Skip to content

chore(sequentialthinking): rollup of v2.3.0 PRs (integration proof, not for merge) #198

chore(sequentialthinking): rollup of v2.3.0 PRs (integration proof, not for merge)

chore(sequentialthinking): rollup of v2.3.0 PRs (integration proof, not for merge) #198

Triggered via pull request October 29, 2026 00:50
Status Success
Total duration 45s
Artifacts 1

everything-mcp-diff.yml

on: pull_request
Diff Everything Server Interface
32s
Diff Everything Server Interface
Report the dispatched run as pending
Report the dispatched run as pending
Post the diff on the PR
7s
Post the diff on the PR
Report the dispatched run's result
0s
Report the dispatched run's result
Fit to window
Zoom out
Zoom in

Annotations

2 notices
Diff Everything Server Interface
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Post the diff on the PR
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"

Artifacts

Produced during runtime
Name Size Digest
mcp-diff-report
612 Bytes
sha256:1571778b033b88f226ab1cbdb9e7d84145dccc25aca419e519f0b3b93c1c5cb2