Remove the completed briefs from the workspace follow-up note - #786
Conversation
TODO.md dropped thirteen of this note's nineteen research briefs across #477, #481, #499, #506 and #520, each time because the work landed — #481 says so in its own message: "the completed #2, #4, #6, #8, #9, and #17 backlog entries are removed while preserving the deferred evaluation work." The note kept them. It has been presenting finished work as the plan since 9 September, opening with "Start #2, #3 and #4 as one coordinated contract batch" when those three shipped that week. #666 already established the repair for four of them, trimming #6, #7, #16 and #17 and rewriting the cross-references that named them. This applies the same treatment to the thirteen that trim missed, leaving the six TODO.md still links: #11, #14, #19, #20, #22 and #23. The dated evidence sections stay, because they are the record of what was read on 8 September rather than a plan; the two sentences that pointed at briefs no longer here now say where those readings went.
leaf-agent
left a comment
There was a problem hiding this comment.
The attribution holds: I checked each of the thirteen removals against the cited commit's own TODO.md diff, and every one of them took its item out as complete. #11 is the one that needed care — c9eaa2c6 deleted it from the workspace group, but relocated it to General reader continuity rather than closing it, and the trim correctly keeps its brief. No surviving text references a removed ID, and all six TODO.md anchors resolve into the trimmed file.
One finding, on the only brief this PR rewrites rather than deletes.
#14's dependency line now reads Run against the adaptive Threads placement PR #520 settled. #520 settled the placement — it kept Threads beside the document when there is room and covering it on narrow screens — but it explicitly deferred the modality, and its commit message says so: "Record the general modal-focus work for covering workspaces separately so the continuation change does not expand into a riskier interaction redesign." That deferred work became #24 in TODO.md, and it landed a day later in 08b4de95 (#536, "Make covering workspaces modal"), which gave covering Threads native inertness, dialog semantics, focus containment and recovery, and reading-scroll routing.
That is precisely the surface #14 exists to verify, so the brief now hands its reader a criterion written for the world before it: Done when still says "Avoid imposing a modal focus trap on a nonmodal panel." An agent picking #14 up off TODO.md would read the focus containment #536 shipped as the defect to avoid, and would not think to check the modal boundary at all — the single thing the keyboard route most needs to cover now. Naming only #520 on the line directly above makes that reading more likely, not less, because the line asserts the dependency is closed.
I'm pushing the fix: the Done when criterion states the containment the shipped modality requires, and the dependency line names both settlements. The dated Evidence / confidence sentence keeps "covering and nonmodal Threads" untouched — it records what the journey covered on 8 September, and this PR's own reasoning for keeping the dated sections applies to it.
#14's dependency line named PR #520 as the settlement, but #520 kept the adaptive placement and deferred the modal-focus work to #24, which landed in PR #536 as inertness, dialog semantics and focus containment for a covering workspace. That is the surface #14 verifies, so its "Done when" still read "Avoid imposing a modal focus trap on a nonmodal panel" — the containment #536 shipped, described as the defect to avoid. State the containment the shipped modality requires and name both settlements. The dated evidence sentence is left as the 8 September record.
notes/workspace-followups.mdhas been presenting finished work as the plan since 9 September. It opens with "Start #2, #3 and #4 as one coordinated contract batch; run the review-queue simplification #8 alongside it" — all four of those shipped that week — and carries thirteen briefs, each with a live "Next task" and "Done when", for workTODO.mddropped as complete. This removes them and leaves the sixTODO.mdstill links: #11, #14, #19, #20, #22 and #23.The trim follows the convention #666 set and the reason
CLAUDE.mdgives for it: a note is never a second specification for shipped behavior. #666 removed #6, #7, #16 and #17 the same way, rewriting the twoOwner / dependencieslines in surviving briefs that named them; it simply did not reach the rest.Each removal is evidenced by the commit that took the item out of
TODO.md, not by a reading of the current code:TODO.mdby0f7f06a6— "Completed workspace items #1, #3, and #5 are removed fromTODO.md"28b5da99— "the completed #2, #4, #6, #8, #9, and #17 backlog entries are removed while preserving the deferred evaluation work"6df40353— "closes three bounded workspace follow-ups"c9eaa2c6— the continuation cue and the adaptive Threads placemente46c8b93— the monitoring workspace and its package-owned rootAlongside the briefs, three group headings are now empty and go; the
Suggested work packagestable loses the rows whose whole scope landed; and four cross-references that named a removed ID are rewritten — #14's dependency on the Threads-placement experiment, #20's ordering behind #8, and the two sentences inReproduction recordandBrowser evidencethat pointed at briefs no longer here.#14 needed more than a rewritten pointer. The experiment it waited on was settled in two steps, and only the first removed an ID: PR #520 kept the adaptive placement and deferred the modal-focus work to #24, which landed in PR #536 as inertness, dialog semantics and focus containment for a covering workspace. That is the surface #14 exists to verify, so its
Done when— "Avoid imposing a modal focus trap on a nonmodal panel" — described the containment #536 shipped as the defect to avoid. It now states the containment the shipped modality requires, and the dependency line names both settlements.The dated evidence sections themselves stay. They are the record of what was read in a browser on 8 September, not a plan, and the note's own header scopes them to that date.
No test covers
notes/, and this changes no behavior, so there is nothing to regress.pre-commitpasses on the file; theTODO.md→ note anchors all still resolve, and no surviving text references a removed ID.