Repository navigation
[Sync] Update project files from source repository (cad9c92) - #194
Merged
mrz1836 merged 1 commit intoOct 20, 2026
Merged
Conversation
Contributor
Code Coverage Analysis🟢 Overall Coverage: 92.0% Project coverage remains at 92.0% (3.3K/3.6K statements) Changes: 2 config files Coverage Metrics
Coverage Breakdown
ResourcesGenerated via go-coverage • 2026-10-20 20:49:37 UTC |
github-actions
Bot
deleted the
chore/sync-files-go-pre-commit-20261020-204410-cad9c92
branch
October 20, 2026 20:53
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What Changed
GOVULNCHECK_GO_VERSION:1.27.2→1.27.3(.github/env/00-core.env)pull-request-management.ymlworkflow now also triggers onsynchronizefor same-repo PRs, so the "🔧 PR Management (Same Repo)" job reports a check on every new head commit.synchronizeruns, the label-application and default-assignee steps are skipped. The step summary reports "None: new commits only" instead of the usual actions list.synchronizeruns use a separate-pushconcurrency group, so a push right after a PR opens cannot cancel the run that labels it. A newer push still cancels an older push's run. The header and trigger comments were updated to document this.Why It Was Necessary
openedrun. Thesynchronizerun therefore does no work, which preserves maintainers' manual label overrides.pull_requestruns skip the same-repo job, which satisfies a required check. The fork management job still fires only on opened, reopened, ready_for_review and closed.Testing Performed
if:conditions on the label and assignee steps excludesynchronize, and that the concurrency group expression appends-pushonly for that action.synchronize, while theclosedand other actions keep their existing handling.Impact / Risk
synchronizepath performs no label or assignee changes, so existing PR metadata is not altered by pushes.synchronizeruns andopened-type runs do not cancel each other.