Repository navigation
Commit c811170
[doc](catalog) P7.4 sub-batch A DONE (per-table scan-provider seam) + decompose cutover into 6 sub-batches + refresh HANDOFF
Land the cutover scope map (P7-cutover-scope-map-2026-07-06.md, from the 6-agent
recon wf_536a2968-2c8): the "cutover" is not a compact flip but the entire P7 tail
decomposed into sub-batches A-F (multi-format dispatch seam / iceberg-on-HMS
delegation / hudi live cutover / event pipeline / DLA+write retype / flip+delete).
Land sub-batch A design doc (P7.4-scan-provider-per-table-seam-design.md), marked
DONE for commit 0923077. Refresh HANDOFF: current state = A done + dormant,
next = sub-batch B (iceberg-on-HMS delegation), with the delete-order constraint and
each sub-batch's deferred user decisions recorded.
Refs: apache#65185
Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
Claude-Session: https://claude.ai/code/session_01SLdLbpKSfgh6AvzaKBFfRT1 parent 823ee07 commit c811170
3 files changed
Lines changed: 135 additions & 44 deletions
File tree
- plan-doc
- tasks
0 commit comments