Repository navigation
feat(webkit): roll to r2327 #17728
tests_secondary.yml
on: pull_request
Driver
12m 31s
Android
58m 0s
Matrix: test-package-installations-other-node-versions
Matrix: test_chromium_channels
Matrix: test_clock_frozen_time_test_runner
Matrix: test_electron
Matrix: test_mac
Matrix: Windows
Matrix: tracing_linux
Annotations
6 errors and 2 notices
|
Electron - ubuntu-latest
Process completed with exit code 1.
|
|
Electron - macos-latest
Process completed with exit code 1.
|
|
macos-15-xlarge (firefox)
Process completed with exit code 1.
|
|
Installation Test ubuntu-latest (20)
The job has exceeded the maximum execution time of 30m0s
|
|
Installation Test ubuntu-latest (20)
The operation was canceled.
|
|
macos-15-large (firefox)
Process completed with exit code 1.
|
|
Electron - macos-latest
The macos-latest label will migrate to macOS 26 beginning June 15, 2026. For more information see https://github.com/actions/runner-images/issues/14167
|
|
Test chrome on macos-latest
The macos-latest label will migrate to macOS 26 beginning June 15, 2026. For more information see https://github.com/actions/runner-images/issues/14167
|