You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
skills: cut restated upstream text to pointers (held form-only rows, group 1: planning, session-flow, work-items) - part 1 of 3 #16937
Part 1 of 3 of #15525, split at intake (owner Q93). The done-when below is copied from #15525 as written.
Done when
planning (rows planning-7, -10, -11, -19, -27, -36): each row is cut to an anchored pointer or stated as our own rule with its existing reason, or listed in the pull request body as skipped with its reason; every operative rule and its reason is still present.
No pointer gains an as-of date or recheck trigger.
Size: Medium
Complexity: Medium
Uncertainty: Knowable
Flags: none
Blocked by: none
Blast radius: the planning plugin's skill text (rows planning-7, -10, -11, -19, -27, -36), read by the models that run those skills and by maintainers.
Reversible: yes; revert the text edits.
Open questions: none
This is part 1 of 3 of #15525. It asks for six planning rows to be cut to anchored pointers, restated as our own rule with the existing reason, or listed as skipped in the pull request body. Every operative rule and its reason must stay, and no pointer gains an as-of date or recheck trigger. The done-when is exact, so I have no questions. Parts 2 and 3 are #16938 and #16939. They are sibling splits of the same parent, not duplicates.
This records a re-fire of an earlier stop, not a new one. The start gate stopped run 44297992481, the work-resolve-issue run that agent-ready started, before any model turn, because the GITHUB_TOKEN budget was under its start-gate share, or the window was projected to have under its start-project share of the header's limit left by the run's expected end (github-token start-gate, start-project and start-run-minutes in rate-limits.json; the run's start-gate notice names which); that run ended at 2026-11-18T12:34:57Z. work-unblock has now removed and added agent-ready back to start a fresh run. A budget stop is the lanes' load, not a fault in this issue: it never counts toward limits.limit-stops-per-issue or the kill-switch wait.
Activity
github-actions commentedon Nov 18, 2026
The triage sweep dispatched intake triage for this issue (dispatch 1; 2 runs that reach intake, or 6 dispatches, hand it to a maintainer).
github-actions commentedon Nov 18, 2026
Size: Medium
Complexity: Medium
Uncertainty: Knowable
Flags: none
Blocked by: none
Blast radius: the planning plugin's skill text (rows planning-7, -10, -11, -19, -27, -36), read by the models that run those skills and by maintainers.
Reversible: yes; revert the text edits.
Open questions: none
This is part 1 of 3 of #15525. It asks for six planning rows to be cut to anchored pointers, restated as our own rule with the existing reason, or listed as skipped in the pull request body. Every operative rule and its reason must stay, and no pointer gains an as-of date or recheck trigger. The done-when is exact, so I have no questions. Parts 2 and 3 are #16938 and #16939. They are sibling splits of the same parent, not duplicates.
Automated triage. A maintainer reviews it.
melodic-automation-lanes commentedon Nov 18, 2026
{"v":1,"actor_id":337595936,"title_sha256":"77c873f2aad30c3cc2bf969f775d802ae4ebbb42e935a65cea0bd8a2a009bd2f","body_sha256":"c5f28ac3e5d140d209136b5eddff07035cb78d8af5f619e18c7fd86a17377f36"}
melodic-automation-lanes commentedon Nov 18, 2026
{"v":1,"actor_id":337595936,"title_sha256":"77c873f2aad30c3cc2bf969f775d802ae4ebbb42e935a65cea0bd8a2a009bd2f","body_sha256":"c5f28ac3e5d140d209136b5eddff07035cb78d8af5f619e18c7fd86a17377f36"}
melodic-automation-lanes commentedon Nov 19, 2026
This records a re-fire of an earlier stop, not a new one. The start gate stopped run 44297992481, the work-resolve-issue run that
agent-readystarted, before any model turn, because the GITHUB_TOKEN budget was under its start-gate share, or the window was projected to have under its start-project share of the header's limit left by the run's expected end (github-token start-gate, start-project and start-run-minutes in rate-limits.json; the run's start-gate notice names which); that run ended at 2026-11-18T12:34:57Z. work-unblock has now removed and addedagent-readyback to start a fresh run. A budget stop is the lanes' load, not a fault in this issue: it never counts toward limits.limit-stops-per-issue or thekill-switchwait.github-actions commentedon Nov 19, 2026