Repository navigation
Archive prefer-triad-in-project-new after PR #8 landed - #13
Merged
Merged
Conversation
Lane: openRepoProject-1 Ticks tasks 3.1 to 3.3 and 3.5 with their evidence, syncs the project-command spec from the change's delta (one modified and six added requirements, 47 scenarios), and moves the change to openspec/changes/archive/. Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Reviewer's GuideThis PR archives the completed prefer-triad-in-project-new change and synchronizes project-command/spec.md with the realized Triad-first creation flow, including interactive selection, safety checks, delegation, single-repository advisories, and workflow ordering; validation passes with no code changes. Flow diagram for the Triad-first project creation workflowflowchart TD
A[Start project creation] --> B[Interactive Triad selection]
B --> C[Safety checks]
C --> D[Delegate project creation]
D --> E[Single-repository advisory]
E --> F[Continue workflow in specified order]
File-Level Changes
Possibly linked issues
Tips and commandsInteracting with Sourcery
Customizing Your ExperienceAccess your dashboard to:
Getting Help
|
|
brettheap
marked this pull request as ready for review
October 8, 2026 23:51
|
Sorry @brettheap, you've used your own review budget of 250,000 diff characters for the last 7 days. You can request another review in 20 hours and 11 minutes by commenting |
brettheap
added a commit
that referenced
this pull request
Oct 9, 2026
V12 (AE-4) after merging origin/main at 7a9134b (e21b24d): - Dependencies and Sequencing: PR #8 merged at d7f6b0e (141 lines in project, tests 43 to 94) and PR #13's archive of prefer-triad-in-project-new merged at 7a9134b; "archive in either order" and "whichever lands second" replaced by those facts. - Citations stay pinned at da33d92: at 7a9134b lines 285-1007 of project sit 141 lower (probe and execute unmoved), the cited test lines 383 lower, README citations up to 88 lower; feature 003 re-pins at its specify and plan. - Capabilities, project-command: all ten requirements at 7a9134b accounted for. "Inspect and diagnose" and "Explicit maintenance" (MODIFIED) are verbatim and unchanged, 22 lines lower; "Delegate project creation", "Distribution and compatibility" and the six requirements the archive added are listed untouched, verbatim. - Impact: 94 existing tests; 002 merged by PR #8. - Why: the defects still hold at 7a9134b. Corrections C1: main is no longer da33d92. - Lead ruling (lane 3's final read of #12): the 1 MiB cap on the manifest read that resolves a merge target lives in the shared evidence model (What Changes; project-command ADDED; Git-first; a test). P6-1 confirmed already present (reap waits the 2 s grace, then abandons the child as probe-timeout). Lane: openRepoProject-2 Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap
added a commit
that referenced
this pull request
Oct 9, 2026
…erview Brings in PR #13 (7a9134b), which archived prefer-triad-in-project-new and merged its requirements into openspec/specs/project-command. Lane: openRepoProject-2 Co-Authored-By: Claude Opus 5.5 <[email protected]>
brettheap
added a commit
that referenced
this pull request
Oct 9, 2026
Applies lane openRepoProject-3's final delta read of PR #12 at a8cef41 (N-1 to N-6 and the two LOW items) and the lead's rulings P6-1 to P6-6: - N-1: unpublished on the merge-target checkout only where the ref listing holds a remote copy of the merge target; no remote is ordinary work (What Changes, Rules, requirement 10, OQ-20 and its table row). - N-2: requirement 3 states both scheduling conditions, the identity-probe barrier and the DI:446-448 rank condition, "earlier in canonical order". - N-3: requirement 7's messages name the batch's row cap and target limit and take the numbers from change 1's limits at run time. - N-4: requirement 3 states the overview's own per-child budget, min(5 s, deadline - now). - N-5 and P6-5: unstarted-branch mirrored where head equals the merge-target SHA (finding kept, read-only suggestion, gate code set); the zero-commit sentence dropped. - N-6 and P6-6: unsupported-layout is severity error; main-worktree-missing stays a warning. - P6-1 (reap within the 2 s grace or abandon as probe-timeout), P6-2 (fixed remedies for every gate code), P6-3 (withheld versus limited), P6-4 (limits gains batch_row_cap, report_row_cap, target_limit). - LOW: "change 1's codes, with target-cap carrying its deferral meaning"; the 1 MiB manifest bound is cited from change 1's evidence model. Also records PR #13 (7a9134b) in Dependencies and Impact: the canonical project-command at 7a9134b is the base change 1 modifies. Lane: openRepoProject-2 Co-Authored-By: Claude Opus 5.5 <[email protected]>
This was referenced Oct 9, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.



Lane: openRepoProject-1
Archives OpenSpec change
prefer-triad-in-project-new(governance PR #5 at ca4c615, ratified "ratify 5"; realization PR #8 at d7f6b0e, ratified "ratify 8"; issue #3 closed), per its tasks.md 3.5, after 3.1 to 3.3 were met (workBenches#145 opened for lane project-command; the merge sha posted on issue #3 for codeXfactory-5). 3.4 stays with codeXfactory-5.openspec/specs/project-command/spec.mdtakes the delta: "Delegate project creation" replaced, six requirements added, 47 scenario headings from the delta now in the main spec; the other requirements are unchanged.openspec/changes/archive/2026-10-08-prefer-triad-in-project-new/, carrying the whole change with tasks 3.1 to 3.3 and 3.5 ticked with evidence.openspec validate --all --strict: Totals: 5 passed, 0 failed (5 items). Test suite in py-bench: 94 tests OK (no code change).Squash merge on Brett Heap's word only.
🤖 Generated with Claude Code
Summary by Sourcery
Archive the completed project-creation change after synchronizing its Triad preference, prompting, confirmation, obstacle handling, and single-repository advisory requirements into the project-command specification.
Enhancements:
Chores: