Repository navigation
Description
Lane: openRepoProject-5
Governing issue for a new OpenSpec change, add-project-overview-remote-merge-status, proposed on Brett Heap's word "usage reset, resume all. read handoff and resume and fan out wide and do as much as possible in parallel" (2026-10-11), which lanes openRepoProject-4 and openRepoProject-5 read as a go for the candidate list they had put to him, lane 5 taking the project-maintenance design packet's separately governed extensions (ideation/brainstorm/next-session-project-maintenance-fix-handoff.md:47-50 at da33d92). If that reading is wrong, closing this issue ends the change. Refs #6, the record of the packet.
Problem
The overview and the cleanup use local refs only, as of the last fetch, so a branch merged on GitHub by squash, or merged after its upstream was deleted, is shown as unmerged or merely remote-gone with no explanation, and the person has to open GitHub to learn why a row is kept. The packet names project overview --remote as the later interface and fixes its boundary (project-maintenance-project-discovery.md:1036-1060 at da33d92): opt-in and read-only; the query identity derived from a validated canonical GitHub remote with URL credentials never printed or forwarded; requests deduplicated by host, repository and exact feature-head SHA; at most 64 requests, four at a time, 5 s each, inside a 30 s remote budget that is part of the 60 s deadline; one page of at most 100 items and at most 1 MiB per body; every rate limit, 401, 403, timeout, truncation or further page an explicit unknown; expiry cancels queued and in-flight requests; local ancestry remains the only cleanup gate. The ratified overview change leaves this to "a remote-queries proposal" and does not adopt the sketch (openspec/changes/add-project-overview/proposal.md:558-580). The closed PR #2's commit 09af8c8 is the harvest source; it queried GitHub from plain clean and doctor with no opt-in, no caps, inside the revalidation signature, and added ladder classes, and Copilot's upstream-gone and target-worktree threads (3989411854, 3989411802) were open at the close.
Intended scope (for the proposal to settle)
An opt-in project overview --remote that reports exact-head pull-request evidence per row under the packet's boundary, as informational fields in the versioned envelope and the human report, never as a finding code, an eligibility input, a plan digest input or a revalidation input; clean, status and doctor stay local-only.
Out of scope unless the proposal argues otherwise
Any network use by clean, status or doctor; a no-network comparison against the target's remote-tracking ref (a candidate for its own small change); persistent remote caching; squash-merge equivalence as a removal proof; cache disposal and paired branch retirement (their own changes).
Sibling search
No open issue, PR, branch or active OpenSpec change covers this surface (searched for "remote", "GitHub", "pull request", "--remote", "merge status"). add-project-overview (#10, PR #12) and add-project-clean-all-safe (#9, PR #11, draft PR #19) are lane openRepoProject-2's; this change is written against their delta text and archives after change 2. Draft PR #16 (lane 3) revises the packet; citations here pin da33d92. #20 (lane 1) touches project new only. PR #2 (closed) is the harvest source and is not reopened.
Activity
brettheap commentedon Oct 11, 2026
CLAIMED — lane openRepoProject-5, session 01e99fe7-bec0-4838-8159-eae2b41ad4ea@Eagle, 2026-10-11T16:37:20Z, for #25
Logged in
lanes/log/openRepoProject-5.mdatf1afa5ce3020ddcfcf893968884e75b9141eb42e.The three reads (lane-collision-protocol Rule 1):
Record lane openRepoProject-4's agreement on the reworded overview ex…
Spec 005: fold the packet-fidelity and runtime cross-check findings (…
Spec 005: correct Q2-Q15 from four reviews; add Q16 (D1's signal-bloc…
Spec 005: fold lane 3's delta findings D1-D12 (004 fails closed on du…
Spec 005: correct the questions after lane 3's delta read (M1-M6, L1-L9)
Spec 005: Dependencies name Q16's reach into #25 and #24's re-copy be…
Spec 005: fold lane 3's R3-2 to R3-4 and R3-9, align Q16's #25 trigge…
Spec 005: fold lane 3's R4 and R5 findings (Q17's divergence in every…
Spec 005: feature 004 at 6ae927f (lane G's follow-up built), and lane…
Spec 005: re-pin to feature 004 at 96a08d4, #24 at ca34644 and #25 at 1…
Spec 005: Q17 D names what #25's credential clause allows (lane 3's R…
Spec 005: re-pin #24 to fe5b245 and #25 to 129a4e2 (final heads)
Spec 005: Q17 D states #25's credential clause in full (lane 3's R10)…
Spec 005: Q17 D carries #25's credential restrictions in full (R10 fo…
Spec 005: re-pin #25 to its final head 05a424a; Q17 D states #25's bo…
Spec 005: re-check against feature 004 (2cf34d3) and #25 (e11d755); R…
Spec 005: align with A1 revision 3 (367223a); FR-045's path line; #25 …
Spec 005: align with A1 revision 5 (3ee860c); FR-032's R-124 wording;…
Spec 005 commit 3h: A1 revision 7; lane 3's W29 L2 and L3; #19 round …
Spec 005 commit 3i: #24 re-checked at #27's round B10 (d4e960b)
Spec 005 commit 3r: #24 at #27's round B14 (69cb7a1) and #25 at #29's…
Spec 005 commit 3u: #25 at #29's C18 (e1a9f84); #19's round (f) at 66…
Spec 005 commit 3v: #24 at #27's B15 (8d34525); #19's round (g) at 4f…
Spec 005 commit 3w: #19's rounds (g2) and (g3); #25 at #29's C19 and …
Spec 005 commit 3x: #19's round (h) (Brett Heap's 15:24Z ruling); #25 …
Spec 005 commit 3z: #19's round (i) (e0c91bb); lane 3's W77 L1, L2 an…
Spec 005 commit 3am (part 1 of 2): O17-O20 open; W130's MEDIUM and LO…