Skip to content

fix(ci): start no pr-feedback-dispatch runner for a skipped review run #7838

Closed

Description

@kyle-sexton

Problem

622 pr-feedback-dispatch runs (12,891 runner-seconds) in 24 h. About 284 completions of skipped (draft) review runs each start a runner (inferred count, not re-verified).

Root cause

.github/workflows/pr-feedback-dispatch.yml:31-34. The job if: checks the ref, event and head repo but not github.event.workflow_run.conclusion.

Proposed fix

Add && github.event.workflow_run.conclusion != 'skipped' to the if:.

Acceptance criteria

  • The completion of a skipped review run shows the dispatch job as skipped, with no runner started.
  • A success or failure completion still dispatches.

Found by the lane sweep of 2026-10-17 (Automation Lanes).

Activity

  1. added
    needs-triage
    on Oct 17, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    needs-triage

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions