Repository navigation
test: remove blanket protocol <=29 known-failure skip and add interop tests - #2694
Merged
Merged
Conversation
… tests Remove the blanket skip for upstream→oc daemon transfers at protocol <=29 from is_known_failure(). Legacy protocol codecs are now fully wired. Add dry-run push tests for protocols 28, 29, and 30 alongside existing 31 and 32 tests.
oferchen
added a commit
that referenced
this pull request
Mar 15, 2026
…wn failures Two issues caused all interop tests to fail: 1. build_capability_string(!is_sender) was inverted - is_sender means "daemon is sender" (pull), so !is_sender is true for push, which incorrectly enabled INC_RECURSE for push and disabled it for pull. Fix: use is_sender directly (matches pre-PR#2693 behavior). 2. PR #2694 prematurely removed several entries from KNOWN_FAILURES and the protocol 28/29 blanket skip. Restore the blanket skip for forced protocol 28/29 tests and re-add oc:acls, oc:xattrs, up:acls, up:xattrs which depend on upstream daemon build configuration.
3 tasks
oferchen
added a commit
that referenced
this pull request
Mar 15, 2026
Re-add 6 known failure entries that were prematurely removed: - oc:dry-run, oc:itemize, oc:files-from (client push) - up:relative, up:itemize, up:hardlinks-relative (daemon receive) These were present at the last green CI (commit b1f3d7c) but removed in PR #2694, causing 36 unexpected failures across all protocol versions.
1 task
oferchen
added a commit
that referenced
this pull request
Mar 15, 2026
…ures fix: restore interop known failures removed by PR #2694
oferchen
added a commit
that referenced
this pull request
May 1, 2026
… tests (#2694) Remove the blanket skip for upstream→oc daemon transfers at protocol <=29 from is_known_failure(). Legacy protocol codecs are now fully wired. Add dry-run push tests for protocols 28, 29, and 30 alongside existing 31 and 32 tests.
oferchen
added a commit
that referenced
this pull request
May 1, 2026
…wn failures Two issues caused all interop tests to fail: 1. build_capability_string(!is_sender) was inverted - is_sender means "daemon is sender" (pull), so !is_sender is true for push, which incorrectly enabled INC_RECURSE for push and disabled it for pull. Fix: use is_sender directly (matches pre-PR#2693 behavior). 2. PR #2694 prematurely removed several entries from KNOWN_FAILURES and the protocol 28/29 blanket skip. Restore the blanket skip for forced protocol 28/29 tests and re-add oc:acls, oc:xattrs, up:acls, up:xattrs which depend on upstream daemon build configuration.
oferchen
added a commit
that referenced
this pull request
May 1, 2026
Re-add 6 known failure entries that were prematurely removed: - oc:dry-run, oc:itemize, oc:files-from (client push) - up:relative, up:itemize, up:hardlinks-relative (daemon receive) These were present at the last green CI (commit e5c9f3e) but removed in PR #2694, causing 36 unexpected failures across all protocol versions.
oferchen
added a commit
that referenced
this pull request
May 1, 2026
…ures fix: restore interop known failures removed by PR #2694
oferchen
added a commit
that referenced
this pull request
May 5, 2026
… tests (#2694) Remove the blanket skip for upstream→oc daemon transfers at protocol <=29 from is_known_failure(). Legacy protocol codecs are now fully wired. Add dry-run push tests for protocols 28, 29, and 30 alongside existing 31 and 32 tests.
oferchen
added a commit
that referenced
this pull request
May 5, 2026
…wn failures Two issues caused all interop tests to fail: 1. build_capability_string(!is_sender) was inverted - is_sender means "daemon is sender" (pull), so !is_sender is true for push, which incorrectly enabled INC_RECURSE for push and disabled it for pull. Fix: use is_sender directly (matches pre-PR#2693 behavior). 2. PR #2694 prematurely removed several entries from KNOWN_FAILURES and the protocol 28/29 blanket skip. Restore the blanket skip for forced protocol 28/29 tests and re-add oc:acls, oc:xattrs, up:acls, up:xattrs which depend on upstream daemon build configuration.
oferchen
added a commit
that referenced
this pull request
May 5, 2026
Re-add 6 known failure entries that were prematurely removed: - oc:dry-run, oc:itemize, oc:files-from (client push) - up:relative, up:itemize, up:hardlinks-relative (daemon receive) These were present at the last green CI (commit 9adacad) but removed in PR #2694, causing 36 unexpected failures across all protocol versions.
oferchen
added a commit
that referenced
this pull request
May 5, 2026
…ures fix: restore interop known failures removed by PR #2694
8 tasks
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
protocol <= 29known-failure skip fromis_known_failure()in interop testsTest plan