Skip to content

[release] Move milestone maintenance to repository-owned PowerShell - #4908

Merged
mattleibow merged 1 commit into
mainfrom
mattleibow-milestone-maintenance-split
Sep 1, 2026
Merged

mattleibow merged 1 commit into
mainfrom
mattleibow-milestone-maintenance-split

Conversation

@mattleibow

Copy link
Copy Markdown
Contributor

Description

Moves release milestone maintenance out of the core publishing PR into a focused dependent change. It replaces the skill's Python implementation with repository-owned PowerShell for shipped-assignment reconciliation, Chromium-derived milestone dates, rollover, and closure. Both entry points are read-only by default and require -Push for GitHub mutations.

Related issues

Related to #4889

Required skia PR

None.

Areas affected

  • Managed API (binding/)
  • Native / C API (externals/skia/src/c, include/c)
  • Generated P/Invoke bindings
  • Native dependency or Skia update (libpng, HarfBuzz, FreeType, zlib, milestone bump, …)
  • Views & integrations (MAUI, Uno, WPF, WinUI, Blazor, …)
  • Rendering output / visual behavior
  • Performance
  • Tests
  • Build, packaging, or CI
  • Documentation or samples

Changes

None — release-maintenance automation only; no public API or runtime behavior changes.

Testing

  • Parsed every publishing PowerShell file and validated full help for all release entry points.
  • Ran Test-PublishingScripts.ps1: 69 passed.
  • Ran Test-ReleaseMilestones.ps1: 25 passed.
  • Ran cache dependency coverage validation: all tracked files covered.
  • Ran live read-only reconciliation for 4.151.0: one assignment planned, 103 already correct, no mutation.
  • Ran live read-only milestone maintenance: zero creates, updates, or closures planned.
  • No rendering changes; screenshots are not applicable.

Checklist

  • Tests added or updated (if omitted, explain why above)
  • Changes above lists all public API and behavioral changes (or "None.")
  • New/changed public API? Filed a docs issue in mono/SkiaSharp-API-docs so reference docs can be written later
  • Native change? Companion mono/skia PR linked above and bindings regenerated

@github-actions

github-actions Bot commented Sep 1, 2026

Copy link
Copy Markdown
Contributor

📦 Try the packages from this PR

Warning

Do not run these scripts without first reviewing the code in this PR.

Step 1 — Download the packages

bash / macOS / Linux:

curl -fsSL https://raw.githubusercontent.com/mono/SkiaSharp/main/scripts/get-skiasharp-pr.sh | bash -s -- 4908

PowerShell / Windows:

iex "& { $(irm https://raw.githubusercontent.com/mono/SkiaSharp/main/scripts/get-skiasharp-pr.ps1) } 4908"

Step 2 — Add the local NuGet source

dotnet nuget add source ~/.skiasharp/hives/pr-4908/packages --name skiasharp-pr-4908
More options
Option Description
--successful-only / -SuccessfulOnly Only use successful builds
--force / -Force Overwrite previously downloaded packages
--list / -List List available artifacts without downloading
--build-id ID / -BuildId ID Download from a specific build

Or download manually from Azure Pipelines — look for the nuget artifact on the build for this PR.

Remove the source when you're done:

dotnet nuget remove source skiasharp-pr-4908

@mattleibow

Copy link
Copy Markdown
Contributor Author
[release] Move milestone maintenance to PowerShell (#4908)

Requires: https://github.com/mono/SkiaSharp/pull/4889

Replace the skill-local Python implementation with repository-owned PowerShell
entry points and a thin dispatch workflow. Keep release assignment
reconciliation separate from schedule advancement, and make both operations
read-only unless a maintainer explicitly supplies `-Push`.

~~ Shipped release assignments ~~

Release assignments need to follow the release where a change actually shipped,
rather than the first branch on which it was planned. The reconciler orders the
release branches for one numeric line, accepts only exact public tags as shipped
boundaries, and rolls an unshipped preview or RC forward to the next shipped
milestone.

It finds the most recent earlier stable tag, compares each shipped tag from its
merge base, and reads first-parent subjects ending in `(#N)`. GitHub closing
references and closing keywords in the pull request body add linked issues.
Missing tags, boundaries, or milestones remain warnings in a dry run and become
hard blockers with `-Push`, so incomplete release evidence cannot write
assignments.

Every mutation uses the shared guarded GitHub helper and is verified after a
push. A live read-only run for 4.151.0 identified #4480 for 4.151.0-rc.1 and
found 103 assignments already correct without changing GitHub state.

~~ Milestone schedule and closure ~~

Milestone dates need to stay aligned with Chromium while shipped milestones
must not close over unfinished work. The updater reads the repository major and
Skia milestone, maps the six Chromium schedule fields to preview.1, preview.2,
RC, and stable dates and descriptions, and maintains three milestone cycles by
default. Missing historical entries more than 30 days past due are not
recreated.

An open milestone is eligible for closure only when its exact release tag
exists. Open work moves to the next unshipped open or planned milestone; a
missing destination blocks closure. Push mode synchronizes milestone metadata
first, verifies each move, waits for the old milestone to empty, rejects newly
arrived items, then closes the milestone and verifies its final state.

The dispatch validates its selected operations, requires a version for
reconciliation, serializes milestone runs, and leaves push disabled by default.
The release-tooling gate parses every publishing script, validates entry-point
help, and runs 69 publishing plus 25 focused milestone checks. A live read-only
schedule run planned no creates, updates, or closures.

Co-authored-by: Copilot App <[email protected]>

@github-actions

github-actions Bot commented Sep 1, 2026 •

Copy link
Copy Markdown
Contributor

📊 SkiaSharp benchmarks — PR #4908

No ⭐ source-build (pr) benchmark results were produced for this run, so there is nothing to compare yet. The source-build legs are best-effort and may be skipped (native unchanged) or may have failed — see the run for details.

📈 View the benchmark run & perf-dashboard artifact →

Base automatically changed from mattleibow-release-tooling-inventory to main September 1, 2026 11:32
mattleibow added a commit that referenced this pull request Sep 1, 2026
…4889)

[release] Move publishing automation to repository-owned PowerShell (#4889)

Requires: #4895
Context: #4908

Replace the Python runtimes behind the release-branch, release-publish, and
release-status skills, together with the milestones issue-template updater, with
three repository-owned PowerShell entry points under scripts/infra/publishing.
Internal builds, tests, signing, BAR promotion, and NuGet.org publication stay
in the team-owned pipeline; the repository owns only branch preparation, public
GitHub finalization, and issue-form maintenance. The release-branch and
release-publish skills remain as guidance over the scripts, while release-status
and its pipeline-status.py runtime are deleted because pipeline monitoring
belongs to the team pipeline. Reviewed Release summaries, smoke testing,
milestone maintenance, and dnceng observer or feed alignment are deliberately
outside this layer.

~~ Release branch preparation ~~

Add Release - Prepare and prepare-release.ps1 around an explicit base and exact
preview, RC, stable, or hotfix identity. The base must carry the requested
three-part SkiaSharp version or the immediately preceding four-part hotfix; the
script requires SkiaSharp and HarfBuzzSharp to move together, checks the pinned
externals/skia gitlink, and creates matching mono/SkiaSharp and mono/skia
branches. Existing remote branches are authoritative: a matching ref is reused
and a conflicting one stops the run. A dry run prints copyable commands, -Apply
creates local branches and commits, and -Push performs remote writes.

A three-part stable cut changes only the release label, then opens a reviewable
pull request on a bump-version branch named for the next SkiaSharp patch, moving
the selected maintenance line to that patch and the next HarfBuzzSharp revision
at preview.0. That PR targets an existing, manually created release/X.Y.x
servicing branch when present; otherwise it targets main. Preparation never
creates the optional servicing branch. A four-part hotfix must advance the base
by exactly one revision and increments HarfBuzzSharp with it.

A rare hotfix from an older base can reuse a HarfBuzzSharp revision that a newer
line already published because allocation is relative to the selected base, not
global publication history. Maintainers must check that case manually; a global
allocator was deliberately deferred.

~~ Public release finalization ~~

Add Release - Finish and finish-release.ps1 for packages already public on
NuGet.org. An abbreviated preview or RC identity is accepted only when it
resolves to one public SkiaSharp package version. The script reads the source
branch and commit from that exact nuspec, warns when the recorded branch and
version identity disagree, and uses the recorded commit as the authority. It
creates or verifies the immutable exact-version tag and publishes a normal
GitHub-generated Release in one -Push run. A matching draft is published rather
than replaced; an already published Release is accepted by tag and prerelease
identity.

After publication, Finish dispatches release-note generation for that version;
stable releases also dispatch the issue-template update with push enabled.
Package publication, pipeline monitoring, draft-body formatting, and summary
ownership leave this layer. PR #4895 owns reviewed Release summaries, while
milestone maintenance and optional smoke testing remain focused upper layers.

~~ Issue-template version maintenance ~~

Port update-bug-template.py to update-bug-template.ps1 and simplify Sync - Issue
Template Versions around it. Rebuild the version and goodversion dropdowns from
published, non-draft GitHub Releases while preserving unrelated YAML. Read-only,
local -Apply, and automation-branch -Push modes are supported. Scheduled daily
runs push, maintain one owned pull request, reuse identical branch content, and
refresh an existing automation branch only with an explicit force-with-lease.
Removing the old milestones directory also moves its cache input to
scripts/infra/publishing.

~~ Shared command safety and regression tests ~~

Route Git and GitHub execution through Git.Common.psm1, GitHub.Common.psm1, and
Publishing.Common.psm1 so production entry points do not invoke git or gh
directly. The modules run Git from an explicit repository root, retry transient
GitHub reads three times with backoff, print skipped mutations as copyable
commands that name their -Push guard, and verify relevant remote state after
writes.

Release - Tooling Tests runs the PowerShell harness on pull requests, main
pushes, and manual dispatch. The mutating workflows require the default branch,
keep mutation inputs false by default, and reject simultaneous -Apply and -Push
where both modes exist. Tests cover mode isolation, direct git and gh invocation
guards, package/version transforms, hotfix progression, guarded branch pushes,
release identity, issue-form rendering, force-with-lease usage, and
automation-branch reuse.

Co-authored-by: Matthew Leibowitz <[email protected]>
Co-authored-by: Copilot App <[email protected]>
Replace the release-milestones Python tooling with repository-owned PowerShell scripts for assignment reconciliation, Chromium-derived schedule updates, rollover, and closure. Keep operations read-only by default, add the dispatch workflow and focused tests, and document the maintainer flow.

Co-authored-by: Copilot App <[email protected]>

Copilot-Session: 560df585-3d3f-40d1-9690-9c095fd09b94
@mattleibow
mattleibow force-pushed the mattleibow-milestone-maintenance-split branch from 3eb67cc to 33be7b2 Compare September 1, 2026 11:39
@mattleibow
mattleibow merged commit 6057924 into main Sep 1, 2026
84 of 89 checks passed
@mattleibow
mattleibow deleted the mattleibow-milestone-maintenance-split branch September 1, 2026 12:07
@github-actions

github-actions Bot commented Sep 1, 2026

Copy link
Copy Markdown
Contributor

📖 Documentation Preview

The documentation for this PR has been deployed and is available at:

🔗 View Staging Site
🔗 View Staging Docs
🔗 View Staging Gallery (Blazor)
🔗 View Staging Gallery (Uno Platform)
🔗 View Staging SkiaFiddle

This preview will be updated automatically when you push new commits to this PR.


This comment is automatically updated by the documentation staging workflow.

mattleibow added a commit that referenced this pull request Sep 1, 2026
[release] Move milestone maintenance to PowerShell (#4908)

Requires: #4889

Replace the skill-local Python implementation with repository-owned PowerShell
entry points and a thin dispatch workflow. Keep release assignment
reconciliation separate from schedule advancement, and make both operations
read-only unless a maintainer explicitly supplies `-Push`.

~~ Shipped release assignments ~~

Release assignments need to follow the release where a change actually shipped,
rather than the first branch on which it was planned. The reconciler orders the
release branches for one numeric line, accepts only exact public tags as shipped
boundaries, and rolls an unshipped preview or RC forward to the next shipped
milestone.

It finds the most recent earlier stable tag, compares each shipped tag from its
merge base, and reads first-parent subjects ending in `(#N)`. GitHub closing
references and closing keywords in the pull request body add linked issues.
Missing tags, boundaries, or milestones remain warnings in a dry run and become
hard blockers with `-Push`, so incomplete release evidence cannot write
assignments.

Every mutation uses the shared guarded GitHub helper and is verified after a
push. A live read-only run for 4.151.0 identified #4480 for 4.151.0-rc.1 and
found 103 assignments already correct without changing GitHub state.

~~ Milestone schedule and closure ~~

Milestone dates need to stay aligned with Chromium while shipped milestones
must not close over unfinished work. The updater reads the repository major and
Skia milestone, maps the six Chromium schedule fields to preview.1, preview.2,
RC, and stable dates and descriptions, and maintains three milestone cycles by
default. Missing historical entries more than 30 days past due are not
recreated.

An open milestone is eligible for closure only when its exact release tag
exists. Open work moves to the next unshipped open or planned milestone; a
missing destination blocks closure. Push mode synchronizes milestone metadata
first, verifies each move, waits for the old milestone to empty, rejects newly
arrived items, then closes the milestone and verifies its final state.

The dispatch validates its selected operations, requires a version for
reconciliation, serializes milestone runs, and leaves push disabled by default.
The release-tooling gate parses every publishing script, validates entry-point
help, and runs 69 publishing plus 25 focused milestone checks. A live read-only
schedule run planned no creates, updates, or closures.

Co-authored-by: Copilot App <[email protected]>
@github-actions

github-actions Bot commented Sep 1, 2026

Copy link
Copy Markdown
Contributor

📦 Artifact size report

Packages from this PR (build 1576514) vs the latest nightly baseline 4.152.0-nightly.47 (observed 2026-09-01).

Total .nupkg size: 569.6 MB → 569.2 MB (−422.1 KB, -0.1%)

Packages

⚠️ marks growth over 500.0 KB or 2%. Changes under 50.0 KB are treated as noise.

Package baseline this PR Δ Δ%
SkiaSharp.NativeAssets.WinUI 109.1 MB 108.5 MB 🟢 −577.1 KB -0.5%
SkiaSharp.NativeAssets.WebAssembly 69.7 MB 69.7 MB 🔴 +84.9 KB +0.1%

+39 package(s) unchanged (< 50.0 KB).

Per-file changes

SkiaSharp.NativeAssets.WinUI

File Size
runtimes/win-arm64/native/libGLESv2.pdb 64.5 MB → 64.4 MB (🟢 −96.0 KB)
runtimes/win-x64/native/libGLESv2.pdb 66.6 MB → 66.6 MB (🟢 −80.0 KB)
runtimes/win-x86/native/libGLESv2.pdb 67.3 MB → 67.2 MB (🟢 −80.0 KB)

Informational only — this never blocks the PR. Native binaries are labelled by os/arch.

mattleibow added a commit that referenced this pull request Sep 1, 2026
Three independent drafting runs against #4912 itself exercised the new rules
on live evidence. Two of the three joined an eval-rebuild clause to the fact
that #4908 needed no corrections, producing "rebuild the evals ... while
retaining #4908 as a compact control". Both halves are true and the join is
not: #4908 is a control case study in the audit, while the compact control is
an eval fixture that never references it.

The source invites the merge. This PR's own description uses "control case"
for the unchanged review and for the compact eval a few paragraphs apart, and
that is the ordinary situation rather than a special one. Baseline, fixture,
and config carry the same hazard whenever a PR's evidence names two things by
one role word.

The mixed-truth check already covered the symptom but described only a fact
joined to an unsupported qualifier, which does not prompt anyone to ask which
of two same-named things a clause is about. Extend it to name that case, so
the check fires while the sentence is being written rather than after a
reviewer notices the join.

A rerun after the change kept the two apart, describing #4908 as an unchanged
review in the overview and the compact control as one of the seven eval cases,
with the other fifteen ground-truth checks still passing.

Co-authored-by: Matthew Leibowitz <[email protected]>
Co-authored-by: Copilot App <[email protected]>
mattleibow added a commit that referenced this pull request Sep 1, 2026
[skills] Close pr-commit-message gaps found in release reviews (#4912)

Context: #4889
Context: #4895
Context: #4907
Context: #4908
Context: #4910

Turn corrections from five completed release-message reviews into durable
pr-commit-message rules, then replace conclusion-led evals with cases that
exercise those decisions. Keep #4908 as an unchanged reviewed-message control;
it is distinct from the synthetic compact-message eval fixture.

~~ Durable topic boundaries ~~

The #4889 draft distributed shared command-safety guarantees among consumer
sections and under-described the deleted release-status runtime. Treat a shared
guard, mechanism, or contract as its own topic when its consumers do not own
its guarantee. A removal remains with its parent topic, but must preserve the
departing component's name, the behavior that left, and its new home.

Name sections for the problem or decision rather than a component, lead the
overview with the governing design, and require sibling sections to carry
comparable evidence. This preserves both the shared safety contract corrected
in #4889 and the regression-coverage sentence restored to #4895.

~~ Immediate dependency relationships ~~

The #4907 and #4910 drafts labelled an earlier stack ancestor as required even
though each change built on a nearer parent. Define `Requires:` as the immediate
companion or dependency that must land first; earlier ancestors provide
`Context:` instead. Candidate references still have to be opened and classified
by their actual entity and relationship before they are included.

~~ Complete and current evidence scopes ~~

The #4889 review disproved "every workflow is one manual job" because the
sampled family also contained scheduled and CI-only workflows. Require a family
to be enumerated along the generalized dimension, and narrow a quantified claim
when any member is a counterexample.

State coverage in the predicates that tests or guards actually assert rather
than the broader capability they suggest. Re-read counts and measurements at
the current head so later pushes cannot leave a once-correct number in the
message; #4910's tracked-file and nightly figures both changed during review.

~~ Configuration and migration intent ~~

Add configuration or policy splits and removals to the change-specific content
rules. Each configuration must identify its context, value, and reason for
remaining different, while a migration must identify the removed component and
where its responsibility moved. This records #4910's build-feed versus
public-package boundary instead of inviting a future maintainer to unify the
sources and invalidate publication verification.

~~ Concrete guarantees and lasting rationale ~~

Replace safety adjectives with the operation that cannot occur and the
neighboring system it cannot affect. That distinction preserves #4895's marker
ownership and #4907's rule that release testing neither publishes packages nor
changes BAR state.

Keep durable limitations, but discard scope-negotiation phrases such as
"excluded by request" or "out of scope for review size". Those phrases describe
development chronology and stop being true when a follow-up lands, as the #4910
review demonstrated.

~~ Facts that share a role word ~~

Three drafts of this PR joined two true facts into a false relationship because
both objects were called a control. #4908 is the prior release-message review
that needed no correction; `control-single-topic-compact` is a synthetic eval
for an unrelated design-time-detection change.

Extend the mixed-truth check to distinguish objects called control, baseline,
fixture, or config before joining clauses about them. A rerun then kept the two
controls separate while preserving the other fifteen ground-truth checks.

~~ Source-backed, copy-ready attribution ~~

Two eval runs found output defects independent of message prose: one invented a
Copilot noreply trailer without evidence, and another placed a valid trailer
outside the fence where it would not be copied into the commit. Accept an email
only from relevant commit authors, co-author trailers, or a non-null user email;
house-style trailers are not evidence.

Put every verified trailer inside the fenced commit message after a blank line.
Only a missing-context notice for a contributing human whose email cannot be
verified remains outside the fence.

~~ Evals that discriminate judgement ~~

The original eval pass scored 33/35 for the revision and 32/35 for the baseline,
inside run-to-run noise. Its prompts supplied conclusions, numbered notes gave
away topic counts, and one assertion hard-coded a section count; both graders
identified the assertions as non-discriminating.

Replace those cases with seven raw-evidence scenarios containing the stale
claims that caused the real review corrections: a contradicted workflow
universal, the wrong stack dependency, an unsafe configuration unification,
stale measurements, shared guarantees, attribution evidence, and a compact
single-topic control.

The rebuilt suite scored 39/41 for the revised skill and 36/41 for the baseline,
with no case regressing and wins on immediate dependencies, shared-mechanism
placement, and concrete safety claims. The universal and coverage rules were
already handled by both configurations, so they remain defensive rules rather
than measured wins. Trailer-sensitive reruns passed every assertion after the
output-contract fixes.

Co-authored-by: Matthew Leibowitz <[email protected]>
Co-authored-by: Copilot App <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Status: Done

Development

Successfully merging this pull request may close these issues.

2 participants