Repository navigation
Separate the usage collector and backup identities in stages - #1909
Merged
Merged
Conversation
rdimitrov
added a commit
that referenced
this pull request
Nov 23, 2026
Prepare staging for the usage credential migration from #1909. Enable the GKE workload pool and worker metadata server, and provision separate Kubernetes service accounts and IAM grants. Both scheduled jobs continue using their current credential during this phase. The worker update is planned for the staging maintenance window. Verify the refreshed preview, worker readiness, registry health, and both permission probes before advancing to cutover.
This branch was previously deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Give the collector project log access and the backup object access on its own bucket through distinct GKE workload identities. The default stack configuration retains both existing jobs and their credentials. Preparation, cutover, and key retirement are separate stack changes. Key retirement verifies that scheduled jobs succeeded under the new identities. The backup requires the existing repository to open after cutover. Deployment and collector tests passed locally.