Repository navigation
Prepare staging workload identities for usage jobs - #1911
Merged
Merged
Conversation
rdimitrov
added a commit
that referenced
this pull request
Nov 23, 2026
Switch the two staging CronJobs to their separate, short-lived GKE credentials after preparation in #1911. The collector reads project logs and the backup uses the existing usage-history repository. Keep the shared key, Secret and IAM grants through scheduled-run verification. Merge after the prepared worker, both permission probes, refreshed plan and CI have passed.
This branch was previously deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Prepare staging for the usage credential migration from #1909. Enable the GKE workload pool and worker metadata server, and provision separate Kubernetes service accounts and IAM grants. Both scheduled jobs continue using their current credential during this phase.
The worker update is planned for the staging maintenance window. Verify the refreshed preview, worker readiness, registry health, and both permission probes before advancing to cutover.