Repository navigation
Divide main's push and schedule ci reports' failures between their triage workers - #5700
Merged
Merged
Conversation
…rkers A scheduled run runs every test a push runs, so when both reports were diagnosed in one triage batch each worker bisected the same tests and filed duplicate cause issues. The push report now owns a failure a push run also shows; the schedule report covers what pushes don't run.
This was referenced Nov 8, 2026
max-sixty
approved these changes
Nov 18, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
When the push and schedule
cireports onmain(#3985, #4225) are diagnosed together, their workers now divide the failures instead of each bisecting the same tests. The push report owns any failure a push run also shows. The schedule report covers only what pushes don't run (journeys,nightlytests,test-macos) and links the push report's causes for the rest. The change is one paragraph inrunning-tend's A redcion main is live.A scheduled run includes every test a push runs (
ci.yaml's header), so the two reports' failures overlap almost entirely. The daily sweep's recovery dispatches both reports in one triage batch, and they run in parallel. Nothing in the bundled triage reference or this overlay divides the shared failures between them. The bundled ownership recheck before filing catches only part of it: the bisect work is spent long before a session files anything.Changes to agent instructions wait for the control-plane owner. #5197 also edits this file, in a different section (Weekly: test tier budgets), and the two don't conflict.
Evidence
cifailing onmain(push) #3985 job ran 193 min and itscifailing onmain(schedule) #4225 job ran 196 min, almost all of it local--run-mainreruns andgit bisectruns.cifailing onmain(schedule) #4225 found Count On me at the front of the tab's title while it is above zero #5591's breakage and opened test: expect On me's count in the tab title in eight revision tests #5631 at 08:51.cifailing onmain(push) #3985 had checked for owners only once, at 08:06, so at 10:31 it filed Seven revision tests fail on main since #5591 put On me's count in the tab title #5639 for the same cause, which test: expect On me's count in the tab title in eight revision tests #5631 then closed.cifailing onmain(schedule) #4225 at 09:20–09:35,cifailing onmain(push) #3985 again before filing Three margin and thread tests fail on main since #5410 made a click open a thread in its reply #5643 at 11:01).cifailing onmain(schedule) #4225 noticed its sibling only at 11:05 ("A concurrentcifailing onmain(push) #3985 session is filing the same causes right now"). It then waited about 12 min on that job's filings, and its confirmed attributions "matched theirs". That is roughly 60–90 min of browser-suite work that produced no new owner.