Skip to content

chore: Record upstream feast-dev/feast master as merged (no file changes) - #281

Merged
jyejare merged 5 commits into
opendatahub-io:masterfrom
patelchaitany:sync-record-upstream-2026-11-05
Nov 5, 2026
Merged

jyejare merged 5 commits into
opendatahub-io:masterfrom
patelchaitany:sync-record-upstream-2026-11-05

Conversation

@patelchaitany

Copy link
Copy Markdown

What

One merge commit that changes no files. It records upstream feast-dev/feast master (e0eb36993) as merged into ODH master.

Why

The upstream sync in #276 was squash-merged. A squash keeps the code but drops the link to the upstream commits. So the scheduled sync job thinks those 4 upstream commits are still unmerged, merges them again, and fails on the same .secrets.baseline conflict every run.

All the upstream code is already in master. This commit only restores the history link (git merge -s ours), so the next sync job starts from e0eb36993.

⚠️ How to merge

Please merge with "Create a merge commit", or let tide merge it after /lgtm. Do not squash. Squashing would drop the link again, and the sync job would keep failing.

Tested

  • git diff origin/master HEAD: 0 files changed.
  • Ran the sync job's git merge upstream/master on top of this commit: Already up to date. On master without this commit, it gives CONFLICT (content): Merge conflict in .secrets.baseline.

SIDDHESH1564 and others added 5 commits November 4, 2026 04:32
* feat: Add Pinecone online store integration
Signed-off-by: Siddhesh Khairnar <[email protected]>

* fix: Align Pinecone store with filters API and operator types

Signed-off-by: Siddhesh Khairnar <[email protected]>

* test: Expand Pinecone online store unit test coverage

Signed-off-by: Siddhesh Khairnar <[email protected]>

* fix: Address Pinecone online store review feedback

Signed-off-by: Siddhesh Khairnar <[email protected]>

* ci: Retrigger CI after flaky macOS dependency download

Signed-off-by: Siddhesh Khairnar <[email protected]>

* fix: Resolve rebase conflicts keeping chronon and pinecone

Signed-off-by: Siddhesh Khairnar <[email protected]>

* fix: Prevent protobuf downgrade breaking grpc health checks

Signed-off-by: Siddhesh Khairnar <[email protected]>

* fix: Revert protobuf pin that broke flink and pixi lock

Keep uv --no-sync for CI so hashed protobuf 7.x is preserved without
conflicting with feast[flink].

Signed-off-by: Siddhesh Khairnar <[email protected]>

---------

Signed-off-by: Siddhesh Khairnar <[email protected]>
…east-dev#7098)

Several Args entries named a parameter the function does not have.
Rename them to the actual parameter or drop them, and update the
DecisionEvaluator example, which passed a DecisionStrategy that the
constructor does not accept.

Signed-off-by: mmporong <[email protected]>
Co-authored-by: Shuchu Han <[email protected]>
…ev#7102)

Bumps [minimatch](https://github.com/isaacs/minimatch) from 10.2.6 to 11.0.1.
- [Changelog](https://github.com/isaacs/minimatch/blob/main/changelog.md)
- [Commits](isaacs/minimatch@v10.2.6...v11.0.1)

---
updated-dependencies:
- dependency-name: minimatch
  dependency-version: 11.0.1
  dependency-type: direct:development
...

Signed-off-by: dependabot[bot] <[email protected]>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
The upstream sync in feast-dev#276 was squash-merged, so ODH master lost its
link to upstream e0eb369. The scheduled sync job then merges the same
upstream commits again and hits the same .secrets.baseline conflict.

This merge uses the "ours" strategy, so no files change. It only
records upstream e0eb369 as merged, so the next sync job starts
from there.

Signed-off-by: Chaitany Patel <[email protected]>
@coderabbitai

coderabbitai Bot commented Nov 5, 2026

Copy link
Copy Markdown

Important

  • Trigger review

This repository does not receive automatic reviews because it has fewer than 10 stars.

Run configuration

  • Source mode: Auto
  • Repository: Unavailable
  • Branch: Unavailable
  • File: No configuration file from this repository applied
  • Commit: Unavailable
  • Layers: Central YAML (base), Organization UI (inherited)
  • Review profile: CHILL
  • Plan: Advanced
  • Run ID: e6a1d911-08ae-454c-9802-6773fe4974c4

@openshift-ci

openshift-ci Bot commented Nov 5, 2026

Copy link
Copy Markdown

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: jyejare, patelchaitany

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@jyejare
jyejare merged commit 92bfe58 into opendatahub-io:master Nov 5, 2026
23 of 34 checks passed
@rhods-ci-bot

Copy link
Copy Markdown

/early-gate-build

jyejare pushed a commit that referenced this pull request Nov 5, 2026
The upstream sync in #276 and the record-only fix in #281 were both
squash-merged, so ODH master still has no link to upstream e0eb369.
The scheduled sync job then merges the same upstream commits again and
hits the same .secrets.baseline conflict.

This merge uses the "ours" strategy, so no files change. It only
records upstream e0eb369 as merged, so the next sync job starts
from there. It must land as a merge commit; a squash drops the link.

Signed-off-by: Chaitany Patel <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

6 participants