Skip to content

ci: cut push-to-green wall time on planning PRs #8487

Closed

Description

@kyle-sexton

Problem (P1, owner: "This slowness is bad. Performance is shit here.")

#8471 (head 21c10b5): ~9-10 min from push to green ci-status. Long poles: test-bash (0) 7m42s (it carries the planning browser suites), test-python legs 4-5 min, test-windows-worktree 5 min. (GitHub Support data.)

Fix

  1. Shard the planning browser suites (plugins/planning/shared/tests/ui*.js via ui.test.sh) across more test-bash legs, the way local UI_JOBS parallelizes them, so no single leg carries them all.
  2. Skip test-windows-worktree when a PR touches only plugins/planning/shared (check whether ci: cut jobs per lane-PR push under the hosted concurrency cap #8467's affected-paths gate already covers it; extend it if not, failing open on unclassified paths).
  3. Rebalance test-python legs if one leg is the long pole.

Measure

p50/p90 minutes from push to green ci-status per PR (GitHub Support adds it to the dashboard), before and after.

Related: #8463 / #8467 (jobs per push).

🤖 Generated with Claude Code

Activity

  1. added
    needs-triage
    on Oct 19, 2026
  2. github-actions commented on Oct 19, 2026

    @github-actions
    Contributor

    Thanks for the report. Automated triage handed this issue to a maintainer.

    Proposed work class: work-class: structural
    Basis: automated intake triage; a maintainer confirms or changes it.

    Automated triage. A maintainer reviews it.

  3. added
    needs-human
    and removed
    needs-triage
    on Oct 19, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    needs-human

    Type

    Fields

    No fields configured for Task.

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions