Skip to content

guardrails: block-unresolved-pr-merge counts a cancelled run when the newest run of that check was skipped #7549

Closed

Description

@kyle-sexton

No related PR.

On #7548 at 093d823, test-bash and test-python each have two runs: one cancelled at 05:22:25Z (run 38855388907) and a newer skipped one at 05:25:10Z (run 38855405374). ci-status passed. The guard refused the merge with "Failing checks: test-bash, test-python".

Since #7499 the guard judges only the newest run of each check. A skipped newest run should count as non-failing, as it does for other checks, instead of falling back to the older cancelled run. Fix with a stay-quiet test that fails before the fix (docs/conventions/hook-precision).

🤖 Generated with Claude Code

https://claude.ai/code/session_01CQKJiE8NBix1bgynWFSkqp

Activity

  1. added
    needs-triage
    on Oct 16, 2026
  2. github-actions commented on Oct 16, 2026

    @github-actions
    Contributor

    Thanks for the report. Automated triage handed this issue to a maintainer.

    Automated triage. A maintainer reviews it.

  3. added
    needs-human
    on Oct 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    needs-humanneeds-triage

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions