: the round (n) record records 904aefc;
  "wait for" becomes "waited for".
- spec.md:5481-5494: the round (r) record: B25 and B26 landed, #27's
  re-check moves to 7f3453c; #29's block of [E] still owes round (r).
- checklists/requirements.md:1547-1584: the forty-ninth pass.
- checklists/requirements.md:1709-1710: the totals line names it;
  recount 414 items, 372 pass, 26 fixed, 16 plan notes.

C-72 is spec.md:961-1174 at this commit, 214 lines, sha256
240c39e6... (3ao-verify/c72-3au.txt). #19 stays at 4512441.

Owed (3av): the re-pin of every #19 cite to 54e869b by the map, the
map's section 5 statements, W151 OBS (5), W147's open OBS, fold-map.md.
New open item: O23. O22 stays open.

Lane: openRepoProject-4
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant