Skip to content

test: remove blanket protocol <=29 known-failure skip and add interop tests - #2694

Merged
oferchen merged 1 commit into
masterfrom
test/proto28-29-interop
Mar 14, 2026
Merged

oferchen merged 1 commit into
masterfrom
test/proto28-29-interop

Conversation

@oferchen

Copy link
Copy Markdown
Owner

Summary

  • Remove blanket protocol <= 29 known-failure skip from is_known_failure() in interop tests
  • Add dry-run push daemon tests for protocols 28, 29, and 30
  • Legacy protocol codecs are now fully implemented

Test plan

  • CI interop tests pass at protocol 28/29 without blanket skip
  • New daemon dry-run push tests pass for protocols 28, 29, 30

… tests

Remove the blanket skip for upstream→oc daemon transfers at protocol <=29
from is_known_failure(). Legacy protocol codecs are now fully wired.

Add dry-run push tests for protocols 28, 29, and 30 alongside existing
31 and 32 tests.
@github-actions github-actions Bot added the test label Mar 14, 2026
@oferchen
oferchen merged commit 14b3912 into master Mar 14, 2026
28 of 38 checks passed
@oferchen
oferchen deleted the test/proto28-29-interop branch March 14, 2026 15:12
oferchen added a commit that referenced this pull request Mar 15, 2026
…wn failures

Two issues caused all interop tests to fail:

1. build_capability_string(!is_sender) was inverted - is_sender means
   "daemon is sender" (pull), so !is_sender is true for push, which
   incorrectly enabled INC_RECURSE for push and disabled it for pull.
   Fix: use is_sender directly (matches pre-PR#2693 behavior).

2. PR #2694 prematurely removed several entries from KNOWN_FAILURES and
   the protocol 28/29 blanket skip. Restore the blanket skip for forced
   protocol 28/29 tests and re-add oc:acls, oc:xattrs, up:acls, up:xattrs
   which depend on upstream daemon build configuration.
oferchen added a commit that referenced this pull request Mar 15, 2026
Re-add 6 known failure entries that were prematurely removed:
- oc:dry-run, oc:itemize, oc:files-from (client push)
- up:relative, up:itemize, up:hardlinks-relative (daemon receive)

These were present at the last green CI (commit b1f3d7c) but
removed in PR #2694, causing 36 unexpected failures across all
protocol versions.
oferchen added a commit that referenced this pull request Mar 15, 2026
…ures

fix: restore interop known failures removed by PR #2694
oferchen added a commit that referenced this pull request May 1, 2026
… tests (#2694)

Remove the blanket skip for upstream→oc daemon transfers at protocol <=29
from is_known_failure(). Legacy protocol codecs are now fully wired.

Add dry-run push tests for protocols 28, 29, and 30 alongside existing
31 and 32 tests.
oferchen added a commit that referenced this pull request May 1, 2026
…wn failures

Two issues caused all interop tests to fail:

1. build_capability_string(!is_sender) was inverted - is_sender means
   "daemon is sender" (pull), so !is_sender is true for push, which
   incorrectly enabled INC_RECURSE for push and disabled it for pull.
   Fix: use is_sender directly (matches pre-PR#2693 behavior).

2. PR #2694 prematurely removed several entries from KNOWN_FAILURES and
   the protocol 28/29 blanket skip. Restore the blanket skip for forced
   protocol 28/29 tests and re-add oc:acls, oc:xattrs, up:acls, up:xattrs
   which depend on upstream daemon build configuration.
oferchen added a commit that referenced this pull request May 1, 2026
Re-add 6 known failure entries that were prematurely removed:
- oc:dry-run, oc:itemize, oc:files-from (client push)
- up:relative, up:itemize, up:hardlinks-relative (daemon receive)

These were present at the last green CI (commit e5c9f3e) but
removed in PR #2694, causing 36 unexpected failures across all
protocol versions.
oferchen added a commit that referenced this pull request May 1, 2026
…ures

fix: restore interop known failures removed by PR #2694
oferchen added a commit that referenced this pull request May 5, 2026
… tests (#2694)

Remove the blanket skip for upstream→oc daemon transfers at protocol <=29
from is_known_failure(). Legacy protocol codecs are now fully wired.

Add dry-run push tests for protocols 28, 29, and 30 alongside existing
31 and 32 tests.
oferchen added a commit that referenced this pull request May 5, 2026
…wn failures

Two issues caused all interop tests to fail:

1. build_capability_string(!is_sender) was inverted - is_sender means
   "daemon is sender" (pull), so !is_sender is true for push, which
   incorrectly enabled INC_RECURSE for push and disabled it for pull.
   Fix: use is_sender directly (matches pre-PR#2693 behavior).

2. PR #2694 prematurely removed several entries from KNOWN_FAILURES and
   the protocol 28/29 blanket skip. Restore the blanket skip for forced
   protocol 28/29 tests and re-add oc:acls, oc:xattrs, up:acls, up:xattrs
   which depend on upstream daemon build configuration.
oferchen added a commit that referenced this pull request May 5, 2026
Re-add 6 known failure entries that were prematurely removed:
- oc:dry-run, oc:itemize, oc:files-from (client push)
- up:relative, up:itemize, up:hardlinks-relative (daemon receive)

These were present at the last green CI (commit 9adacad) but
removed in PR #2694, causing 36 unexpected failures across all
protocol versions.
oferchen added a commit that referenced this pull request May 5, 2026
…ures

fix: restore interop known failures removed by PR #2694
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant