Skip to content

Iteration Plan for August 2017 #32043

Closed
Closed

Description

@kieferrm

This plan captures our work in August. This is a 4 week iteration. We will ship early September. The main focus remains the same as last iteration's: We continue pushing on #396 "Multi-folder workspaces", this is our roadmap #28344.

As in July, our team will operate with slightly reduced capacity. Being on the Northern Hemisphere means Summer is upon us and so, at any given time, a few of us will be busy recharging with friends and families. If you mention somebody in an issue and you don't hear anything for a couple of days, just picture them hanging out on the beach 🏖️ or skiing in New Zealand ⛷️.

Endgame

  • August 29th: Code freeze for the endgame
  • Sept 1th: Endgame done

The endgame details for this iteration are tracked in #33215.

Plan Items

Below is a summary of the top level plan items.

Legend of annotations:

Mark Description
🏃 work in progress 
✋ blocked task
💪 stretch goal for this iteration 
🔵 more details required
🔴 missing issue reference

Workbench

Multi-folder workspaces #28344 (feature request #396) Benjamin Pasero (@bpasero) Daniel Imms (@Tyriar) @ team

Editor

Monaco Editor

Debug

Protocol

Terminal

SCM

Tasks

Languages

Multi-root folder support

Language Server Support (vscode-languageclient, vscode-languageserver)

HTML

JavaScript/TypeScript

Extensions

API

Extension Contributions

Engineering Items

Documentation

Exploration


Deferred


Activity

  1. added
    iteration-plan-draft
    on Aug 4, 2017
  2. ghiscoding commented on Aug 9, 2017

    @ghiscoding

    Kai Maetzel (@kieferrm) did you forget add the milestone or is it intentional?
    I like seeing these plans directly in the milestone :)

    BTW, I know that the multi-folder workspaces is currently the biggest focus, however I'm curious to know when should we expect more cleanup/polish of the minimap? I'd really like to see a better integration of the Git Status inside the minimap.

  3. changed the title [-]Iteration Plan for August 2017 - DRAFT[/-] [+]Iteration Plan for August 2017[/+] on Aug 14, 2017
  4. added
    iteration-plan
    and removed
    iteration-plan-draft
    on Aug 14, 2017
  5. tobyee commented on Aug 21, 2017

    @tobyee

    As polishing terminal, I perfer this way #9353 to support creating new terminal which has more scalability.
    Multiple type terminal support is useful while there are different style between terminals, such as git bash and cmd.

  6. Tyriar commented on Aug 21, 2017

    @Tyriar
    Contributor
  7. egamma commented on Sep 8, 2017

    @egamma
    Member

    Closing - 1.16 has shipped

  8. locked and limited conversation to collaborators on Nov 17, 2017
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Labels

iteration-plan

Type

No type

Projects

No projects

    Milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions