You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
skills: cut restated upstream text to pointers (held form-only rows, group 5: thirty plugins) - part 9 of 9 #16879
Size: Small
Complexity: Low
Uncertainty: Known
Flags: none
Blocked by: none
Blast radius: skill text in three plugins (plugin-quality, user-experience, visualization), read by the models that load those skills.
Reversible: yes; revert the text edits.
Open questions: none
This is part 9 of 9 of #15529. It asks for one row in each of three plugins. Each row is either cut to a pointer to the upstream text, stated as our own rule with its reason, or listed as skipped with its reason. The sibling parts (#16871 to #16878) cover other plugins, so this is not a duplicate of any of them.
This records a re-fire of an earlier stop, not a new one. The start gate stopped run 44560164431, the work-resolve-issue run that agent-ready started, before any model turn, because the GITHUB_TOKEN budget was under its start-gate share, or the window was projected to have under its start-project share of the header's limit left by the run's expected end (github-token start-gate, start-project and start-run-minutes in rate-limits.json; the run's start-gate notice names which); that run ended at 2026-11-19T16:09:11Z. work-unblock has now removed and added agent-ready back to start a fresh run. A budget stop is the lanes' load, not a fault in this issue: it never counts toward limits.limit-stops-per-issue or the kill-switch wait.
Activity
github-actions commentedon Nov 17, 2026
Size: Small
Complexity: Low
Uncertainty: Known
Flags: none
Blocked by: none
Blast radius: skill text in three plugins (plugin-quality, user-experience, visualization), read by the models that load those skills.
Reversible: yes; revert the text edits.
Open questions: none
This is part 9 of 9 of #15529. It asks for one row in each of three plugins. Each row is either cut to a pointer to the upstream text, stated as our own rule with its reason, or listed as skipped with its reason. The sibling parts (#16871 to #16878) cover other plugins, so this is not a duplicate of any of them.
Automated triage. A maintainer reviews it.
melodic-automation-lanes commentedon Nov 17, 2026
{"v":1,"actor_id":337595936,"title_sha256":"5032f1822df955f5aa6574b0be3c98f1ec114ce32de0791eed9a391ec285a135","body_sha256":"e7b779a0ad3b4c51904d5f054da298d1853f1f8520b60337afd5b6a098c6b9c2"}
melodic-automation-lanes commentedon Nov 18, 2026
{"v":1,"actor_id":337595936,"title_sha256":"5032f1822df955f5aa6574b0be3c98f1ec114ce32de0791eed9a391ec285a135","body_sha256":"e7b779a0ad3b4c51904d5f054da298d1853f1f8520b60337afd5b6a098c6b9c2"}
melodic-automation-lanes commentedon Nov 19, 2026
This records a re-fire of an earlier stop, not a new one. The start gate stopped run 44560164431, the work-resolve-issue run that
agent-readystarted, before any model turn, because the GITHUB_TOKEN budget was under its start-gate share, or the window was projected to have under its start-project share of the header's limit left by the run's expected end (github-token start-gate, start-project and start-run-minutes in rate-limits.json; the run's start-gate notice names which); that run ended at 2026-11-19T16:09:11Z. work-unblock has now removed and addedagent-readyback to start a fresh run. A budget stop is the lanes' load, not a fault in this issue: it never counts toward limits.limit-stops-per-issue or thekill-switchwait.github-actions commentedon Nov 20, 2026
github-actions commentedon Nov 20, 2026