You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
ci: cut jobs per lane-PR push under the 60-job hosted cap #8463
Every PR-triggered CI workflow cancels a superseded head's run (cancel-in-progress concurrency keyed on PR number); add it where missing.
pr-test-windows runs its 7 jobs only when a changed path can affect Windows behavior (an affected-paths gate), otherwise a single skip job so required/aggregate checks still resolve.
pr-feedback-dispatch also skips at job level when the review run's conclusion is cancelled (a job skipped by if: gets no runner, per run 39279516657).
Related
GitHub Support's limits dashboard tracks jobs in use vs 60.
Activity
github-actions commentedon Oct 19, 2026
Thanks for the report. Automated triage handed this issue to a maintainer.
Proposed work class: work-class: scoped
Basis: automated intake triage; a maintainer confirms or changes it.
Automated triage. A maintainer reviews it.