Skip to content

chore(work-items): advance the listing-budget-watch schedule row - #13833

Merged
kyle-sexton merged 1 commit into
mainfrom
chore/13832-recheck-listing-budget
Nov 6, 2026
Merged

kyle-sexton merged 1 commit into
mainfrom
chore/13832-recheck-listing-budget

Conversation

@kyle-sexton

Copy link
Copy Markdown
Member

Closes #13832

Summary

This cycle's listing-budget watch is recorded on #13832 (cycle report): the aggregate is 138,705 chars over 268 skills, +41.0% since 2026-08-12. This PR advances the schedule row.

Fix

  • .github/recurring-schedule.json: in listing-budget-watch, last_checked becomes 2026-11-06 and next_due becomes 2027-02-04 (quarterly, 90 days).

Verification

  • jq reads the row back with both new dates.

Related

🤖 Generated with Claude Code

https://claude.ai/code/session_01RMa441b9qec43NvaTyiY2Z

@kyle-sexton
kyle-sexton marked this pull request as ready for review November 6, 2026 20:57
@chatgpt-codex-connector

Copy link
Copy Markdown
Codex Review Summary: ❌ Failed

This comment shows the latest Codex review activity on this pull request.

Review Status Commit Review trigger
📝 Code Review ❌ Failed 2026-11-06T20:57:29.219161Z
We couldn’t complete this review. Comment @codex review to try again.
695b9d6 Draft marked ready
ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review" or "@codex security review".

Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings.

@chatgpt-codex-connector

Copy link
Copy Markdown

You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard.

@github-actions

github-actions Bot commented Nov 6, 2026

Copy link
Copy Markdown
Contributor

claude-review reviewed 695b9d6c4a36d58dad3b9c6e2b652cc1cfa9ea1c: read 1 of 1 changed file(s); 0 finding(s), 0 as inline comments.

Code review: no findings

This PR changes one line pair in .github/recurring-schedule.json, which is on the trusted-path list, so I read the whole change and the row around it. In the listing-budget-watch row, last_checked moves from 2026-08-08 to 2026-11-06 and next_due moves from 2026-11-06 to 2027-02-04.

  • Correctness: 2026-11-06 plus 90 days is 2027-02-04. That fits the row's "cadence": "quarterly" and the 90-day gap the previous cycle used (2026-08-08 to 2026-11-06). The PR edits only the listing-budget-watch row. Other rows, such as stale-doc-drift-watch (also due 2026-11-06), are unchanged. The JSON structure is intact.
  • Closing issue [Maintenance] Listing-budget watch: report the shared aggregate and drift #13832 acceptance criteria:
    • "Cycle numbers recorded as a comment on this item." Met: the cycle report comment is in the PR context (138,705 chars over 268 skills).
    • "Delta against [Maintenance] Listing-budget watch: report the shared aggregate and drift #2023's 2026-08-12 cycle stated, with the drift signal called out." Met: the comment gives +40,323 (+41.0%) and calls out the drift signal.
    • "Schedule row advanced." Met by this diff. It is a data value that the diff itself shows, so it needs no test.
  • Verification: the PR says jq reads the row back with both new dates. That is the author's claim, and I did not verify it; I checked the dates by reading the file at head.
  • No plugin manifests changed, I saw no settled threads, there were no prior findings, and the PR context holds no embedded instructions aimed at this lane.

@github-actions

github-actions Bot commented Nov 6, 2026

Copy link
Copy Markdown
Contributor

claude-security-review reviewed 695b9d6c4a36d58dad3b9c6e2b652cc1cfa9ea1c: read 1 of 1 changed file(s); 0 finding(s), 0 as inline comments.

Security review: PR #13833

I found no security issues.

Scope. The pull request changes one file, .github/recurring-schedule.json, and I read all of its single hunk. That file is on the trusted-path list, so I read the whole change and what it controls.

Change. In the listing-budget-watch row, last_checked moves from 2026-08-08 to 2026-11-06 and next_due moves from 2026-11-06 to 2027-02-04. That is the 90-day quarterly step the PR description gives. Nothing else in the row changes: area, category, triggers, notes and close_previous are all as they were. No other row is touched.

What it controls. The row only decides when the next report-only maintenance routine comes due. Its notes say that routine records numbers and never edits descriptions. The two new values are plain dates, so:

  • no actor, token scope or untrusted-text path is widened;
  • no merge hold is weakened;
  • the kill switch is unaffected;
  • no new command or input reaches a lane.

The trusted-path match by itself is not a finding.

PR context. The description and the closing-issue comments contain no embedded text telling the lane to pass the PR, skip a check or drop a finding.

Spend. The change starts no new run. It moves the next prepaid lane run of this routine back by one quarter.

critical-findings: 0

@kyle-sexton
kyle-sexton added this pull request to the merge queue Nov 6, 2026
Merged via the queue into main with commit f610004 Nov 6, 2026
72 checks passed
@kyle-sexton
kyle-sexton deleted the chore/13832-recheck-listing-budget branch November 6, 2026 21:16
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

[Maintenance] Listing-budget watch: report the shared aggregate and drift

1 participant