Skip to content

ci(a11y): a first run takes a fourth audit leg when that finishes every owed audit, and deferrals name audits-at-head - #13722

Merged
cixzhang merged 4 commits into
mainfrom
ci/audits-fourth-leg
Nov 24, 2026
Merged

cixzhang merged 4 commits into
mainfrom
ci/audits-fourth-leg

Conversation

@cixzhang

@cixzhang cixzhang commented Nov 24, 2026 •

Copy link
Copy Markdown
Contributor

Who this helps

Authors and lanes whose change owes a little more accessibility-audit time than a first CI run fits. Today such a run runs what fits into three legs of ten minutes and defers the rest. Its notice then says "Re-run all jobs at this head", which repeats the whole run (63 jobs) for a few audits.

On #11916 that happened twice today, at heads 9b9f6ae and 7626829:

  • Attempt 1: each was fully green (63 jobs, 381–387 runner-minutes, 22–24 minutes wall). It ran 29 of 32 owed audit spec files and deferred 3, which is 261 s of recorded time.
  • Attempt 2: each re-ran everything to run those 3: about 383 runner-minutes over 24 minutes at 9b9f6ae, and about 375 over 49 minutes at 7626829.

What changes

  • A fourth leg when it finishes the audits (a11y-dependent-audits.mjs):
    • When a first run cannot fit every owed audit into three legs, but four legs within the leg budget run them all, it takes the fourth leg (COMPLETING_MAX_LEGS = 4), and its record is complete.
    • When four legs do not fit, nothing changes: the run fits what it can into three legs and defers the rest.
  • The deferral notice points at the cheap path:
    • The warning and the job summary now name the audits-at-head dispatch for this head, with the exact command: gh workflow run audits-at-head.yml -R <repo> -f pr=<n> -f head=<sha>. They no longer say "Re-run all jobs". The plan step passes PR_NUMBER for it.
    • The dispatch runs only the audits the change owes, at that head.
    • It runs every owed audit there, not only the deferred ones, because merge-guard needs a complete record at the head.
  • AST-030 FR12 says the first run may take a fourth leg when that finishes every owed audit, and that the notice names the main-only dispatch. Its verification row names the new cases. The comments in ci.yml match.

merge-guard accepts an audits-at-head record at the head

merge-guard's dependent-audit check first reads the CI run's record. If that record is not complete, it reads the newest successful audits-at-head dispatch titled for this pull request and exact head. It checks the dispatch record's pr, head and source, and accepts it when complete is true. Measured on run 44793252028 (pull request #13094): 14 jobs, about 21 runner-minutes, 15 minutes wall.

Measured over the last week (11-17 → 11-24)

Merged pull requests 704
Merged pull requests that needed a re-run for deferred audits 0: every later-attempt record at a merged head owed at most 8 audits, and replaying the first-run plan defers nothing
First runs that deferred audits 5 runs, on 3 pull requests: #11916 three times, and two release interaction checks
Re-runs of all jobs only for deferred audits 2, both #11916 today: about 383 and 375 runner-minutes (24 and 49 minutes wall)
What this change would do for those runs #11916's 32-owed plan fits four legs (longest 9.8 min): no re-run. #13070's and #13127's 58-owed plans (11-20, 30 deferred) are release interaction checks whose file list GitHub truncated. Their scope is undecided, so they keep the split message, and this change does not affect them

A fourth leg costs about 5 runner-minutes (today's legs ran 4–7 minutes), against about 375–383 for a re-run.

Tests

Red-first, in a11y-dependent-audits.test.mjs:

  • A 32-owed plan, which three legs of ten minutes cannot hold, gets four legs on a first run. Its longest leg is within the budget, and its record is complete.
  • A 58-owed plan still defers on a first run, in at most three legs.
  • The deferral notice and summary give the audits-at-head command for the pull request and head, and do not say "Re-run all jobs". The notice counts the files that did not run, and says that four legs cannot hold every owed audit.
  • The plan step passes PR_NUMBER and the head.

The existing five-audit case still defers: four legs cannot hold five seven-minute audits. Every .github/scripts/ci-*.test.mjs suite, the planner suite and the audits-at-head suite pass (1,169 tests). pnpm check:knowledge passes. Quick preflight passes, typecheck included, on a Linux build box.

CI impact

CI impact: a first run that would have deferred audits a fourth leg can finish runs one more dependent-audit leg (about 5 runner-minutes), and skips a later re-run of all jobs (about 375–383 runner-minutes). Runs that owe no audit, or whose audits fit three legs, are unchanged. No required-check name changes. Repository tooling only: no Changeset.

Owning session: noopbot (a61f66c2), under CI & Release (ca77f950). Land path: the drain's serial merge loop, on green, CodeBunny approval and Specs' exact-head /approve-spec.

…ry owed audit

A first run that could not fit every owed dependent audit into three legs deferred the rest to a full re-run of all jobs at the same head. On #11916 that re-ran 63 jobs (about 383 runner-minutes) twice for 3 audits of 261 s. The planner now takes a fourth leg when every owed audit then fits the leg budget, and still defers when it does not. Its deferral notice and summary now point at the audits-at-head dispatch for that head, with the exact command, instead of a re-run of all jobs: it runs only the owed audits there, and merge-guard accepts its record. AST-030 FR12 says so.
@meta-cla meta-cla Bot added the CLA Signed This label is managed by the Meta Open Source bot. label Nov 24, 2026
@github-actions github-actions Bot added the needs:spec-owner-review Current knowledge records await owner approval label Nov 24, 2026
@cixzhang

Copy link
Copy Markdown
Contributor Author

/approve-spec 9d3df7c

@astracat-bot

astracat-bot Bot commented Nov 24, 2026 •

Copy link
Copy Markdown
Contributor

AI review status for this pull request.

Review status Updated
🟢 Reviewed (for maintainers only) Nov 24, 2026, 1:29 PM UTC

@github-actions github-actions Bot removed the needs:spec-owner-review Current knowledge records await owner approval label Nov 24, 2026
@github-actions

github-actions Bot commented Nov 24, 2026 •

Copy link
Copy Markdown
Contributor

PR Analysis Report

🔎 Preview · d27e4fe

Storybook · Sandbox · built from this PR's head

Package size: no published package changed; no new dependencies.

Not run on this PR: add ci:run-visual for Visual, ci:run-a11y for Accessibility, ci:run-rtl for RTL.

CI impact: −0.3 job-min per update · pool −0.1% · time to green −0.8 min · standard runners · 2 CI action or script files changed (not measured)
Before After Change
Job-minutes per PR update 228.8 228.5 −0.3
Runner pool, runner-minutes a day 54,880 54,814 −66 (−0.1%)
Average concurrent jobs 38.1 38.1 0
Time to green (median → this run) 23.3 min 22.4 min −0.8 min
Runs a day 240 240 0

Changed jobs: a11y-dependent-audits-plan changed: standard

Not measured (the jobs that use these keep their recent minutes above): .github/scripts/a11y-dependent-audits.mjs, .github/scripts/a11y-dependent-audits.test.mjs.

Assumptions: before is each job's average over the last 20 pull-request runs; after keeps that for unchanged jobs and uses this run's minutes for added or changed ones, weighted by how often each changed job ran in those runs; runs a day averages the seven whole days before today; time to green compares this run with the median of those runs that ran the same jobs.


Generated by PR Enrichment workflow | View full report

@vercel

vercel Bot commented Nov 24, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
astryx Ready Ready Preview Nov 24, 2026 12:34pm UTC

Request Review

@github-actions github-actions Bot added the needs:spec-owner-review Current knowledge records await owner approval label Nov 24, 2026
@cixzhang

Copy link
Copy Markdown
Contributor Author

/approve-spec 3810c4e

@github-actions github-actions Bot removed the needs:spec-owner-review Current knowledge records await owner approval label Nov 24, 2026

@astracat-bot astracat-bot Bot left a comment •

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Changes requested: AST-030 FR12 still caps a first run at three legs in two places that the new fourth leg contradicts.

  • FR12's shared-primitive clause ("at most three legs, each at most 10 minutes", docs/specs/AST-030/spec.md line 256) and its planning verification row (a Button change that "plans more than three legs" fails, line 783) still cap a first run at three legs, while the amended DEC-25 and the planner (.github/scripts/a11y-dependent-audits.mjs lines 225-235) take a fourth leg for any owed set, primitive dependents included; extend both to the four-leg case.

The spec change is otherwise approved at this head, so after the fix an engineering owner (the author is one) re-approves the new head with /approve-spec <full head SHA>. Two non-blocking tidy-ups: planDependentAudits's JSDoc still describes only a three-leg first run, and one rewrapped comment line in .github/workflows/ci.yml (line 7660) runs to 104 characters. CI's full run on this head was still in progress at the time of review.

Claims and files checked

Review mode: full; reason: no-earlier-review

  • Claim: a first run that cannot fit every owed audit into three legs but can into four takes the fourth leg and records complete. Verified: planner lines 225-235; new 32-audit test.
  • Claim: when four legs do not fit, the run still fits what it can into three legs and defers the rest. Verified: planner lines 236-237; new 58-audit test.
  • Claim: the warning and the job summary name the audits-at-head dispatch with the exact command and no longer say "Re-run all jobs". Verified: planner lines 280-286, 394 and 422; new notice test.
  • Claim: the plan step passes the pull request number. Verified: ci.yml line 7621; workflow contract test.
  • Claim: the dispatch runs only the owed audits, every one of them, at that head. Verified: the dispatch runs main's planner over the pull request's changed files as a later run (audits-at-head.yml line 193).
  • Claim: merge-guard accepts a complete dispatch record for the exact head. Consistent with the current FR12 text and the dispatch workflow's header; merge-guard itself is outside this repository and unchanged here.
  • Claim: FR12 now allows the fourth leg and names the dispatch, its verification row names the new cases, and the ci.yml comments match. Partly false: FR12's shared-primitive clause and its planning row still say three legs (the blocking finding).
  • Claim: the cited dispatch run took 14 jobs, about 21 runner-minutes and 15 minutes. Verified: 14 jobs, 20.6 runner-minutes, 15.3 minutes.
  • Claim: on the motivating pull request, first runs at two heads were fully green (63 jobs, 381-387 runner-minutes, 22-24 minutes), and second attempts re-ran everything. Verified for both first runs (381 and 387 runner-minutes, 21.5 and 23.3 minutes) and the first head's re-run (383 runner-minutes, 24.4 minutes); the second head's re-run was still running. The 29-of-32 and 261-second detail was not checked.
  • Claim: week-long tallies (merged pull requests, deferring first runs, full re-runs). Not checked.
  • Claim: a fourth leg costs about 5 runner-minutes. Consistent with the recorded leg times; not measured at this head.
  • Claim: the new tests are red-first, and the existing five-audit case still defers. Verified by reading: the base lacks the new exports, and five seven-minute audits cannot fit four ten-minute legs.
  • Claim: the CI, planner and dispatch test suites, the knowledge check and the quick preflight pass. Not checked: CI's full run on this head was still in progress, and the toolchain could not be installed.
  • Claim: no required check name changes and no changeset is needed. Verified: only CI paths change, and the legs job's name and the test join are unchanged.
  • File .github/scripts/a11y-dependent-audits.mjs: clear, with a non-blocking JSDoc note.
  • File .github/scripts/a11y-dependent-audits.test.mjs: clear.
  • File .github/workflows/ci.yml: clear, with a non-blocking line-length note.
  • File docs/specs/AST-030/spec.md: blocking (FR12's leftover three-leg caps).

Automated review (maintainer link)

Comment thread docs/specs/AST-030/spec.md Resolved
Comment thread docs/specs/AST-030/spec.md Resolved
…the fourth first-run leg

CodeBunny review: two FR12 places still capped a first run at three legs. The planner's JSDoc names the fourth leg, and a rewrapped ci.yml comment fits the line length.
@github-actions github-actions Bot added the needs:spec-owner-review Current knowledge records await owner approval label Nov 24, 2026
@cixzhang

Copy link
Copy Markdown
Contributor Author

/approve-spec a6bb476

@github-actions github-actions Bot removed the needs:spec-owner-review Current knowledge records await owner approval label Nov 24, 2026

@astracat-bot astracat-bot Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Changes requested: one measurement in the description is wrong; the planner change, its tests and the AST-030 wording otherwise check out, and the spec change is approved at this head.

  • The description says each #11916 re-run took "about 383 runner-minutes, about 24 minutes", but the second head's re-run (CI run 45371630919, attempt 2) took about 375 runner-minutes over 49 minutes; correct it, for example to "about 375-383 runner-minutes, 24 and 49 minutes".

This needs only a description edit, no new commit. A non-blocking wording suggestion for the deferral warning is inline. CI has not run on this head yet because the pull request is a draft.

Claims and files checked

Review mode: full; reason: spec-record

  • Claim: a first run that cannot fit every owed audit into three legs but can into four takes the fourth leg and records complete. Verified: planner lines 226-236; new 32-audit test.
  • Claim: when four legs do not fit, the run still fits what it can into three legs and defers the rest. Verified: planner lines 237-238; new 58-audit test.
  • Claim: the warning and the job summary name the audits-at-head dispatch with the exact command and no longer say "Re-run all jobs". Verified: planner lines 281-287, 395 and 423; new notice test.
  • Claim: the plan step passes the pull request number. Verified: ci.yml line 7621; workflow contract test.
  • Claim: the dispatch runs only the owed audits, all of them, at that head. Verified: it runs main's planner over the pull request's changed files as a later run (audits-at-head.yml line 193).
  • Claim: merge-guard accepts a complete dispatch record that names the pull request, head and source. Consistent: the dispatch writes pr, head, source and complete, and current FR12 says merge-guard accepts it; merge-guard itself is not in this repository.
  • Claim: FR12 allows the fourth leg and names the dispatch, its verification rows name the new cases, and the ci.yml comments match. Verified: spec.md lines 256, 783-784 and 1429-1430; ci.yml lines 7539-7540, 7610-7614 and 7659-7663.
  • Claim: the motivating first runs were fully green, 63 jobs, 381-387 runner-minutes, 22-24 minutes. Verified: 63 successful jobs each, 381 and 387 runner-minutes, about 21.5 and 23 minutes.
  • Claim: each re-run took about 383 runner-minutes and about 24 minutes. False for the second head: 375 runner-minutes over 49 minutes (the blocking finding).
  • Claim: the first runs ran 29 of 32 owed audits and deferred 3 (261 s), and the 32-owed plan fits four legs. Partly verified: both re-runs, planned with up to six legs allowed, chose four; the 29, 261 s and 9.8-minute figures were not checked.
  • Claim: the cited dispatch run took 14 jobs, about 21 runner-minutes and 15 minutes. Verified.
  • Claim: 704 pull requests merged over the measured week. Verified for the seven days ending at 11:00 UTC today.
  • Claim: the other week tallies (re-runs needed, deferring first runs, the two 58-owed plans). Not checked.
  • Claim: a fourth leg costs about 5 runner-minutes. Consistent with the measured legs (4.3-6.8 minutes).
  • Claim: the new tests are red-first, and the existing five-audit case still defers. Verified by reading: the base lacks the new exports and PR_NUMBER, and five seven-minute audits cannot fit four ten-minute legs.
  • Claim: the CI, planner and dispatch suites, the knowledge check and the quick preflight pass. Not checked: CI skipped the draft head and the toolchain could not be installed.
  • Claim: no required check name changes and no changeset is needed. Verified: the legs job and test join names are unchanged and only CI paths change.
  • File .github/scripts/a11y-dependent-audits.mjs: clear, with a non-blocking wording note.
  • File .github/scripts/a11y-dependent-audits.test.mjs: clear.
  • File .github/workflows/ci.yml: clear.
  • File docs/specs/AST-030/spec.md: clear.

Automated review (maintainer link)

CodeBunny review: the count names the deferred files, while the four-leg test is on every owed audit, so 'N files do not fit four legs' could read as false.
@cixzhang

Copy link
Copy Markdown
Contributor Author

/approve-spec d27e4fe

@astracat-bot astracat-bot Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Changes requested: one row of the description's measured table is wrong; the planner change, its tests and the AST-030 wording check out, and the spec change is approved at this head.

  • Miss: the week table says "#13108's and #10424's 58-owed plans (11-20, 30 deferred) still defer, with the dispatch named", but on 11-20 #13108's runs owed no audit and #10424's owed one; the two 58-owed, 30-deferred first runs were #13070 and #13127, release interaction checks whose file list GitHub truncated at 3,000, so they take the undecided-scope path (planEverything in .github/scripts/a11y-dependent-audits.mjs) and keep the "split the PR" error instead of naming the dispatch; please correct that row, for example: "#13070's and #13127's 58-owed plans (11-20, 30 deferred) are release interaction checks whose file list GitHub truncated; their scope is undecided, so they keep the split message and this change does not affect them."

The earlier points are fixed: the second #11916 re-run now reads 375 runner-minutes over 49 minutes, and the deferral notice now says how many audits did not run and that four legs cannot hold every owed audit.

Claims and files checked

Review mode: incremental; reason: none

  • changed rules (0): none
  • Claim: #11916's two first runs were green, 63 jobs, about 381 to 387 runner-minutes and 22 to 24 minutes: verified (381.0 and 386.7 runner-minutes, 21.5 and 23.3 minutes).
  • Claim: each first run ran 29 of 32 owed audits and deferred 3, 261 s of recorded time: verified (plan job logs; the three audits' recorded times sum to 261.0 s).
  • Claim: each re-run repeated all jobs, about 383 runner-minutes over 24 minutes and 375 over 49 minutes: verified.
  • Claim: a first run takes a fourth leg when four legs within the budget run every owed audit, and otherwise plans as before: verified (a11y-dependent-audits.mjs:226-238; the 32-audit case plans three legs with 8 deferred on the base and four complete legs on the head).
  • Claim: the warning and job summary give the audits-at-head command for this pull request and head and no longer say "Re-run all jobs"; the plan step passes the pull request number: verified (:281-287, :395, :423, ci.yml:7621, tests at :315-330 and :411-415).
  • Claim: the dispatch runs every owed audit, and only those, at the head, from main: verified (audits-at-head.yml:56, :193).
  • Claim: FR12, its verification rows and the ci.yml comments describe the fourth leg and the dispatch: verified (spec.md:256, :783-784, :1429-1430).
  • Claim: merge-guard accepts a complete dispatch record for the exact pull request and head: consistent with the dispatch record's pr, head, source and complete fields (audits-at-head.yml:508-517) and with FR12; merge-guard's own code is not in this repository.
  • Claim: the measured dispatch took 14 jobs, about 21 runner-minutes and 15 minutes: verified (20.6 runner-minutes, 15.2 minutes).
  • Claim: 704 pull requests merged in the week: verified.
  • Claim: no merged pull request needed a re-run for deferred audits: not verified.
  • Claim: 5 first runs deferred audits, on 3 pull requests, and 2 re-runs happened, both on #11916: verified (#11916 three times, #13070, #13127).
  • Claim: #11916's 32-owed plan fits four legs, longest 9.8 minutes: verified (both re-runs planned four legs, longest 9.8 minutes).
  • Claim: #13108's and #10424's 58-owed plans still defer with the dispatch named: false (see above).
  • Claim: a fourth leg costs about 5 runner-minutes, as today's legs ran 4 to 7 minutes: verified (legs ran 4.3 to 6.8 minutes).
  • Claim: the new tests cover the 32-audit and 58-audit plans, the notice text and the plan step's inputs, and the five-audit case still defers: verified by reading the tests (:240-264, :266-283, :315-330, :411-415) and by running the planner on the same inputs.
  • Claim: 1,169 tests, pnpm check:knowledge and quick preflight pass: not verified (CI has not run on this draft head).
  • Claim: no required check name changes and no Changeset is needed: verified (job names unchanged; repository tooling only).
  • File .github/scripts/a11y-dependent-audits.mjs: clear.
  • File .github/scripts/a11y-dependent-audits.test.mjs: clear.
  • File .github/workflows/ci.yml: clear.
  • File docs/specs/AST-030/spec.md: clear (approved at this head).

Automated review (maintainer link)

@astracat-bot astracat-bot Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Approved pending CI: the heavy CI jobs have not run on this head yet.

The earlier point is fixed: the week table now describes #13070 and #13127 as release interaction checks whose truncated file list keeps the split message. The planner change, its tests and the AST-030 FR12 and DEC-25 wording check out, and the spec change is approved at this head.

Claims and files checked

Review mode: same-head; reason: none

  • changed rules (0): none
  • Claim: Two first runs on #11916 were green, 63 jobs, about 381 to 387 runner-minutes and 22 to 24 minutes: verified (381.0 and 386.7 runner-minutes; 21.5 and 23.3 minutes).
  • Claim: Each ran 29 of 32 owed audits and deferred 3, 261 s of recorded time: verified (the three deferred audits' recorded times sum to 261.0 s).
  • Claim: Each re-run repeated every job, about 383 runner-minutes over 24 minutes and 375 over 49 minutes: verified (the second re-run took 49.2 minutes).
  • Claim: The old notice told the author to re-run all jobs: verified (the removed notice line in a11y-dependent-audits.mjs).
  • Claim: A first run takes a fourth leg when four legs within the budget run every owed audit, and its record is complete; otherwise nothing changes: verified (a11y-dependent-audits.mjs:226-238; the planner on 32 and 58 seventy-second audits).
  • Claim: The warning and job summary give the dispatch command for this pull request and head and no longer say re-run all jobs; the plan step passes the pull request number: verified (:281-287, :395, :423, ci.yml:7621).
  • Claim: The dispatch runs every owed audit, and only those, at the head: verified (audits-at-head.yml:56, :193).
  • Claim: FR12, its verification rows and the ci.yml comments describe the fourth leg and the dispatch: verified (spec.md:256, :783-784, :1429-1430; ci.yml:7539-7540, :7610-7614, :7659-7663).
  • Claim: merge-guard accepts a complete dispatch record titled for the exact pull request and head after checking its pull request, head and source: consistent with the dispatch's run name and record fields (audits-at-head.yml:3-7, :13, :508-517) and FR12; merge-guard's own code is not in this repository.
  • Claim: The measured dispatch took 14 jobs, about 21 runner-minutes and 15 minutes: verified (20.6 runner-minutes, 15.2 minutes).
  • Claim: 704 pull requests merged in the week: verified for the rolling week that ends on the morning of 11-24.
  • Claim: No merged pull request needed a re-run for deferred audits, since every later-attempt record at a merged head owed at most 8 audits and its first-run replay defers nothing: verified (208 such records; at most 8 owed; no replay defers).
  • Claim: 5 first runs deferred audits, on 3 pull requests, and 2 re-runs happened, both on #11916: verified.
  • Claim: #11916's 32 owed audits fit four legs, longest 9.8 minutes: verified (the planner on that owed set: four legs, longest 9.76 minutes; three legs need 11.39).
  • Claim: #13070's and #13127's 58-owed plans are release interaction checks whose file list GitHub truncated, so they keep the split message: verified (3,029 and 3,489 changed files; planEverything and the split message are unchanged, :247-272, :299-306).
  • Claim: A fourth leg costs about 5 runner-minutes, as legs ran 4 to 7 minutes: verified (4.3 to 6.8 minutes).
  • Claim: The new tests cover the 32- and 58-audit plans, the notice text and the plan step's inputs, and the five-audit case still defers: verified (a11y-dependent-audits.test.mjs:240-264, :266-283, :315-330, :411-415; the base defers 8 of the 32).
  • Claim: 1,169 tests, the knowledge check and quick preflight pass: not verified (CI's heavy jobs have not run on this head).
  • Claim: No required check name changes, and no Changeset is needed: verified (job names unchanged; repository tooling only).
  • File .github/scripts/a11y-dependent-audits.mjs: clear.
  • File .github/scripts/a11y-dependent-audits.test.mjs: clear.
  • File .github/workflows/ci.yml: clear.
  • File docs/specs/AST-030/spec.md: clear (approved at this head).

Automated review (maintainer link)

@cixzhang
cixzhang marked this pull request as ready for review November 24, 2026 13:40
@cixzhang
cixzhang merged commit 6123087 into main Nov 24, 2026
156 checks passed
@github-actions
github-actions Bot deleted the ci/audits-fourth-leg branch November 25, 2026 06:04

This branch was successfully deployed

1 active deployment
Preview — d27e4fef Deployed Nov 24, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

CLA Signed This label is managed by the Meta Open Source bot.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant