Mid-session, Leaf's plugin updated under a Claude Code session that was serving a page. Four things went wrong before the page and the session agreed on a version again. In the first three, Leaf read something the older install had vendored, either the page or a revision stamped under it, and failed in a way that didn't say so. The fourth happened while the hooks were running.
1. A reply fails schema validation where Leaf should ask for a re-vendor
On a page vendored by 525e21d, leaf response reply <ref> --ephemeral --text "…" from 1e9fad2 failed with:
Error: reply event is invalid: Additional properties are not allowed ('start' was unexpected)
After leaf page init <page>, the same command worked. leaf page picture on a page in that state refuses with "was vendored from another Leaf's runtime … re-vendor it with leaf page init <page>", which names the fix at once. The reply path validates against the page's registry and has no such check.
Expected: a command that writes the event log says the page was vendored by another Leaf and names leaf page init, instead of a schema error.
2. leaf page picture can't draw a comment made before a re-vendor
After leaf page init re-vendored the page, leaf page picture <page> <comment-id> still refused with "was vendored from another Leaf's runtime … re-vendor it with leaf page init <page>". The comment was on a revision stamped under the older install, and the picture checks that revision's layer, which re-running init can't change. The refusal names a fix that has already been applied.
Expected: the picture renders the comment's revision, or the refusal says the revision predates the current runtime.
3. A delivery names a command flag the running CLI doesn't have
One delivery's handling text said to answer with leaf thread reply <page> --for <event-id>. The leaf on the agent's PATH, 1e9fad2, has no --for, and answers with leaf response reply <answer.ref>. Delivery instructions come from the registry frozen with the page's latest revision, which was captured under the older layer, so re-vendoring doesn't change them until a revision is stamped under the new one. The next delivery named the right command.
Expected: a delivery's commands are ones the CLI the agent runs accepts.
4. A wake message arrived without its delivery
With the hooks running, new comments woke the session with Leaf's message "<page> has new input, which arrives with this message." The Claude Code contract, references/harness-claude-code.md, says of this message that "the input arrives with it." Nothing arrived with it, and no delivery was opened. The delivery came about eight minutes later, through the next prompt hook, and it carried every event from seq 38 on, most of them with answer: null. Meanwhile leaf wait printed only its one-line notice that the prompt hook would hand the input over.
Expected: the wake message carries the delivery.
Repro
- Part 1: vendor a page with 525e21d, then run
leaf response reply <ref> --ephemeralfrom 1e9fad2 without re-vendoring. - Part 2: make a drawing comment on a page, update the plugin and run
leaf page init, then runleaf page pictureon that comment. - Parts 3 and 4: no reduced repro. Both followed a plugin update in a long session that stayed open across it.
Seen on leaf 1e9fad2.
This was written by Claude Code on behalf of max-sixty
Activity
fix: name page version skew before admitting events (#2416)
leaf-agent commentedon Oct 11, 2026
Part 1 is fixed in merged #2416. New event writes now identify a page vendored by another Leaf before validating the event and direct the agent to
leaf page init. Theresponse reply --ephemeralregression failed before the fix and passes for both runtime and serving-code mismatches. The issue stays open for parts 2–4.For the historical picture in part 2,
cmd_pictureserves the comment's immutable revision. That preview binds to the revision's captured layer, so re-vendoring the current page cannot change the old revision that triggers the refusal. The command needs a historical-revision-specific result, or a way to render that revision with its own runtime.For part 3, delivery handling reads
active_registry, which is the latest revision's captured vocabulary. Re-vendoring alone does not update that capture, matching the stale command guidance in the report. The command guidance needs to agree with the running CLI even while the revision is older.For part 4, the wake path sends the one-line “input arrives with this message” prompt; the prompt or Stop hook supplies the delivery separately. I did not reproduce the reported eight-minute gap, so I cannot yet identify which hook or session transition delayed it. The message currently promises more than the wake call itself sends.
Keep open pages working across Leaf updates, breaking only at a proto…
Fix Draw release scaling, draft return, and re-vendored deliveries (#…
max-sixty commentedon Oct 25, 2026
Closing; each part is fixed or its premise is gone.
page pictureshould report the server'sforeign-revisionrefusal rather than time out; that small fix is going into a separate PR.leaf page initstamp a revision under the new layer at once, so deliveries carry the current CLI's commands.Refuse a snapshot of a revision saved before a protocol bump (#3870)