Repository navigation
[placeholder] ci: require the promise-obligation receipts gate on PRs - #4265
Closed
Daniel Meppiel (danielmeppiel) wants to merge 1 commit into
Closed
Daniel Meppiel (danielmeppiel) wants to merge 1 commit into
Daniel Meppiel (danielmeppiel) wants to merge 1 commit into
Conversation
P-7 commits land here after T1 (#4142) is on main. Co-authored-by: Copilot App <[email protected]>
Contributor
There was a problem hiding this comment.
Copilot wasn't able to review any files in this pull request. Check if the Files changed in this pull request are included in default exclusions.
5 of 10 tasks
Collaborator
Author
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Description
DRAFT placeholder for P-7: the receipts gate. It makes
tests/quality/test_promise_obligations.pya required PR check, run against a shrink-only baseline of residual obligation cells, with a REAL negative control in CI. Removing one receipt must fail the gate, and that run's link will be recorded here.The content lands after T1 (#4142, the receipts plugin and family core) is on main. The prepared work lives on
p1-receipts-gateand will be rebased here as P-7-only commits.Issue and approved scope
Issue: Refs #4122 (placeholder; the closing keyword is added when the P-7 content lands)
Human scope-approval comment: the #4122 apm-scope:v1 record (posted 2026-11-20).
Does this PR complete the issue, or what remains? It will complete #4122 once the content lands. Today it is a placeholder.
Type of change
Testing
Changelog
## [Unreleased]inCHANGELOG.md: user-visible effect first, 25 words or fewer, ending with(#PR); breaking changes only under upgrade notes; no Highlights; see.github/instructions/changelog.instructions.md.Spec conformance (OpenAPM v0.1)