Repository navigation
test(planning): eval cases for the interview's ship-it exit and wayfind trigger - #8098
Conversation
…nd trigger Refs #7365 Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
|
claude-security-review reviewed Security review of the incremental change since cf89a5d ( The change adds eval case 35 (JSON test data) and updates a comment and a digest pin in the shell test. It adds no executable logic, no new inputs reaching a shell, no credentials or tokens, and no workflow or permission changes. It deletes, narrows or softens no standing instruction. The eval case asserts that a deferred question stays |
|
claude-review reviewed No findings in the incremental change since cf89a5d (
I checked the roster hash and compared the case against |
|
The pr-unblock lane stopped on this pull request and needs a person: the merge stages a change under .github/workflows/, which the lane does not push.
To resume, deal with the reason above, remove the gh workflow run pr-unblock.yml -R melodic-software/claude-code-plugins -f pr-number=8098 -f activity=resolve-conflicts |
…sue-7365-39105815399-1 # Conflicts: # plugins/planning/skills/interview/evals/evals.json
|
Unattended merge: risk MED at head |
|
The pr-unblock lane stopped on this pull request and needs a person: the lane could not fix every failing check; its run log names each one and why.
To resume, deal with the reason above, remove the gh workflow run pr-unblock.yml -R melodic-software/claude-code-plugins -f pr-number=8098 -f activity=fix-ci |
Attended check, owner-approved: case 31 defers the open rows as USER-RESERVED on the user's ship-it and keeps the confirmation gate, and cases 32-34 grade only the wayfind recommendation and resolve no row, so none contradicts cases 15 or 16. Each gets its agreement line above the pin. Co-Authored-By: Claude Opus 5.5 <[email protected]>
A single-turn run stops at the Step 3 confirmation request, so it could not also write the Brief, pass the cross-check and hand off. The case now grades that the restatement says where Q3 and Q4 will go and that the turn ends at the confirmation request, keeping the gate it exists to protect. Co-Authored-By: Claude Opus 5.5 <[email protected]>
Owner decision (split): case 31 grades ship-it up to the confirmation request; case 35 starts after the user confirmed and grades the Brief's USER-RESERVED deferred rows, the --brief cross-check and the handoff, so #7365's first criterion is covered end to end, one turn per case. Attended check: case 35 agrees with cases 15 and 16; roster pin updated. Co-Authored-By: Claude Opus 5.5 <[email protected]>
Closes #7365
Summary
Opened by the work-resolve-issue lane. The run's own summary:
Not verified
Fix
Verification
The run reports:
Left out: the items under Not verified.
Related
#7365