Skip to content

fix(planning): put the Step 4 brief cross-check and the confirmation gate in the interview Gates block #9864

Description

@kyle-sexton

Problem

#6050 finding I9: compaction re-attaches only the first 5,000 tokens of a skill (https://code.claude.com/docs/en/skills.md). plugins/planning/skills/interview/SKILL.md is 496 lines and 75,445 bytes on main. The Gates block (lines 57-64) now carries the Step 3 register-gate command, but the Step 4 --brief cross-check and the confirmation gate (line 398) are stated only past byte 20,000, so a compacted session can lose them. Their sections are digest-pinned in plugins/planning/tests/interview-defenses.test.sh; the attended-only re-pin gate was removed on 2026-10-24 (C12), so this slice re-pins in the same change.

What to build

  • Add the confirmation gate and the Step 4 check-open-questions.sh --ledger ... --brief ... command to the Gates block, each pointing at its full rule.
  • Re-pin the affected digests in interview-defenses.test.sh.
  • Planning version bump and changelog fragment.

Done when

  • git show HEAD:plugins/planning/skills/interview/SKILL.md | head -c 20000 | grep -c -e '--brief' prints 1 or more.
  • git show HEAD:plugins/planning/skills/interview/SKILL.md | head -c 20000 | grep -c 'Confirmation gate\|confirmation gate' prints 1 or more.
  • bash plugins/planning/tests/interview-defenses.test.sh exits 0.
  • git grep -n 'plugins-reference.md' -- plugins/planning prints nothing.
  • /skill-quality:check on plugins/planning reports no FAIL.

Split from the parent by the owner's HITL session (2026-10-24) under Q93 (split before any run). Paths and line numbers checked on origin/main 2f6b81e; recheck before building.

Activity

  1. added theissue type on Oct 24, 2026
  2. added
    needs-triage
    on Oct 24, 2026
  3. github-actions commented on Oct 24, 2026

    @github-actions
    Contributor

    Proposed work class: work-class: scoped
    Basis: automated intake triage; the lanes App applied this class.

    Size: Small
    Complexity: Low
    Uncertainty: Known
    Flags: none
    Blocked by: none

    Decision recorded.

    This answers the lane's re-pin question (#9864 (comment)) and confirms the scope is still open. Read at origin/main 60b4096a4a. #10140 (commit 68d3f2bd81, "let any session re-pin an interview-defenses digest") landed the C12 removal, which was option (a) in that question: plugins/planning/tests/interview-defenses.test.sh no longer carries the attended-only wording.
    [quote truncated; the full decision is at the link]

    #9864 (comment)

    The decision settles the open re-pin question, so nothing is asked again.

    I understood the work as follows. Add the Step 4 --brief cross-check and the confirmation gate to the interview skill's Gates block, so both sit inside the first 20,000 bytes. Then re-pin the affected digests, bump the planning version, and add a changelog fragment. The five done-when checks are all runnable. #8466 edits the same files, so whichever merges second rebases.

    Automated triage, applied by the lanes App.

  4. added and removed
    needs-triage
    on Oct 24, 2026
  5. changed the issue type fromtoon Oct 24, 2026
  6. added
    status: ready
    agent-ready
    and removed on Oct 24, 2026
  7. melodic-automation-lanes commented on Oct 24, 2026

    @melodic-automation-lanes
    Contributor

    The work-resolve-issue lane stopped on its usage limit, not on this issue. It keeps agent-ready, and work-unblock starts it again after 2026-10-25T16:00:00Z.

    Run: https://github.com/melodic-software/claude-code-plugins/actions/runs/40140193714

  8. added
    agent-ready
    and removed
    agent-ready
    on Oct 25, 2026
  9. added
    needs-human
    on Oct 25, 2026
  10. 10 remaining items

  11. removed
    status: ready
    on Oct 30, 2026
  12. melodic-automation-lanes commented on Oct 30, 2026

    @melodic-automation-lanes
    Contributor

    The latest triage verdict holds nothing: the issue is at status: ready.

  13. added
    status: ready
    and removed
    status: ready
    on Oct 30, 2026
  14. kyle-sexton commented on Nov 1, 2026

    @kyle-sexton
    MemberAuthor

    Decision recorded.

    This answers the lane's re-pin question (#9864 (comment)) and confirms the scope is still open. Read at origin/main 60b4096a4a. #10140 (commit 68d3f2bd81, "let any session re-pin an interview-defenses digest") landed the C12 removal, which was option (a) in that question: plugins/planning/tests/interview-defenses.test.sh no longer carries the attended-only wording. The work itself is not done: the Gates block (plugins/planning/skills/interview/SKILL.md:57-64) still names only three gates, and the first 20,000 bytes of that file contain neither --brief nor "confirmation gate". The confirmation gate is stated at :295 and the Step 4 --brief cross-check at :337. Agents decided this on evidence under standing direction §1.

    Acceptance criteria:

    • git show HEAD:plugins/planning/skills/interview/SKILL.md | head -c 20000 | grep -c -e '--brief' prints 1 or more.
    • git show HEAD:plugins/planning/skills/interview/SKILL.md | head -c 20000 | grep -c 'Confirmation gate\|confirmation gate' prints 1 or more.
    • bash plugins/planning/tests/interview-defenses.test.sh exits 0.
    • git grep -n 'plugins-reference.md' -- plugins/planning prints nothing.
    • /skill-quality:check on plugins/planning reports no FAIL.

    Route: lane (agent-ready via intake). #8466 edits the same SKILL.md and test file, so the second to merge rebases on the first.

  15. added
    needs-triage
    and removed
    status: confirmed
    needs-triage
    on Nov 1, 2026
  16. added
    status: ready
    admission-deferred
    agent-ready
    and removed
    admission-deferred
    on Nov 1, 2026
  17. github-actions commented on Nov 1, 2026

    @github-actions
    Contributor
    No description provided.
  18. github-actions commented on Nov 1, 2026

    @github-actions
    Contributor
    No description provided.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    agent-readystatus: ready

    Type

    Fields

    No fields configured for Task.

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions