Repository navigation
Description
What issue are you seeing?
Dot prematurely treats an ongoing report-review responsibility as complete after preparing a draft, despite accepting instructions to continue comparing and reviewing candidates before next-day delivery.
I asked it to work on the report alongside its other work and explicitly told it not to settle on a conclusion too early. Dot acknowledged that the next day was the delivery deadline, not the time to start working.
It subsequently reported that it had stopped reviewing because it considered the draft complete. Repeated user prompts were needed to discover this and restart the work.
Observed on October 2–3, 2026. All times below are Asia/Seoul (UTC+09:00). Excerpts are translated from Korean:
- October 2, 17:48: “I went into standby after finishing the initial comparison and counterargument review.”
- October 2, 21:57: “I had been waiting for almost two hours.”
- October 3, 08:43: “I treated last night’s draft as final and stopped improving it.”
What steps can reproduce the bug?
Observed workflow; a fresh minimal reproduction has not been run:
- Assign Dot a research report for next-day delivery, with instructions to keep comparing and reviewing candidates and avoid finalizing too early.
- Dot accepts the responsibility and acknowledges that work should begin before the delivery deadline.
- Dot prepares an initial draft and stops further review.
- Ask about progress. Dot reports that it had considered the draft complete and gone into standby, then promises to resume.
What is the expected behavior?
An interim draft should not automatically settle an explicitly ongoing review responsibility.
Dot should continue actionable review work, or clearly explain why further work is unnecessary or blocked. If it pauses with work remaining, it should preserve that responsibility and make the resumption conditions clear.
Additional information
Dot also retrospectively reported receiving hourly scheduled prompts but returning to standby during several runs. This is an assistant-reported observation; server execution logs were not independently verified.
Related: #49883 concerns follow-up on delegated Mac tasks after completion or an approval blocker. This report focuses on premature completion of an ongoing report-review responsibility. A shared underlying cause remains possible.
Activity
github-actions commentedon Oct 3, 2026
Potential duplicates detected. Please review them and close your issue if it is a duplicate.
Powered by Codex Action
pvillavi commentedon Oct 11, 2026
I’m seeing a similar failure with dot in a multi-step production and QA workflow on October 10–11, 2026.
I explicitly asked dot to coordinate a queue of work autonomously, use independent reviews, track corrections and artifacts, and keep iterating until the acceptance criteria were met, including overnight if needed. Hourly reports had an evening cutoff; that cutoff applied to reporting, while production was supposed to continue.
The next morning, I found no meaningful overnight progress. From my perspective, roughly ten hours had been lost. That is an approximate user-observed gap, not a duration established from execution logs.
The same pattern keeps happening during the day. I repeatedly have to tell dot to continue, coordinate the workers, check finished work, and resume the next step, despite already having authorized that workflow. A partial worker result or a recoverable interruption too often leaves the overall assignment without follow-through.
This is a serious reliability failure. Delegation requires constant babysitting, and status messages or promises to continue do not establish sustained execution.
Expected: preserve pending obligations across intermediate results, check them against the acceptance criteria, and take the next authorized step. If a real blocker or permission requirement prevents that, surface it promptly and clearly. I’m reporting the observed behavior; I haven’t established whether it has the same technical cause as this issue.
antoniointini commentedon Oct 19, 2026
Adding my experience as a Windows user: Your dot stops too easily, and I end up having to supervise it and ask it to continue instead of being able to rely on the autonomy that is the main appeal of the feature. This makes delegation feel like another task for me to manage.
The concern in this issue—stopping while the broader assignment still needs follow-through—is important to me. I am reporting my overall experience, not claiming to have reproduced the specific report-review scenario or established its technical cause.
Could the OpenAI team share whether a correction for premature stopping is planned or in progress? Is there an estimated timeframe or target release? I would like unfinished work to remain active until the requested outcome is delivered or a genuine blocker is clearly reported.
lvollmer commentedon Nov 9, 2026
I'm also experiencing all of these issues, and they are remarkably similar. I have a support ticket in showing one conversation where I had to nudge the agent to continue work 33 times over the course of two hours . Read that: 33.
If I have to babysit AI to make sure it's following the instructions I spent time creating for it, AI is useless. I too have lost hours of overnight work time because of this.