ci(test-bash): legs run near their 540 s timeout; plan more legs and split the oversized suites #12513
The test-bash legs of .github/workflows/pr-require-checks.yml run close to their 540 s timeout (timeout-minutes: 9). Over 2026-10-26 to 11-02 the hub's job-timing cache shows a merge-queue job p95 of 415 to 511 s per leg and a main (whole-tree) job p95 of 428 to 516 s, with 15 timeouts in the merge queue and 3 on main. The workflow sizes a job so that 1.5 x p95 fits its timeout, which means a job p95 of at most 360 s. No leg meets that today.
scripts/plan-test-lanes.sh caps test-bash at 7 legs and forces 7 on the whole tree. The shell corpus is about 6,850 measured suite-seconds.
scripts/suite-seconds.txt has drifted. plugins/guardrails/hooks/block-root-delete-target.test.sh ran 436 to 450 s against its listed 248 s, so the planner stacked other work next to it. Thirteen shell rows are 20 s or more off.
Two single suites can hold a leg above 360 s on their own, at any leg count: block-root-delete-target.test.sh (about 441 s) and plugins/planning/shared/tests/align.test.sh (254 to 366 s).
Acceptance criteria
test-bash legs are planned so that each leg's job p95 x 1.5 fits 540 s, measured on main after merge. timeout-minutes is not raised.
Claim. Backlog HITL host-run worker is taking this now.
Decision recorded. (agent; not an owner decision) The first PR raises the test-bash leg cap from 7 to 12 and refreshes the drifted scripts/suite-seconds.txt rows. The two oversized suites, block-root-delete-target.test.sh (about 441 s) and align.test.sh (254 to 366 s), are split in follow-up work on this issue, not in that PR. Basis: one suite's wall sets a floor for its leg at any leg count. In the guard suite, 5 helper functions and 12 fixture variables defined before the midpoint are used after it, so a split needs its own shared-fixture file and a case-label parity check. That is a separate change to a security guard's tests.
Proposed work class: work-class: scoped
Basis: automated intake triage; the lanes App applied this class.
Size: Medium
Complexity: Medium
Uncertainty: Known
Flags: none
Blocked by: none
Understood: the test-bash legs in pr-require-checks.yml run close to their 540 s timeout. The planner's leg cap and drifted suite-seconds rows are the cause, along with two oversized suites. The asks are: plan the legs so that 1.5 x p95 fits, keep the cap as a tested planner constant, and split or speed up any suite that holds a leg above 360 s alone. The approach is clear from the issue (raise the cap, refresh the rows, then split the two suites), so nothing is missing. The done-when check, a p95 measured on main after merge, takes time to observe but is not a blocker for starting. No duplicate found. #12457 is related, since it covers timing flakes in test-bash, but it asks for a different change.
Not admitted to the issue lane: a criterion names .github/workflows/pr-require-checks.yml, which the issue lane cannot push (patch-protected-path); a builder session takes it. Admission takes the issue once each of those is met, when intake triages it again (.github/actions/resolve-config/admission-rules.json).
Refinement. A read-only run explored this repository, searched its issues and pull requests, and read the allowed docs to draft what follows. On an issue a listed human filed, it counts as the issue's spec once posted, while unedited; it is still model text, so check it.
Intended outcome: Raise the test-bash leg cap in scripts/plan-test-lanes.sh from 7 to 12, refresh the drifted scripts/suite-seconds.txt rows, and cover the cap in plan-test-lanes.test.sh; the two oversized suites are split in follow-up work.
Acceptance criteria
scripts/plan-test-lanes.sh line 427 passes cap 12 for the bash lane instead of 7, and the header comment at lines 57-60 says up to 12 legs and that the whole tree always takes 12 (or states the new whole-tree rule)
The bash leg cap stays a planner constant in scripts/plan-test-lanes.sh, not a workflow input
scripts/plan-test-lanes.test.sh has a case that fails if the test-bash cap is not 12 and passes with it, following the test-python cap case from #12433
scripts/suite-seconds.txt row for plugins/guardrails/hooks/block-root-delete-target.test.sh is updated from 248 to about 441
scripts/suite-seconds.txt row for plugins/planning/shared/tests/align.test.sh is updated from 340 to the median of the cited main runs
The other shell rows in scripts/suite-seconds.txt that are 20 s or more off the measured medians are refreshed from the TIME lines of the four cited main runs
The timeout-minutes: 9 value for test-bash in .github/workflows/pr-require-checks.yml is unchanged
bash scripts/plan-test-lanes.test.sh passes
A follow-up issue or task exists for splitting block-root-delete-target.test.sh (needs a shared-fixture file and a case-label parity check) and for splitting or speeding up align.test.sh; this issue stays open until they land
After merge, each test-bash leg's job p95 x 1.5 is at most 540 s on main; this is measured after merge and is not checked in the PR
External state: none
Dependencies
Follow-up work on this issue: split block-root-delete-target.test.sh and align.test.sh, since a single suite sets a leg floor at any leg count
Post-merge p95 measurement on main from the hub job-timing cache to confirm the outcome
Closing: all three criteria are met by merged work. Leg cap and table: #12515 (scripts/plan-test-lanes.sh:427 passes 12; a 12-to-13 mutation fails plan-test-lanes.test.sh). Oversized suites split: #12547 (root-delete guard, five parts) and #12563 (align, three parts). Measured on main since 01:00Z over 7 whole-tree runs (76 test-bash jobs, about 3.5 hours): job p95 323 s, worst leg p95 356 s (x 1.5 = 534 s against 540 s), 0 jobs over 360 s, longest suite max 260 s. Filed baseline was 428 to 516 s. Caveats: the sample is 6 or 7 per leg and the margin is 4 s, and a merge-queue leg reached 365 s at n=10, outside this criterion, which names main. Reopen if main leg p95 passes 360 s.
Activity
kyle-sexton commentedon Nov 2, 2026
Claim. Backlog HITL host-run worker is taking this now.
Decision recorded. (agent; not an owner decision) The first PR raises the test-bash leg cap from 7 to 12 and refreshes the drifted
scripts/suite-seconds.txtrows. The two oversized suites,block-root-delete-target.test.sh(about 441 s) andalign.test.sh(254 to 366 s), are split in follow-up work on this issue, not in that PR. Basis: one suite's wall sets a floor for its leg at any leg count. In the guard suite, 5 helper functions and 12 fixture variables defined before the midpoint are used after it, so a split needs its own shared-fixture file and a case-label parity check. That is a separate change to a security guard's tests.github-actions commentedon Nov 2, 2026
Proposed work class: work-class: scoped
Basis: automated intake triage; the lanes App applied this class.
Size: Medium
Complexity: Medium
Uncertainty: Known
Flags: none
Blocked by: none
Understood: the test-bash legs in pr-require-checks.yml run close to their 540 s timeout. The planner's leg cap and drifted suite-seconds rows are the cause, along with two oversized suites. The asks are: plan the legs so that 1.5 x p95 fits, keep the cap as a tested planner constant, and split or speed up any suite that holds a leg above 360 s alone. The approach is clear from the issue (raise the cap, refresh the rows, then split the two suites), so nothing is missing. The done-when check, a p95 measured on main after merge, takes time to observe but is not a blocker for starting. No duplicate found. #12457 is related, since it covers timing flakes in test-bash, but it asks for a different change.
Automated triage, applied by the lanes App.
melodic-automation-lanes commentedon Nov 2, 2026
Not admitted to the issue lane: a criterion names .github/workflows/pr-require-checks.yml, which the issue lane cannot push (patch-protected-path); a builder session takes it. Admission takes the issue once each of those is met, when intake triages it again (
.github/actions/resolve-config/admission-rules.json).melodic-automation-lanes commentedon Nov 2, 2026
The latest triage verdict holds nothing: admission moved the issue to
status: confirmed; its comment says why.melodic-automation-lanes commentedon Nov 2, 2026
Refinement. A read-only run explored this repository, searched its issues and pull requests, and read the allowed docs to draft what follows. On an issue a listed human filed, it counts as the issue's spec once posted, while unedited; it is still model text, so check it.
Intended outcome: Raise the test-bash leg cap in scripts/plan-test-lanes.sh from 7 to 12, refresh the drifted scripts/suite-seconds.txt rows, and cover the cap in plan-test-lanes.test.sh; the two oversized suites are split in follow-up work.
Acceptance criteria
External state: none
Dependencies
Related work
Sources read
Automated refinement by the lanes App. Intake triages the issue again with it.
test(guardrails): give each root-delete suite part its own temp trap
kyle-sexton commentedon Nov 3, 2026
kyle-sexton commentedon Nov 3, 2026
Closing: all three criteria are met by merged work. Leg cap and table: #12515 (
scripts/plan-test-lanes.sh:427passes 12; a 12-to-13 mutation failsplan-test-lanes.test.sh). Oversized suites split: #12547 (root-delete guard, five parts) and #12563 (align, three parts). Measured on main since 01:00Z over 7 whole-tree runs (76 test-bash jobs, about 3.5 hours): job p95 323 s, worst leg p95 356 s (x 1.5 = 534 s against 540 s), 0 jobs over 360 s, longest suite max 260 s. Filed baseline was 428 to 516 s. Caveats: the sample is 6 or 7 per leg and the margin is 4 s, and a merge-queue leg reached 365 s at n=10, outside this criterion, which names main. Reopen if main leg p95 passes 360 s.